Kamarajar Port Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Kamarajar Port Limited - KPL Tender

Works
Eprocure
Opening Date2 Jun 2021
Closing Date15 Jul 2021
Tender AmountRefer Documents 
Notes
Download

Summary

Construction Of Berth And Car Parking Yard

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Boring through all type of soil strata including cemented sand strata except rubble layer and hard rock.

7830

-

10

... More
Boring through Rubble layer

270

-

10

... More
Boring through Rock strata

270

-

10

... More
Reinforcement for Piles Supplying, fabricating and placing of CRS Fe 500 grade steel for piles reinforcement cage in piles including cutting, bending, welding, binding, with binding wire, positioning of pile reinforcements from founding level up to protection of reinforcement bars above pile cut off level in to deck beams with adequate lapping lengths all as per drawing, technical specifications and including all labour, materials, tools transport, cage lowering, equipment, fuel etc., complete. Note: Provision of authorised lapping, hooking arrangements etc., as per the approved bar bending schedule shall also be measured and paid under this item.

1900

-

10

... More
In Situ Concrete for Piles Construction of cast-in-situ Concrete Piles Supply, deliver, transport to site and place by tremie or approved methods including compacting, curing etc. of M40 grade concrete in cast in situ piles, for the whole length of the pile, from the founding level up to cut-off level, including casting the pile at least 600 mm above the specified cut-off level and cutting the M.S liner at specified level and clearing reinforcement of pile for lapping in deck slab as per drawing and specifications including the bentonite slurry including all sampling testing and records and all labour, materials, tools, equipment, fuel, etc., complete.

9500

-

10

... More
Dressing of Pile Muffs Dressing of Pile Head Chipping of pile heads up to cut-off level and /or as directed and stacking the debris at convenient place and transported to the low lying area any where inside the harbour with in a lead of 4Km or as directed by the Engineer’s representative and all associated cleaning of projecting reinforcements including all labour, materials, tools, equipment, fuel etc., complete.

270

-

10

... More
Pre cast concrete for Pile muffs Supply, deliver, transport to site and place of M40 grade concrete in precast pile muffs, including all sampling, necessary shuttering/formwork, mixing, transporting, handling, placing, vibrating, curing of concrete, testing and maintaining records including all labour, materials, tools, equipment, fuel etc., complete. Note: Supply and fabrication of steel reinforcement shall be measured and paid under relevant item.

650

-

10

... More
Insitu concrete for Pile muffs Supply, deliver, transport to site and place of M40 grade concrete for in-situ pile muffs including all sampling, necessary shuttering/formwork, mixing, transporting, placing, vibrating, curing of concrete, testing and maintaining records including all labour, materials, tools, equipment ,fuel etc., complete. Note: Supply, fabrication of steel reinforcement shall be measured and paid under relevant item.

125

-

10

... More
Reinforcement for Pile Muffs Supplying, fabricating and placing of CRS Fe 500 grade steel reinforcement of all diameter for pile muff including cutting, bending, welding, binding, with binding wire, positioning of reinforcement for pile muff all as per drawing, technical specifications and including all labour, materials, tools transport, cage lowering, equipment, fuel etc., complete.

160

-

10

... More
Pile Test Initial Vertical Pile load test Supply necessary Kent ledge and perform vertical initial load test on the marine pile of 1200mm diameter according to the specifications and as directed by the Engineer’s representative all as per relevant IS 2911 code, etc., complete. Note: 1. The tenderer shall furnish details of the load testing method he proposes to adopt. 2. The test load shall be furnished before conducting the test for 1200mm diameter pile. 3. Test shall be done initially at the ground level and soil upto 0.0 CD shall be removed. The test results shall be re-calibrated to the actual pile depth from -16m to penetration or as the case may be as per cross section.

1

-

10

... More
Routine Dynamic Pile Tests Supply necessary equipment and perform routine dynamic load test on the marine piles according to the specifications and as directed by the Engineer’s representative all as per relevant IS codes, etc., complete. Note: 1. The tenderer shall furnish details of the load testing method he proposes to adopt. 2. The pile shall be extended by at least 2m beyond the cut-off level prior to conducting the test and shall be chipped and removed after the test is completed. 3.Test shall be done initially at the ground level and soil upto 0.0 CD shall be removed. The test results shall be re-calibrated to the actual pile depth from -16m to penetration or as the case may be as per cross section.

8

-

10

... More
Diaphragm Wall

-

-

-

... More
Guide wall for Diaphragm Wall Providing and laying cement concrete of grade M30 for guide walls for the construction of diaphragm wall including excavation necessary shuttering/formwork, mixing, transporting, placing, vibrating, curing of concrete, all sampling, testing and maintaining records including all labour, materials, tools, equipment ,fuel etc., complete

300

-

10

... More
Construction of diaphragm wall Excavation of 1200 mm wide trench in all types soil strata of including cemented sand, boulder layers and hard rock if any up to the founding level as shown in approved construction drawings and stacking the bored soil at convenient place and transported to the low lying area anywhere inside the harbour area within a lead of 4 Km as directed by the Engineer’s representative for construction of diaphragm wall including chiselling of concrete at stop ends and injecting as per details in specification and drawings including bentonite slurry, circulation, all labour, equipment and machinery for excavation, dewatering, bentonite slurry flush pump and water pump, higher charge current consumption, charges for the reinforcement welding, placing and lowering of the reinforcement etc., as required all complete as specified / directed by the Engineer / Engineer's representative and as per IS 9559-1980. Note: 1. The payment will be made for one vertical face area only. 2. The rate includes all works associated with under water inspection, photography, video to identify the defects if any on the sea side of the diaphragm wall and submit the report to the Engineer. Further, the defects if any shall be rectified immediately including under water work as directed by the Engineer / Engineer's representative. 3. Contractor shall provide electronic equipment to monitor the deflection of the diaphragm wall for three months after the dredging is completed and provide weekly report.

10400

-

10

... More
Concreting for Diaphragm wall Providing and laying M40 grade cast-in situ reinforced cement concrete work in 1200 mm thick diaphragm wall at all depths from ground level to founding level as shown in approved construction drawings by tremie pipe using graded stone aggregate of 20 mm nominal size and 428 Kg/Cum minimum cement content and having slump compacting as per specification and direction of Engineer in-charge and including tremie up to cut off / trimmed level inclusive of all labour equipment materials except reinforcement complete in all respects as per IS 9559-1980 specification, drawing and direction of Engineer or Engineer's representative. Note : Concreting of diaphragm walls shall include additional height of 600 mm above the diaphragm wall cutoff level.

12500

-

10

... More
Reinforcement for Diaphragm wall Supplying, fabricating and placing of CRS Fe 500 grade steel for diaphragm wall, guide wall etc., including cutting, bending, welding, binding wire all as per technical specification, drawing, including all labour, materials tools, equipment, fuel and all sampling, testing and records etc., complete

1865

-

10

... More
Concrete Integrity Tests Supply necessary equipment and perform concrete integrity test on the diaphragm walls according to the specifications and as directed by the Engineer’s representative all as per relevant IS codes, etc., complete. Note: 1. The tenderer shall furnish details of the testing method he proposes to adopt.

8

-

10

... More
Dressing of Diaphragm wall Chipping of diaphragm wall heads up to cut-off level and /or as directed and stacking the debris at convenient place and transported to the low lying area anywhere inside the harbour with in a lead of 4Km or as directed by the Engineer’s representative and all associated cleaning of projecting reinforcements including all labour, materials, tools, equipment, fuel etc., complete.

330

-

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.