Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Dec 2022
Closing Date28 Dec 2022
Tender Amount₹ 1,00,55,000
Costs
EMD
₹ 61,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HWAY_272072_1Bid Award Id
ViewTender No
TN.No.13/2022-23/SDO, Dt.06.12.2022-1Tender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
826.7
-
1857.93
... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
4155.7
-
78.06
... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5.
4155.7
-
18.54
... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kg of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 504 of MORTH rev-5.
208.4
-
8735.24
... More
Providing and laying 30mm thick Bituminous Concrete using 0.13cum of 19.00 - 9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26cum of 2.36mm & below size IRC metal with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site including heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant 20-30tones capacity, conveying the mix by tipper to paver site, spreading the mix in required temperature for uniform thickness 30mm with mechanical paver to the specfied grades and cross section and consolidated by 8-10t vibratory/pneumatic roller to the required density etc., including labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m, vibratory/pneumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per Clause 505 of MORTH rev-5.
124.7
-
11632.53
... More
Providing and laying earth for making up berms using Carted earth with a lead of 5 Km including Labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers.
764.7
-
214.01
... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 -1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).
1
-
906
... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).
4
-
256
... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALL.
286.6
-
212.5
... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTING OF RETAINING WALL (BELOW SILL).
68.3
-
5805.15
... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETAINING WALL (BELOW SILL).
125.8
-
7467.96
... More
Vibrated Cement concrete grade M20 Nominal Mix 1:1.5:3 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETAINING WALL (ABOVE SILL).
98
-
9570.79
... More
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE RETAINING WALL.
53
-
177.5
... More
Vibrated Cement concrete grade M15 Nominal Mix 1:2:4 using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for PARAPET IN RETAINING WALL.
36.9
-
8396.61
... More
Filling behind Retaining wall with Carted earth including cost and conveyance of earth to worksite, laying, handling charges and filling in layers including compacting with power roller to get the maximum density including watering and all other incidental charges etc, complete for RETAINING WALL.
44.5
-
187.85
... More
Refilling the excavated earth including conveyance of all materials to work site, including labour charges for filling in layers compacting by power roller under optimum moisture content to get maximum density of layers including all incidental charges etc, complete for forming embankment FOR RETAINING WALL (Labour Charges only).
286.6
-
47.34
... More
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
... More
Sub Total Amount for above all items (excluding GST)
1
-
8519770.24
... More
GST 18% for above SubTotal Amount
1
-
1533558.64
... More
Total in Figures (SubTotal + GST)
-
-
-