Indira Gandhi Centre For Atomic Research Tender

... More
The IGCAR has issued a formal invitation for competitive bids for the Indira Gandhi Centre For Atomic Research project, for Construction Of Rcc Trench For Rerouting Of Electrical And Communication Cables At Igcar, Kalpakkam. in Chengalpattu, Tamil Nadu, with an estimated contract value of Rs. 3,55,97,000. The bid opening date for this tender is 24-10-2024 and the last date for bid submission is 06-11-2024. Interested bidders for Indira Gandhi Centre For Atomic Research tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Indira Gandhi Centre For Atomic Research - IGCAR Tender

Opening Date24 Oct 2024
Closing DateCancelled
Tender Amount₹ 3,55,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members, MS structural embedment’s/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, square, sections etc. including chamfering and rounding off the edges, applying paint as described below of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per technical specifications, drawings and as directed by the Engineer-in-charge. (This item includes all structural works for steel structure, steel frame work, Ep's etc.,) Note: (i) Lifting device arrangements if any required also to be arranged by the contractor at his own cost. (ii) Painting: a) Epoxy primer - 2 coats (Before and after erection b) Micaceous iron oxide - 1 coat. c) Chlorinated rubber based paint - 2 coats (Finish paint)

12.25

-

-

... More
All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres.

3500

-

-

... More
Providing and laying cement concrete of M15 Grade (with 300 kg. of cement per cu.m. of concrete ) using 20mm nominal size graded hard stone aggregate obtained from approved quarry including compaction, finishing top surface to level, curing, including cost of centering and shuttering, etc. complete as directed by the Engineer at levels for providing chute drains, slope protection area/ revetment concrete in road embankment (welded mesh fabric concrete works) finishing with chequered pattern at top surface and laying in panels as instructed , PCC foundation, PCC for toe wall and wherever required by EIC. Note: 1)The rate shall be quoted for this item on the basis of using 300 kg/cu.m of concrete. Any upward/downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F. The design mix shall be got approved by department. 2) This item includes the concrete supplied by RMC and as directed by EIC.

200

-

-

... More
M30 grade with total minimum cementitious content (cement + fly ash content not exceed 20 % by weight of total cementitious content) 380kg/cum of concrete and minimum cement content of 304Kg/cum of concrete as mentioned (in the item of above) for the levels from bottom of foundation level to FFL

960

-

-

... More
for Basement and Ground Floor

3

-

-

... More
Providing plastering to the external surfaces of brickwork/concrete at all elevations in cement mortar 1:5 using crushed stone sand, 15mm thick including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, forming grooves wherever necessary, all as per specifications.

7

-

-

... More
Girth beyond 30cm, upto and including 60cm, measured at 0.5m above ground level

10

-

-

... More
Conveying the surplus excavated earth, broken materials, debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil, @ 30% in respect of debris and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road.

-

-

-

... More
Centering and shuttering as mentioned above Item for the Levels From bottom of foundation level to FFL.

7100

-

-

... More
Providing and constructing with approved well cured flyash brick work in cement mortar 1:5, flyash bricks are made as per IS 12894 of latest edition (flyash + crushed sand stone + Lime + additive/cement with water proofing chemicals and Accelerators) (non modular) of class designation 5.0 in superstructure at all levels and lifts including scaffolding, raking out joints, continuous water curing for a minimum period of 14 days from the date of construction, complete as per specifications, drawings and as directed by the Engineer-in-Charge at all levels and lifts & all floors.

-

-

-

... More
INR Zero Only

-

-

-

... More
Cutting and Felling all types of trees including cutting of trunks, branches and removing the roots and stacking of serviceable wood materials at places specified with a lead of 200m, disposal of unserviceable materials including filling the pits and depressions with excavated earth complete for trees of girth mentioned below complete all as directed by the Engineer-in-Charge.

-

-

-

... More
Supplying and placing in situ Normal Reinforced cement concrete of grade & total minimum cementitious content as specified (cement + fly ash) for kg/Cu. M, using OPC conforming to IS 269-2015 or latest edition and with required fly ash conforming to IS 3812 Part -I / ASTM C-618 Class F. Fly ash should be blended at site such that fly ash content should not exceed 20 % by weight of total cementitious content. Coarse aggregate used should be hard granite machine crushed (with VSI technology only) graded stone aggregates withmaximum size of aggregate not exceeding 20 mm size. Fine aggregate used shall be either natural river sand or crushed stone sand (with VSI technology only and should be washed in water to remove finer particles, the micro fines particles of size less than 75 micron should be less than 7%) (Zone I /II) conforming to IS 383 – 2016. The cost includes weigh batching, required chemical admixtures, mechanical mixing/Ready mix supply plant mixing, transporting/transporting by Transit Mixers, pumping using Concrete pumps/ placing with crane buckets etc., at all levels, lifts & all structural elements including dewatering wherever necessary, including compacting, finishing, curing (For a period of at least 10 days), providing construction / contraction / expansion joints, pour strips etc. but excluding centering, shuttering and reinforcement at all levels / elevations as given in drawings, specifications as directed by EIC. Rate to include all materials, labour, tools /tackles, plant and equipment, supervision, etc. complete. Note:- 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F.

-

-

-

... More
Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge.

-

-

-

... More
Supplying, fabricating, erecting and fixing in position at levels for the items mentioned below, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. (The measurement for the formwork will be the actual area of forms in contact with concrete surfaces.)

-

-

-

... More
Dismantling brick work in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead all as per specifications and directed by the Engineer-in-charge.

5

-

-

... More
TMT bars of Fe500D grade as mentioned (in the above item above) for the levels from bottom of foundation level to FFL.

110

-

-

... More
Manufacturing, supplying, hoisting and fixing in position at all lifts, precast units of various patterns and sizes for precast plain solid units, slabs, exhaust fan moulds etc., in reinforced cement concrete of 1:2:4, using 20mm and below machine crushed graded stone aggregate and crushed stone sand including weigh batching, mechanical mixing, casting, vibrating, finishing of exposed faces, curing, necessary formwork & moulds, transporting and placing at all lifts, preparation of connections, grouting with cement mortar/cement grout wherever needed excluding steel reinforcement complete all as per drawing, specification and as directed by the Engineer-in-Charge.

200

-

-

... More
Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 'SAIL or VIZAG or approved equivalent make' and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks in cement mortar 1:2 and binding wire complete all as per specification and as directed by Engineer-in-Charge at levels for the items mentioned below. Note: The rate shall be including the cost of reinforcement steel. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see point 7 of Section VIII, General Information for Guidance of Tenderers.

-

-

-

... More
Providing and laying non pressure NP2 class RCC Hume pipes conforming to IS:458, with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 using crushed stone sand, laying to the levels, slopes including testing of joints etc. complete all as per the drawings and specifications and as directed by the Engineer-in-charge.

-

-

-

... More
Dismantling of RCC works at all levels by manually / by mechanical means, including Cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 50m lead as per specifications and directed by the Engineer-in-charge.

5

-

-

... More
for Grading-II material

18

-

-

... More
Girth beyond 120cm, upto and including 240cm, measured at 0.5m above ground level

5

-

-

... More
Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre

1650

-

-

... More
All kinds of soil with depth exceeding 1.5m but not exceeding 3m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres.

120

-

-

... More
Providing F3 finish over concrete surfaces in cement mortar 1:1.5 using crushed stone sand (1 part cement : 1.5 part fine sand) including wetting the surface, labours, curing, all materials, scaffolding, at all elevations complete all as per specification and as directed by the Engineer-in-Charge.

3900

-

-

... More
Demolishing Stone rubble masonry in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead as per direction of Engineer-in-charge.

5

-

-

... More
Girth beyond 60cm, upto and including 120cm, measured at 0.5m above ground level

5

-

-

... More
300mm dia NP2 class RCC Hume pipe

115

-

-

... More
Overall rebate (Optional)

-

-

-

... More
Levelling, bull-dozing the heeped/dumped loosened earth/debris etc. to form a berm of road along the side of road, alignment by hiring JCB/Bull dozer etc., including labour charges (if any) to the required width as directed by the Engineer-in- Charge.

20

-

-

... More
Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-Charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth.

2100

-

-

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MoRT&H specifications for road and bridge works (4th revision or latest) and as directed by the Engineer-in-Charge for following

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.