Municipal Administration And Water Supply Department Tender

... More
The MAWS has issued a formal invitation for competitive bids for the Municipal Administration And Water Supply Department project, for Repairing Work Pumping Station 20hp Unit-1 And Unit-2 Submersible Pump At Kk Nagar Zone-2 in Madurai, Tamil Nadu, with an estimated contract value of Rs. 2,51,528. The bid opening date for this tender is 27-05-2025 and the last date for bid submission is 09-06-2025. Interested bidders for Municipal Administration And Water Supply Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipal Administration And Water Supply Department - MAWS Tender

Works
Civil And Construction
Machinery and Tools
Water Storage And Supply
Eprocure
Opening Date27 May 2025
Closing Soon9 Jun 2025
Tender Amount₹ 2,51,528 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Motor Bottom Side Diapharm Siliicon oil seal 1 no

1

-

-

... More
Motor Top Side Rubber Sealed Ball Bearing 1 nos,and Bottum Double row Ball Bearing 1 no Over all 2 Nos Supply,High TempPetrolium Bearing Grease Supply

1

-

-

... More
Replacement Pump Side Oil Chamber 100/120 Grade oil 25 lts

1

-

-

... More
Replacement of Motor Teriminal Block

1

-

-

... More
Replacement of Motor and Pump Side “O” Rings

1

-

-

... More
Motor and Pump Profile Gasket

1

-

-

... More
Dynamic Balancing of Pump Shaft Impeller Should be Welding By S.S Material and Machining to the Lathe Works

1

-

-

... More
Replacement of panel OLR

1

-

-

... More
Recondition of Motor Cable Entry Glande and grimming Suitable lugs.

1

-

-

... More
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump ImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling, New Alanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing

1

-

-

... More
20 Hp KK nagar Pumping Unit-II Repair Anna nagar Drainage Pumping Station 20 Hp Unit-II Submersible Motor in Well . Lifting 20 Hp Submersible Using ChainBlock then Dismandling of Motor Pump and motor Rotor , Stator and oil Chamber,

1

-

-

... More
20 HP Motor Stator Coil Complete Burnout.Removing Complete Startor coil.then New Enamel Dual Coat Copper Wire Stator Rewinding , “F” ClassInsulation Core Slate using Nomax Paper , “F” Class Insulation Wire Slaves,, “F” Class Insulation Core Stike, “F” Class Insulation Fiber Tabe ,Insulation Varnish,,Water Proof Insulation Red Varnish .Motor Fibre Class Lead Wire, Replacement and 6 Nos Copper Lugs Supply and Gripping.

1

-

-

... More
Supply of Motor Top Side Carbon Segment Vs SS Mechanical oil Seal (Top)

1

-

-

... More
Supply of Motor Bottom Side Diapharm Siliicon oil seal 1 no

1

-

-

... More
Motor Top Side Rubber Sealed Ball Bearing 1 nos,and Bottum Double row Ball Bearing 1 no Over all 2 Nos Supply,High TempPetrolium Bearing Grease Supply

1

-

-

... More
Replacement Pump Side Oil Chamber 100/120 Grade oil 25 lts

1

-

-

... More
Replacement of Motor and Pump Side “O” Rings

1

-

-

... More
Dynamic Balancing of Pump Shaft Impeller Should be Welding By S.S Material and Machining to the Lathe Works

1

-

-

... More
Replacement of panel OLR

1

-

-

... More
Repalcement of Suitable Cable 20mtr

1

-

-

... More
Recondition of Motor Cable Entry Glande and grimming Suitable lugs.

1

-

-

... More
Supply And Fixing.Assembling Of Motor Stator Coil Core Fixing the Motor Body Cell,Pump ImpellerRotor ,Oil Chamber Body Fixing Pump Body Bottum Cell. And Top Cover CableBody Fixing Motor and Pump assembling, New Alanscrows and Spring Washer ,Painting and Erection in Well Loading &Unloading Charge Using Chainblock and Testing

1

-

-

... More
OLD MATERIAL LESS COST (-)

1

-

-

... More
Add GST 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.