Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 May 2025
Closing Soon30 May 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Ramanathapuram District - Thiruppullani Block - Tn14-71r

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-2/0

60

-

-

... More
km 2/0-2/170

10.2

-

-

... More
Providing and fixing of Sign Board.

8

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.52

-

-

... More
km 1/0-2/0

4.43

-

-

... More
km 2/0-2/170

0.64

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-2/17

8137.5

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-2/17

244.13

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

434

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

2

-

-

... More
Supply and fixing of HM stone SI No. 44 A

8

-

-

... More
Renewal of the Road from Thandoorani road to Kundoorani (Km 0/0 - 1/130 ) 

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

1627.2

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

203.4

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-1/130

7.8

-

-

... More
Providing and fixing of Sign Board.

5

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.68

-

-

... More
km 1/0-1/130

0.35

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-1/130

4237.5

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/130

127.13

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

226

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Renewal of the Road from Nallangudi to Vadavalangulam (Km 0/0 - 1/740) 

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

1252.8

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

313.2

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-1/740

44.4

-

-

... More
Providing and fixing of Sign Board.

9

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.68

-

-

... More
km 1/0-1/740

3.26

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-1/740

6525

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/740

195.75

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

348

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

7

-

-

... More
Renewal of the Road from Periyapattinam Puthukudiyiruppu (Km 0/0 - 2/05 ) 

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

1476

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

369

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-2/0

60

-

-

... More
km 2/0-2/050

3

-

-

... More
Providing and fixing of Sign Board.

10

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.68

-

-

... More
km 1/0-2/0

4.54

-

-

... More
km 2/0-2/050

0.19

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-2/050

7687.5

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-2/050

230.63

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

410

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

2

-

-

... More
Supply and fixing of HM stone SI No. 44 A

8

-

-

... More
Renewal of the Road from Thiruppullani Regunathapuram Roadd to Sallithoppu (Km 0/0 - 2/006 ) 

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

1444.32

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

361.08

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-2/0

60

-

-

... More
km 2/0-2/006

0.36

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.68

-

-

... More
km 1/0-2/0

4.64

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-2/006

7522.5

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-2/006

225.68

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

401.2

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

2

-

-

... More
Supply and fixing of HM stone SI No. 44 A

8

-

-

... More
Providing and fixing of Sign Board.

17

-

-

... More
Renewal of the Road from Periyapattinam to Thangaiya nagar (Km 0/0 - 1/100) 

-

-

-

... More
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,

1584

-

-

... More
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.

198

-

-

... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0

-

-

-

... More
Km 0/0-1/0

60

-

-

... More
km 1/0-1/100

6

-

-

... More
Providing and fixing of Sign Board.

5

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
Km 0/0-1/0

4.68

-

-

... More
km 1/0-1/100

0.35

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per

-

-

-

... More
Km 0/0-1/100

4125

-

-

... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/100

123.75

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

220

-

-

... More
Supply and fixing of KM stone SI No. 43 A.

1

-

-

... More
Supply and fixing of HM stone SI No. 44 A

4

-

-

... More
Maintenance of the road

-

-

-

... More
Renewal of the Road from Thiruppullani - Regunathapuram road to Utharavai (Km 0/0 - 2/170 ) 

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

2.17

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
Renewal of the Road from Thandoorani road to Kundoorani (Km 0/0 - 1/130)

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.13

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
Renewal of the Road from Nallangudi to Vadavalangulam (Km 0/0 - 1/740)

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.74

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
Renewal of the Road from Periyapattinam Puthukudiyiruppu (Km 0/0 - 2/05 ) 

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

2.05

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
Renewal of the Road from Thiruppullani Regunathapuram Roadd to Sallithoppu (Km 0/0 - 2/006

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

2.006

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
Renewal of the Road from Periyapattinam to Thangaiya nagar (Km 0/0 - 1/100)

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.1

33557

-

... More
For the Second Year from the date of completion of work

-

50397

-

... More
For the Third Year from the date of completion of work

-

66989

-

... More
For the Fourth Year from the date of completion of work

-

83994

-

... More
For the Fifth Year from the date of completion of work

-

100491

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.