Rural Development And Panchayat Raj Department Tender

... More
The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Madurai District Kottampatti Block 2 Nos Of Roads Under Pmgsy Incentive Fund (2025-26) in Madurai, Tamil Nadu. The bid opening date for this tender is 20-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 May 2025
Closing Date30 May 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
Km0/0 -3/600

1944

131

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal

-

-

-

... More
Km 0/0 -1/0

29.32

4062

-

... More
Km 1/0 -2/0

28.59

4072

-

... More
Km 2/0-3/0

30.93

4082

-

... More
Km 3/0-3/600

16.99

4082

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0 -1/0

4.02

4613

-

... More
Km 1/0 -2/0

5.15

4623

-

... More
Km 2/0-3/0

17.28

4633

-

... More
Km 3/0-3/600

2.66

4633

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km0/0 -3/600

13747.3

15

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using roviding and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects

-

-

-

... More
Km0/0 -3/600

549.89

10845

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0 -1/0

150

666

-

... More
Km 1/0 -2/0

150

676

-

... More
Km 2/0-3/0

150

686

-

... More
Km 3/0-3/600

90

696

-

... More
Supply and fixing of KM stone SI No. 43 A.

3

2730

-

... More
Supply and fixing of HM stone SI No. 44 A

15

780

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803

720

890

-

... More
Road Studs with Reflector

48

480

-

... More
Provision for Citizen information board

1

12300

-

... More
Provision for Name Board.

1

12150

-

... More
Provision for Sign Board.

21

4999

-

... More
Provision for Logo Board

2

4035

-

... More
Renewal Of Block Topping the Road from Melanatar mangalam - Kanduvapatti in Kottampatti Block under PMGSy Incentive Fund (2024-25)

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

-

-

-

... More
Km0/0 -1/330

1436.4

5

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

-

-

-

... More
Km0/0 -1/330

897.75

131

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal

-

-

-

... More
Km 0/0 -1/0

32.18

4251

-

... More
Km 1/0 -1/330

10.78

4251

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0 -1/0

2.53

4802

-

... More
Km 1/0 -1/330

0.71

4802

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.

-

-

-

... More
Km0/0 -1/330

5016.38

15

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using roviding and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects

-

-

-

... More
Km0/0 -1/330

200.66

10845

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0 -1/0

240

871

-

... More
Km 1/0 -1/330

79.2

880

-

... More
Supply and fixing of KM stone SI No. 43 A.

1

2730

-

... More
Supply and fixing of HM stone SI No. 44 A

8

780

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803

266

890

-

... More
Road Studs with Reflector

21

480

-

... More
Provision for Citizen information board

1

12300

-

... More
Provision for Name Board.

1

12150

-

... More
Provision for Sign Board.

4

4999

-

... More
Provision for Logo Board

1

4035

-

... More
Renewal Of Block Topping the Road from L089-Sekkipatti-Veeerasingampatti road (Road) in Kottampatti Block under PMGSy Incentive Fund (2024-25)

-

-

-

... More
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.

-

-

-

... More
For the second six months from the date of completion of work

3.6

33557

-

... More
For the second year from the date of completion of work

3.6

50397

-

... More
For the third year from the date of completion of work

3.6

66989

-

... More
For the fourth year from the date of completion of work

3.6

83994

-

... More
For the fifth year from the date of completion of work

3.6

100491

-

... More
Renewal Of Block Topping the Road from Melanatar mangalam - Kanduvapatti in Kottampatti Block under PMGSy Incentive Fund (2024-25)

-

-

-

... More
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.

-

-

-

... More
For the second six months from the date of completion of work

1.33

33557

-

... More
For the second year from the date of completion of work

1.33

50397

-

... More
For the third year from the date of completion of work

1.33

66989

-

... More
For the fourth year from the date of completion of work

1.33

83994

-

... More
For the fifth year from the date of completion of work

1.33

100491

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.