Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
National Bank For Agriculture And Rural Development - NABARD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date4 Nov 2022
Closing Date30 Nov 2022
Tender Amount₹ 3,58,00,000
Costs
EMD
₹ 1,92,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_HWAY_260782_1Bid Award Id
ViewTender No
TN No_8_2022_2023_ PalayanoorTender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing Reinforced Cement Concrete cast-in-situ bored piles of 1000mm diameter in RCC M35 (Design mix) 20mm ISS HBG metal with minimum cement content of 400 kg per cum maximum water cement ratio of 0.4 and slump of 150-200 mm by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost of 150-200mm by tremie concreting including cost and conveyance and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another location dismantling and including all labour for boring through all soils, leading the excavated material to a distance 200m including forming of working platform over the river bed for accomedating piling equipemet forming approaches to the working platform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as standard specification for PILES BELOW PIERS AND ABUTMENTS as per section 1100 & 1700 of MORT&H specification (V Revision) as per Standard Specification forming & mainly protective bunds & all other incidental charges etc complete
186
-
16858.48
... More
Plain Cement Concrete M15 using 40mm ISS metal including cost and conveyance of all materials to site and cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying, compaction, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, coffer dams, shoring, struting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW PILECAP OF PIERS AND ABUTMENTS as per section 1100 of MORT&H specification (V Revision)
9
-
6097.6
... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel, but including cost of form work, soft water,labour charges for mixing, transporting, laying, curing concrete working at depths, hire charges for tools and plants, including all other incidental charges, such as bailing out water, maintaining of protective bunds, coffer dams, shoring, struting etc., complete as per relevant standard specification for PILECAPS UNDER ABUTMENTS, PIERS AND RETURNS as per section 1100, 1500, & 1700 of MORT&H specification (V Revision)
160
-
9366.97
... More
Vibrated Reinforced Cement Concrete of grade M35(Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges such as bailing out water, maintaining of protective bunds, coffer dams, shoring, struting, etc., complete, for SUBSTRUCTURE OF ABUTMENTS AND RETURNS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision)
81
-
11530.96
... More
Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel, but including cost of formwork, labour charges for mixing , transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete, for BED BLOCK CUM DIRTWALL OVER ABUTMENTS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision)
17
-
12678.51
... More
Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete, for CIRCULAR PIER 1500 mm dia as per section 1500, 1700 & 2200 of MORT&H specification (V Revision)
3
-
14086.95
... More
Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete, for CAPPING BEAM OVER PIER as per section 1500, 1700 & 2200 of MORT&H specification (V Revision).
15
-
11777.73
... More
Vibrated Reinforced Cement Concrete M35 (Design mix), using 20mm ISS HBG Graded metal including cost and conveyance of all materials to site, and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete, for PEDASTAL OVER CAPPING BEAM AND BED BLOCKS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision).
1
-
9757.3
... More
Supplying and fixing of ELASTOMERIC BEARING of size 500 x 300 x 80 mm as shown in the drawing, including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges, etc., complete as per section 2200 of MORT&H specification (V Revision) & IRC 83-2018(Part-II)
144000
-
1.61
... More
Vibrated reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500, 1700 & 2300 of MORT&H specification (V Revision).
109
-
23825.13
... More
Vibrated reinforced Cement Concrete M35 (Design mix) using 20mm ISS HBG Graded metal a , including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel, but including cost of formwork, labour charges for mixing , transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, including inspection chamber, inclusive of 150mm ducts and other accessories of safty kerb etc., complete, for DECK SLAB, KERB & SAFETY KERB as per section 1500, 1700 & 2300 of MORT&H specification (V Revision).
143
-
15102.88
... More
Vibrated Reinforced Cement Concrete M40 (Design mix), using 20mm ISS HBG metal as including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hirecharge for tools and Plants, including all other incidental charges, etc., complete, for CRASH BARRIER as per section 811, 1700 & 2703.3 of MORT&H specification (V Revision).
28
-
15517.72
... More
Providing and fixing of G.I. DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,. complete as per section 2705 of MORT&H specification (V Revision).
20
-
2271
... More
Vibrated Cement Concrete M15 (Nominal mix ) using 40mm ISS metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, BASE COURSE BELOW APPROACH SLAB AND SAFTY KERB RAMP as per section 1500, 1700 & 2704 of MORT&H specification (V Revision).
16
-
6752.56
... More
Vibrated reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including labour charges for mixing , laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete For APPROACH SLABS as per section 1500, 1700 & 2704 of MORT&H specification (V Revision).
16
-
9136.05
... More
Vibrated Cement Concrete M15 (Nominal mix ) using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, soft water, Tools and plants and incidental charges etc., complete as per relevant standard specification, for CC PARAPET as per section 1500 & 1700 of MORT&H specification (V Revision).
8
-
10660.48
... More
Vibrated Cement Concrete M30 (Design mix), 75mm uniform thick with surface reinforcement conforming to section 2702.2 of MORTH 5th revision using 25mm, 12mm, 6mm ISS HBG Graded metal including cost and conveyance of all materials to work site including cost of cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for softwater, including all other incidental charges of formwork, cost of premoulded expansion joints and fixing the same in position etc., complete, for WEARING COAT OVER DECK SLABS AND APPROACH SLABS as per section 2702.2 of MORT&H specification (V Revision).
412
-
683.73
... More
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to spectifications for Road and Bridge Works_V Revision:2013 published published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MORT&H specifications, including lablour, equipment and incidental charges for fixing the joints complete in all respects, as per section 2600 of MORT&H specification (V Revision).
30
-
12710
... More
Providing and fixing CLASS I PVC SEEPAGE PIPES of 100 mm dia. of required lengths for abutments and returnwalls including costs and conveyance of all materials to work site and labour charges for fixing , etc., complete to drain the backfill as per section 2706 of MORT&H specification (V Revision).
68
-
177.5
... More
Providing FILTER MEDIA behind Abutment and Return for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH (V Revision) well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete as per clause 710.1.4 & Appendix 6 of IRC 78-2014
65
-
1437.7
... More
FILLING behind Abutments and Returns as per Appendix 6 of IRC: 78 -2014 with clean gritty free draining material including cost and draining material having Pi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads & lifts for water and all other incidental charges, etc., as per clause 710.1.4 & Appendix 6 of IRC 78-2014
121
-
442.68
... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per section 1600 of MORT&H specification (V Revision).
87
-
93229.27
... More
Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire ,provision of spacer bars, cover blocks and all other incidental charges etc complete, Fe-240 grade for mesh reinforcement as per section 1600 of MORT&H specification (V Revision).
3
-
93229.27
... More
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL.
168.16
-
106.25
... More
Supply and fixing of high quality of PVC pipes of 150mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in safety kerb.
220.16
-
419.7
... More
Sub estimate for Approach Road
-
-
-
... More
Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 95% Compaction for making up Approach road using Carted Earth with an average lead of 5Km MORTH Rev. V
122
-
184.5
... More
Earthwork for subgrade, shoulders and back fills in accordance with the specifications, lines, grades and cross sections as shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for making up Approach road using Carted Earth with an average lead of 5Km MORTH Rev. V
408.1
-
185.42
... More
Granular Sub-base with Graded Material Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to worksite, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)-for Grading V Material (Specification Number as per MORTH Rev.V 111,112,401,900).
212.71
-
1974.8
... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) (Specification Number as per MORTH Rev.V 111,112,406,900).
354.49
-
2254.03
... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM.(Specification Number as per MORTH Rev.V 111,112,502,900).
1417.96
-
75.59
... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900).
1417.96
-
17.6
... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.2 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over BT surfaces treated with primer.(Specification Number as per MORTH Rev.V 111,112,503,900).
187.5
-
24.3
... More
Bituminous Macadam - Providing and laying bituminous macadam 50mm compacted thick with Central Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II
70.9
-
8615.92
... More
Bituminous Concrete (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filer, transporting the hot mix to work site, laying wih a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading II.(Specification Number as per MORTH Rev.V 111,112,507,900).
48.18
-
11119.38
... More
Sub estimate for PCC Retaining wall
-
-
-
... More
Earthwork excavation in all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation of Retaining Wall
474.4
-
106.25
... More
Cement concrete M10 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for Levelling course of PCC Retaining wall
34.44
-
5414.13
... More
Vibrated Cement concrete M20 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for Footings of Retaining Wall
101.98
-
7049.01
... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Stem of Retaining Wall (below sill)
202.94
-
7291.16
... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Stem of Retaining Wall (Above sill)
260.21
-
8435.16
... More
Providing and fixing SEEPAGE PIPES of 100mm dia PVC pipes of required length for Retaining Wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall
224
-
177.5
... More
Sub estimate for River Training work
-
-
-
... More
Earthwork excavation in all classes of soils depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation of Retaining Wall
160.8
-
106.25
... More
Cement concrete M10 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for Levelling course of PCC Retaining wall
10.05
-
5414.13
... More
Vibrated Cement concrete M20 (Nominal Mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site and including soft water, labour charges for mixing, transporting, laying, curing and compacting concrete, hire charges for tools and plants and all other incidental charges etc., complete as per standard specification for Footings of Retaining Wall
33.08
-
6937.6
... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Stem of Retaining Wall (below sill)
74.87
-
7203.27
... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40 mm ISS size HBG graded Metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, hire charge for all tools and plants and all other incidental charges etc., complete as per relevant standard specifications for Stem of Retaining Wall (Above sill)
75.3
-
8684.41
... More
Providing and fixing SEEPAGE PIPES of 100mm dia PVC pipes of required length for Retaining Wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall
52
-
177.5
... More
Calculation of SubTotal, GST and Total carried out by system automatically
-
-
-
... More
Sub Total Amount for above all items (excluding GST)
1
-
30299228.16
... More
GST 18% for above SubTotal Amount
1
-
5453861.07
... More
Total in Figures (SubTotal + GST)
-
-
-
Evaluation Notes How It Works ?