Rural Development And Panchayat Raj Department Tender
... More
The Rural Development And Panchayat Raj Department has issued a formal invitation for competitive bids for Renewal Of Bt Road 03 Nos Package No 01 in Nagapattinam, Tamil Nadu. The bid opening date for this tender is 16-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Rural Development And Panchayat Raj Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 May 2025
Closing Date30 May 2025
Tender AmountRefer Documents
Costs
EMD
₹ 2,73,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Renewal Of Bt Road 03 Nos Package No 01
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_141315_1Bid Award Id
ViewTender No
DIPR/2253/Tender/2024-25-01Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
-
-
-
... More
in Km. 0/0-2/621
314.17
-
-
... More
Providing and laying Tack coat over BT surface using 3.0 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
-
-
-
... More
Km 0/0-2/621
7863
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal with 44 kg of Bitumen for 1 CUM mixed in hot mix plant laying at site including cost and conveyance of metal from approved quarry labour charges for tamping to required level line and grade etc completed complaying with standard specification
-
-
-
... More
Km 0/0-1/0
7.94
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-2/621
235.89
-
-
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/0-1/0
120
-
-
... More
Km 1/0-2/0
120
-
-
... More
Km 2/0-2/621
74.17
-
-
... More
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
11
-
-
... More
Provision for KM Stones Size 1.65m x 0.45m x 0.15m
2
-
-
... More
Provision for Refixing/Repainting for Signboard
2
-
-
... More
Provision for Refixing/Repainting for Logo board
2
-
-
... More
Provision for Refixing/Repainting forCitizen information board
1
-
-
... More
Provision for Refixing/Repainting for Information board/Name board
1
-
-
... More
Provision for Refixing/Repainting for Maintenance board
1
-
-
... More
Provision for Incentive Board
1
-
-
... More
For the First Year from the date of completion of work
2.621
33613
88099.673
... More
For the Second Year from the date of cpmpletion of work
2.621
50420
132150.82
... More
For the Third Year from the date of completion of work
2.621
67227
176201.967
... More
For the Fourth Year from the date of completion of work
2.621
84034
220253.114
... More
For the Fifth Year from the date of completion of work
2.621
100840
264301.64
... More
02.Periodic Renewal of Black Topping to L - 37 VV Road to Keelapudhupalli Road KM 0/0-2/850 in Keelaiyur block
-
-
-
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
-
-
-
... More
in Km. 0/0-2/850
2047.68
-
-
... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
-
-
-
... More
in Km. 0/0-2/850
341.28
-
-
... More
Providing and laying Tack coat over BT surface using 3.0 Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
-
-
-
... More
Km 0/0-2/850
8550
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal with 44 kg of Bitumen for 1 CUM mixed in hot mix plant laying at site including cost and conveyance of metal from approved quarry labour charges for tamping to required level line and grade etc completed complaying with standard specification
-
-
-
... More
Km 2/0-2/850
4.9
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-2/850
256.5
-
-
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/0-1/0
120
-
-
... More
Km 1/0-2/0
120
-
-
... More
Km 2/0-2/850
101.28
-
-
... More
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
12
-
-
... More
Provision for KM Stones Size 1.65m x 0.45m x 0.15m
1
-
-
... More
Provision for Refixing/Repainting for Cautionary board
2
-
-
... More
Provision for Refixing/Repainting for Logo board
3
-
-
... More
Provision for Refixing/Repainting forCitizen information board
1
-
-
... More
Provision for Refixing/Repainting for Information board/Name board
1
-
-
... More
Provision for Refixing/Repainting for Maintenance board
1
-
-
... More
Provision for Incentive Board
1
-
-
... More
For the First Year from the date of completion of work
2.85
33613
95797.05
... More
For the Second Year from the date of cpmpletion of work
2.85
50420
143697
... More
For the Third Year from the date of completion of work
2.85
67227
191596.95
... More
For the Fourth Year from the date of completion of work
2.85
84034
239496.9
... More
For the Fifth Year from the date of completion of work
2.85
100840
287394
... More
03.Periodic Renewal of Black Topping to L - 022 Prathaparamapuram Kamachipuram road in Prathaparamapuram Panchatat KM 0/0- 0/876 in Keelaiyur block .
-
-
-
... More
Providing and laying Tack coat over BT surface using (0.2+0.25) Kg of bitumen vg30 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
-
-
-
... More
Km 0/0-0/876
2648.5
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50 mm using 45 mm IRC size HBG metal with 44 kg of Bitumen for 1 CUM mixed in hot mix plant laying at site including cost and conveyance of metal from approved quarry labour charges for tamping to required level line and grade etc completed complaying with standard specification
-
-
-
... More
Km 0/0-0/876
1.58
-
-
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20mm IRC Size HBG metal Bitumen for 1 CUM mixed in hot mix plant laying at site including cost and conveyance of metal from approved quarry labour charges for tamping to required level line and grade etc completed complaying with standard specification
-
-
-
... More
Km 0/0-0/876
7.49
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II)-Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-0/876
79.46
-
-
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/0-0/876
78.32
-
-
... More
Provision for Hectametre Stones Size 0.90m x 0.15m x 0.15m
4
-
-
... More
Provision for Refixing/Repainting for Cautionary board
3
-
-
... More
Provision for Refixing/Repainting for Logo board
2
-
-
... More
Provision for Refixing/Repainting forCitizen information board
1
-
-
... More
Provision for Refixing/Repainting for Information board/Name board
1
-
-
... More
Provision for Refixing/Repainting for Maintenance board
1
-
-
... More
Provision for Incentive Board
1
-
-
... More
For the First Year from the date of completion of work
0.876
33613
29444.988
... More
For the Second Year from the date of cpmpletion of work
0.876
50420
44167.92
... More
For the Third Year from the date of completion of work
0.876
67227
58890.852
... More
For the Fourth Year from the date of completion of work
0.876
84034
73613.784
... More
For the Fifth Year from the date of completion of work
0.876
100840
88335.84
... More
GST Amount for providing Service to Government Contract Works for the above RENEWAL & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?