Public Works Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date10 Aug 2024
Closing Date28 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling and clearing away carefully and stacking materials useful for reuse of fire affected and Cracked Madras terrace roof of approximately 31cm thick and conveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers.

242

-

-

... More
Removal of the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers.

1205

-

-

... More
Racking out the brick joints of walls, arches, etc.,to a depth of approximately 5cm for a wall thickness of 45cm and above to remove the dead mortar in between the brick joints and cleaning the surface with coir brush and washed with pure water etc complete complying with standard specification and as directed by the departmental officers.

1205

-

-

... More
Clean removal of saline action over the stone pillars, brick wall etc., will paper pulp treatment by using floating paper, deionizer water, plastic bucket,coir, brush etc., complete complying with standard specification and as directed by the departmental officers.

1205

-

-

... More
Removing the existing vegetation growth in the Building by way of uprooting the plants manually and then drilling with power driller up to the root depth of plants obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growths and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. The cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges, etc., complete and complying with standard specification and as directed by the departmental officers.

-

-

-

... More
Small plant

25

-

-

... More
Medium plant

10

-

-

... More
Big plant

5

-

-

... More
Reconstruction of brick masonry wall with similar type of bricks in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9"x4"x3" (Specially manufacturing) and using Pollachi lime in all floors as per traditional preparation and documented type construction such as arches and lintels, walls, etc., complete complying with standard specification and as directed by the departmental officers.

16

-

-

... More
Pointing , grouting and filleting the brick joint of wall and arches with lime mortar 1:2 (one of lime and two of sand) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.

1205

-

-

... More
Carefully removing and scooped out the eroded and worn out bricks over the wall, arches and pillar etc and refixing and mending with similar bricks in lime mortar 1:2 (one of lime and two of sand) etc., complete complying with standard specification and as directed by the departmental officers.

-

-

-

... More
50 Nos Bricks

55

-

-

... More
25 Nos Bricks

35

-

-

... More
Strengthening the existing walls by providing grouting by formation of two holes of size 1" with required intervals - depth of 300mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using Pollachi lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.

485

-

-

... More
Replastering ( base plastering) the brick wall, pillars and arches, etc., with lime mortar 1:2 ( one of lime and two of sand) to a thickness of 30 mm laid in two layers of 15mm thick using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.

1205

-

-

... More
Replastering the ceiling, etc., with Lime mortar 1:1.5 (one Lime and one and half sand), 20mm thick using Pollachi lime in all floors including labour charges, etc., complete complying with standard specifications as directed by the departmental officers.

170

-

-

... More
Teakwood wrought & putup for joist, beam, rafters and purlins,etc., which are in full length new member placed for supporting the Madras Terrace roof/ Mangalore tiles roof or any other area in all floor as directed by the departmental officers by using well seasoned superior quality and approved variety of teakwood for heritage building work including fixing of iron holdfasts incase of doors, windows and ventilators etc.,and excluding cost of holdfasts and making necessary size holes in the masonry to receive the ends of wooden joists, beams, etc., all fixtures and fastenings etc., complete. Item to include all moulding and chamber to be made as per original design indicated by the Engineer In Charge. (The rate includes the cost of teakwood, labour charges for wrought and putup to the existing clue/design, fixing in position to true alignment and gradient wherever necessary. Complying with standard specifications and as directed by the departmental officers (sample of teakwood to be shown to the Executive Engineer concerned for approval before use on work). Application of Solignum on the wooden surface should also be done. In all floors

10.5

-

-

... More
Providing and fixing in position of cut stone bed blocks of size 1.20m x 0.50m x 0.20m using Cut stone for placing I-beams including cost of stone blocks,conveyance,lifting and placing in position as directed by the departmental officers.

20

-

-

... More
Supplying and fixing of best quality and approved variety of ISMB girder of required size and section of make TATA or equivalent of various span fixing below the madras terrace roof to support the roof in the places wherever necessary as directed by the departmental officers and fixed ISMB- grider ‘I’ Section over the bed blocks in the wall including cost of dismantling the brick work wherever necessary for fixing the ‘I’ Section and redoing the same and also the cost of ‘I’ Section labour charges hire charges for welding machineries, hoist for lifting and hire charges for hydraulic manuals Jacky and other allied tools etc., complete including the cost of porting of ISMB- grider ‘I’ section etc and one coat of red oxide primer etc., complete. The I beam has to be supported on brick wall using appropriate blocks so as to support the madras terrace roofing in all the floors etc., complete complying with standard specifications.(The make and brand of the ISMB girder I section should be got approved by the Executive Engineer before use on works).

4305

-

-

... More
Redoing of Madras Terrace roof in all floors with one layer of brick on edge course laid as first layer over the existing Teakwood joists, Beams, I Sections, etc., which are placed at roof level in all floors using specially manufactured Terrace bricks for heritage works of size 150mm x 75mm x 25mm in lime mortar 1:1.5 (one lime and one and half sand). The second layer is laid with specially manufactured Terrace bricks for Heritage works of size 150mm x 75mm x 25mm in flat manner in lime mortar 1:2 ( one lime and t\wo sand) 20mm thick as base layer laid over the top of brick on edge course. Brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be added) to the proportion of brick jelly to lime being 32:12.50 by volume laid over the second layer of terrace bricks for an average consolidated thickness of 100mm in a single layer of required slope/level as directed and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery (PALM JAGGERY) water. (Galnut of 10kg and jaggery of 10kg per one sq.m). The beating of the concrete is done continuously until the brick jelly lime concrete is well hardened. After ensuring the harden surface of brick jelly lime concrete, flat tiles of 150mm x 150mm x 25mm of specially manufactured

260

-

-

... More
superior quality to suit the heritage works is laid in two consecutive layers in lime mortar 1:2 (one lime and two sand) 15mm thick for each layer of flat tiles. The base mortar provided for the top course of flat tiles is mixed with SBR (Synthetic Butadiene Rubber) Polymer at the rate of 0.5 litres for one sq.m is applied for water proofing chemical treatment including neat finishing. The Materials like Terrace bricks for the heritage work as from Thirukkattupalli and Pollachi lime should only be used. The period of interval between laying of I layer, II layer of terrace bricks, brick jelly lime concrete and flat tiles in two consecutive layers as directed by the departmental officers etc., complete complying with standard specifications. The Madras Terrace roof laid over the roof joist, beam, etc., is well embedded in the wall to the required distance as directed by the Engineer In Charge. (The rate includes the cost of all materials like terrace brick for heritage works, brick jelly 20mm, Pollachi lime, flat tiles and SBR chemicals and labour charges for laying all items of works). Pollachi lime should only be used for preparation of mortar, brick jelly lime concrete etc.. The Terrace bricks, flat tiles should got approved by the Executive Engineer before use on works. The overall thickness of madras terrace roof laid is to be of 300mm as detailed below.

-

-

-

... More
Brick on edge course (I layer) = 75mm Base mortar for laying terrace bricks = 20mm Laying of terrace bricks (II layer) = 25mm Brick jelly lime concrete = 100mm Base mortar for flat tiles = 15mm Laying flat tiles(I course) = 25mm Base mortar for flat tiles (II layer) = 15mm Flat tiles (II course) = 25mm Total thickness = 300mm

-

-

-

... More
Grouting and stitching the cracked wall and arches by toothing method including required special bricks of size 8"x4"x2" wherever necessary cutting of groove and fixing of key stone of size 900mmx230mmx200mm in horizontal and finishing the surface with lime mortor as per orginal etc. excluding errection of scaffolding all labour charges, etc., complete and complying with standard specification and as directed by the departmental officers.

15

-

-

... More
Renewing the damaged sunshade of trapezoidal shape with new superior quality of teak wood, Manglore tile roofing at the top. The sunshade if fixed on wall with teak wood of size 80mmx 100 mm fixed on the wall directly, additional inclined brcing provides on the sides of window using teak wood sized 80mm x 80mm , the top teak wood 50mm x 80mm in cross section from the wall is rested at end running member 80mm x 100mm . The top manglore tiles are rested on best teak wood reepers of size 50mm x 25mm . the rate inclusive of cost of dismantling damged tile, teak wood members without damaging to the wall, refixing, labour charges, but excluding of scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.

25

-

-

... More
Renewing and fixing eaves board of size 25cm x 2cm using teakwood of best quality as per existing style inluding cost of teakwood, labour wrought and putup, labour charges for fixing in position etc.complete complying with standard specification.

35

-

-

... More
Supplying and fixing best quality of Bison cement bonded particle Board 10mm thick including labour charges for fixing the board including painting charges etc. complete complying with standard specification.

25

-

-

... More
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.

305

-

-

... More
Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Jet Black with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs with required cement slurry and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., The granite stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.

230

-

-

... More
Renewing and fixing 1/3rd panelled and 2/3rd glazed door shutter by using well seasoned teakwood of superior quality and approved variety as per the original design and pattern instructed by the Engineer In Charge.The door shutters is made with 1/3rd panelled shutters at bottom and 2/3rd glazed shutter at top. The door shutter is made with two number of 75mm x 35mm size vertical styles, toprail, lock rails and bottom rail of size 80mm x 35mm , 200mm x 35mm, 120mm x 35mm respectively. The bottom 1/3rd portion of door shutter panels is covered with teakwood planks of 35mm thick and top 2/3rd portion of the shutter panels is covered with 4mm thick plain glass. The 4mm thick plain glass is fixed with teakwood reepers of size 35mm x 30mm on both sides so as to divide the glass panels as 5 parts.Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers.(The rate inclusive of cost of all teakwood materials, labour wrought and putup of door shutters, cost of all furniture fittings, cost of 4mm thick plain glass, labour charges for fixing the shutters in position etc., complete complying with standard specifications.

4

-

-

... More
Making, supplying and fixing of panelled window of size 1.65x2.10m with Teak wood window shutter is made with two number of 75mmx35mm size vertical styles, top rail, lock rails and bottom rail of size 80mmx35mm,200mmx35mm, 129mmx25mm respectively . The window shutter panels is covered with teak wood planks of 35mm thick including all necessary fittings brass/steel hardwaraes like screws, nails, hinges, hooks, tower bolts, handle, aldrops of same design, size etc complete. item to also include making all the mouldings and design of the panels as in the existing evidence. item to include complete finishing of the shutters as directed by the departmental officer. (The rate inclusive of cost of all teak wood materials, Labour wrought and putup of door frames and shutters, cost of all furniture fittings, labour charges for fixing inposition etc., complete complying with standard specifications).

16

-

-

... More
Renewing and fixing teak wood panelled Door shutters openable type by using well seasoned teak wood of superior quality and approved variety as per the original design and pattern instructed by the Engineer in charge. The door shutter is made with two number of 120mmx40mm size vertical styles, top rail, lock rails and bottom rails of size 125mmx40mm,250mm x 40mm, 170mmx40mm respectively. The door shutter panels is covered with teak wood planks of 25mm thick including all necessary fittings brass/steel hardwares like screws, nails, hinges, hooks, tower bolts, handle, aldrops of same design, size etc complete. item to also include making all the mouldings and design of the panels as in the existing evidence. item to include complete finishing of the shutters as directed by the departmental officer. (The rate inclusive of cost of all teak wood materials, Labour wrought and putup of door frames and shutters, cost of all furniture fittings, labour charges for fixing inposition etc., complete complying with standard specifications. (Two leaves)

17

-

-

... More
Renewing and fixing of glazed ventilator with new Teak wood glazed ventilator of size 1.20m x 0.60m by using Teak wood scanting thickness of size 0.04m frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the ventilator in position with necessary furniture fittings including with neat finishing etc., complete complying with standard specifications and as directed by the departmental officers.

4

-

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

30

-

-

... More
Revarnishing with old/ new wood work with two coats of best melamine varnish of approved quality and brand including preparation of surface etc.. The rate is inclusive the cost of all material, labour charges and finishing neatly etc., complete compluing with standard specification and as directed by the departmental officers

65

-

-

... More
Painting with old wood works with two coats of Synthetic Enamel Paint of best approved first quality and colour of synthetic enamel paint over the priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

455

-

-

... More
Strengthening of the brick foundation of the wall with similar type of bricks by the method of mending / under pinning/ grouting etc., as per the existing clues with lime mortar 1:2, (one of lime and two of sand) etc., including scooping out the eroded/ damaged brick and cleaning the surface etc., complete complying with standard specification and as directed by the departmental officers.

-

-

-

... More
50 Nos Bricks

10

-

-

... More
25 Nos Bricks

20

-

-

... More
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.

-

-

-

... More
For Initial height of 3m

505

-

-

... More
For every additional 2.5m height

1355

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Plane surface such as Rcc floor slab, roof,slab,rectangular,square Tee or Ell beam, lintel, bed block staircase waist slab, landing slab, landing beam, portico beam, portico slab, etc.

220

-

-

... More
Providing additional strutting to centering of RCC slabs of plain surface for every additional 1.0 metre height or part thereof but not less than 30 cm, over the initial 3.00 metre height from floor level using casurina props of 10cm to 13cm dia including cross bracing etc., complete complying with standard specification and as directed by the department officers.

430

-

-

... More
White washing three coats of inner walls/ceiling with freshly burnt white shell lime (Pollachi lime) in all floors including cost of lime, blue powder fevicol type gum, brushes, The rate inclusive of cost of all materials and labour charges etc., complete complying with standard specification and as directed by the departmental officers

170

-

-

... More
Painting two coats of ready mixed Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmetal officers.

1205

-

-

... More
Supplying and fixing in position of Shade Net (Green Net) using vertical protection for under construction / High-rise building. The net standard size is 3mx50m &5mx50m. The rate is inclusive cost of Agro Shade Net, binding wire(or) cable tie, Labour charges for fixing in position and neatly etc complete complying with standard specification and as directed by the departmental officers.

645

-

-

... More
Labour charges for supplying and fixing of hoisting machine by hire basis for lifting of all materials from ground to terrace and shifting of damaged unused materials from terrace to ground floor with necessary rope, heisting platform, motor, controller as per site requirement days etc., the rate is inclusive of hire charges for machine, labour charges for operating the machine and daily Bata and conveyance charges and dismantling and removing the same after completion of work etc complete with standard specification and as directed by the departmental officers.

18

-

-

... More
Construction of mortar pit of inner size 0.90m x 0.45m with brick partition wall 11.50cm thick in cement mortar 1:3 (one cement and three sand) for 60cm height with necessary earth work open excavation for a size of 1.43m x 0.98m to a depth of 0.91m and sand filling for 15cm thick, Plain Cement Concrete 1:5:10 (one cement, five sand and ten 40mm HBG stone jelly), 8cm thick with plastering 1:5 (one cement and sand), 12mm thick on both sides and top etc., complying with standard specification and as directed by the departmental officers.

4

-

-

... More
Renewing the damaged ornamental cornice around the outer wall cornice portion as per existing style and clues to a height of 0.25m with top and bottom width of 0.28m and 0.08m respectively including removing the brick work and redoing the brick work in lime mortar 1:2 (one of lime and two of sand) and plastering with lime mortar 1:2 (one of lime and two of sand) 30mm thick laid in two layers and finishing with lime mortar 1:1.5 (one lime and one and half sand) 6mm thick (Theeravai) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.

205

-

-

... More
Supplying and fixing MS grills for doors, windows and ventilators of approved design and as directed by the departmental officers including cost of MS grills labour charges and cost of one of red oxide primer coat etc., complete complying with std. specification.

1310

-

-

... More
Providing pest control with antitermite treatement drilling holes at junction of walls with floors at 300mm intervals and injucting chemical emulsion on those with cement etc. making holes along the vertical surface out side the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical.(The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc complete complying with standard specification and as directed by the departmental officers.

210

-

-

... More
Providing temporary barricading arrangements alround the the site using PPGI sheet of 0.47mmthick shall be fixed in the frame for made out of required height using 50mmx50mm x2.60mm square MS tubes vertical strut placed and Horizental 32mmx32mmx2.60mm thick M.S. tubes at 1.20m interval with necessary scews and welding including cost of conveyance of all required materials to work site, erecting work, cost of J- bolts washers, cement concrete bed 45cmx45cmx90cm in Plain Cement concrete 1:2:4 and including labour charges etc complete., The barricading arranagements are made to prevent the entry of public into the site is very dangerous due to the fallen roof with necessary door arrangements for staffs and labour etc.,complete and as directed by the departmental officers. [The barricade will remain in the same location till the completion of the project and No additional charges shall be paid for the extended period of contract]

185

-

-

... More
Collecting the scattered debris from the campus and conveying away the same to outside by lorry to a lead of 9km including loading and unloading charges and dumping in low places and leveling etc., Complete complying with standard specification and as directed by the departmental officers.

160

-

-

... More
Supplying & filling in foundation & basement with M-sand filling in layers not more than 15cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

36

-

-

... More
Laying Brick jelly lime concrete in lime mortar 1:2 (One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers.

18

-

-

... More
GST 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.