The NABARD has issued a formal invitation for competitive bids for the National Bank For Agriculture And Rural Development project, for Upgradation Of Kalikottai - Modankurichi Road (via) Savulukottai Km 0/0-1/890. in Dharmapuri, Tamil Nadu, with an estimated contract value of Rs. 1,19,35,000. The bid opening date for this tender is 14-01-2023 and the last date for bid submission is 25-01-2023. Interested bidders for National Bank For Agriculture And Rural Development tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

National Bank For Agriculture And Rural Development - NABARD Tender

Civil And Construction
Road Construction
Eprocure
Opening Date14 Jan 2023
Closing Date25 Jan 2023
Tender Amount₹ 1,19,35,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GST 18% for above SubTotal Amount

1

1820428

1820428.86

... More
Picking the existing BT surface upto 50mm thick depth etc. complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per as per clause 111, 112, 202, 203, 303, 403 & 501 of MORT&H Specification (Fifth Revision).

62.5

1178

18.85

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

6152.7

111240

18.08

... More
Sub Total Amount for above all items (excluding GST)

1

-

10113493.68

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5.

185.2

2084268

11254.15

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.

1538.2

2876941

1870.33

... More
Providing and laying earth for making up berms using Carted earth with a lead of 5 Km including Labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers as per clause 111, 112, 202, 301, 302, 303, 305 & 900 of MORT&H Specification (Fifth Revision).

798.2

170367

213.44

... More
Clearing and grubbing by Cutting Light jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per clause 111, 112, 201 of MORT&H Specification (Fifth Revision).

1320

7326

5.55

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5.

6152.7

472773

76.84

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5.

309.4

2617301

8459.28

... More
Construction of Granular Sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification for grading-V Material. (Road Proper)

894.8

1381857

1544.32

... More
Earthwork Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including Cost of all labour, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructins, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 201 of MORTH Specification (V Revision) FOR BOXING.

1428.7

233592

163.5

... More
Providing and laying Tack Coat over Dry lean cement concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5.

19.8

410

20.72

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 -1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

1

906

906

... More
Total in Figures (SubTotal + GST)

-

11933922

-

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.