Hindu Religious And Charitable Endowments Tender
... More
The HRICE has issued a formal invitation for competitive bids for the Hindu Religious And Charitable Endowments project, for Repair And Restoration Arulmigu Abathsagayeswarar in Thanjavur, Tamil Nadu, with an estimated contract value of Rs. 59,51,787. The bid opening date for this tender is 18-12-2024 and the last date for bid submission is 24-01-2025. Interested bidders for Hindu Religious And Charitable Endowments tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Hindu Religious And Charitable Endowments - HRICE Tender
Civil And Construction
Eprocure
Opening Date18 Dec 2024
Closing Date24 Jan 2025
Tender Amount₹ 59,51,787
Costs
EMD
₹ 40,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repair And Restoration Arulmigu Abathsagayeswarar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRCE_511867_1Bid Award Id
ViewTender No
1/Abathsagayeswarar Repair and Restoration/2024Tender Authority
Hindu Religious And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and filling with Sand and Gravel mix in 1: 3 ratio, filled up in 150mm layers with moisture percentage of 18% including cost and conveyance of Quarry Dust, gravel and all labour charges for filling ramming etc. complete with standard specifications as directed by the Dept,Officers.
2
-
-
... More
Removing the cut stone Kabothagam Ubabeedam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
Refixing the old stone Chtravanam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
27
-
-
... More
0 to 60 M
60
-
-
... More
60 to 90 M
30
-
-
... More
Pointing the cut stone Masonary work with Lime Mortor 1:1.5 (one part of lime and one and half part of sand) excluding cost and conveyance of cut stone but including cost of special tools such as brush and watering, curing etc complete, as per standard specification.
2706
-
-
... More
50mm class PVC 10 KSC
115
-
-
... More
Random Rubble masonry work in LM 1:2 ( One of Lime and two of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications.
7
-
-
... More
Removing the cut stone Kalvari and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
226
-
-
... More
3 Phase panel board - D.O.L with two level guard and auto start ( 13390+1951 ) Rate + 4% vat
1
-
-
... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
400
-
-
... More
150mm CS Casing Medium depth PVC pipe.
115
-
-
... More
500ML Solvent cement
2
-
-
... More
Removing the cut stone padma jegathi athisdanam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
3 PAHSE 2 HP ISI make 4 stage submersible pumpset 100x40 with Excise duty and taxes etc.
1
-
-
... More
Vimanam /Gopuram upto 25'0" Height
448
-
-
... More
160mm PVC end cup
1
-
-
... More
Labour charge for old stone Removing & Fixing Charges including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 (one part of lime and one and half part of sand)etc complete.as per instruction of departmental officers etc.,complete.
600
-
-
... More
90 to 120 M
30
-
-
... More
Supply and delivery of vertical wet type submersible pumpset 2 HP capable of discharging with control panel with necessary pipes and fitting and labour charges etc.complete.
-
-
-
... More
Cement concrete 1:5:10 (One cement, five crushed stone sand and ten aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed, watered etc., complete complying with standard specification
1
-
-
... More
Removing the cut stone Vyalavari and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
Refixing the cut stone Kandam Ubabeedam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
Refixing the cut stone padma jegathi athisdanam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
Removing the cut stone Kandam Ubabeedam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
6 Sqmm 3 core flat Cable
120
-
-
... More
60 to 90 M
30
-
-
... More
Providing Water wash with appropriate methodology to restore the originalities of the existing Granite structures inclusive of necessary scaffolding charges, conveyance and all hire charegs for all tools and plants and clearing the site after completeion of work etc.,complete.
35750
-
-
... More
Clean removal of lime plaster and Replastering with Lime Mortor1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
180
-
-
... More
Slotter charge
60
-
-
... More
Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
-
-
-
... More
Removing the cut stone Pavukkal and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
390
-
-
... More
Brick work in lime Mortor 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
31
-
-
... More
GM white
1
-
-
... More
Gusket shellac
7
-
-
... More
sub total
-
-
-
... More
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of wall dismantling the lime concrete as per instruction of departmental officers etc.,complete
128
-
-
... More
50mm PVC Elbow
7
-
-
... More
Bolt and Nut
10
-
-
... More
Painting with multicolour (Panchavarnam) good Emulsion paints complete for the Vimanams/Gopurams, inculding cost and conveyence of all materials, labour charges including Artist painter, working in heights,lifting of material, cost of brushes etc, complete.which including all extra for foldings-100 sft, superficial area.
2630
-
-
... More
Refixing the cut stone Kalvari including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
226
-
-
... More
PVC Tap Roll (Empier Tape)
10
-
-
... More
Labour charges for inserting 150mm dia M.S Casing pipes assembly (With Slots or without slots)in the drilled hole including welding the joints an packing annular space with Pebbles of size and quality as approved by the Executive Engineer / TWAD Board.
115
-
-
... More
Charges for developing the borewells with air compressor of 300 cfm capacity (minimum 8 hours) including transporation, labour and fuel charges for compressor as directed by TWAD Board Officers and conducting Yield test by "V" Notch method.
8
-
-
... More
90 to 120 M
30
-
-
... More
Scraping the old paint and Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
1297
-
-
... More
Plastering with Lime mortar1:1.5,(one part of lime and one and half part of sand) 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications and as directed by the Dept,Officers.
502
-
-
... More
Drilling 150mm pilot bore
-
-
-
... More
Nool Kandy
7
-
-
... More
Supplying laying and jointing HDPE pipe of approved quality and best variety conforming to ISS and with ISI mark of 50mm including cutting threading and fixing PVC specials and including earth work exvcavation for 1M depth below ground level etc complete as per standard specifications.(For sub-marsible pump in borwell class-5 ,1mpa)
145
-
-
... More
GST 18%
-
-
-
... More
Reaming from 150mm dia to 300mm dia bore as directed by dept. officers.
-
-
-
... More
Refixing the cut stone Kabothagam Ubabeedam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
20
-
-
... More
Varnishing new and old wood work two cots of approved quality in all floors the rate includes cost of all materials, brushes, scaffolding charges etc, complete.
42
-
-
... More
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects..
16
-
-
... More
Removing the old stone Chtravanam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
27
-
-
... More
0 to 60 M
60
-
-
... More
Refixing the cut stone Pavukkal including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
390
-
-
... More
Drilling of Bore walls anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in Alluvial Soil Sedimentary strata of day and stone shale pebbles boulders etc.By first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs,fuel,labour and drilling at site (Site will shown by the TWAD Board Officers) including construction of mud pit.
-
-
-
... More
50mm PVC Bend
7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements