Hindu Religious And Charitable Endowments Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRICE Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date4 Dec 2024
Closing Soon19 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Repair And Restoration Works To The Existing Temple, Construction Of Mun Mandapam And Providing Pathway Around The Temple

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scrapping/removing/cleaning old paint/oil stain etc., from stone wall/Pavukkal including all labour charges, necessary requisite materials used for Paint removal etc., complete

120

-

-

... More
Pointing in Lime mortar 1:1.5 to a depth of stones including cost and conveyance of all materials and all labour charges etc.complete and as directed by the departmental officer

120

-

-

... More
Providing Weathering Course Concrete 8 cm thick with20mm size Broken brick jelly in lime mortar over roof slab including laying, consolidating,finishing etc.,complete.

7.2

-

-

... More
Plastering with lime mortar,three coats 25mm thick over the weathering course concrete etc complete (sch item no.301)

64.5

-

-

... More
Dismantling Plain Cement Concrete including lifting and clearing away and carefully stacking the materials useful for re-use if considered fit including conveyance etc., complete and as directed by the Departmental Officer.

0.8

-

-

... More
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

10.6

-

-

... More
Supplying & Paving the floor/steps with cut stone of 10cm thick and pointing in CM 1:5 including cost and conveyance of all materials, labour charges for dressing and paving and pointing etc., complete.

3.5

-

-

... More
Painting wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification.

5

-

-

... More
Dismantling Brick/stone masonry in cement mortar including lifting and clearing away and carefully stacking the materials useful for re-use if considered fit including conveyance etc., complete and as directed by the Departmental Officer.

8.5

-

-

... More
Dismantling plain Cement concrete including lifting and clearing away and carefully stacking the materials useful for re-use if considered fit including conveyance etc., complete and as directed by the Departmental Officer.

3

-

-

... More
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.

7.6

-

-

... More
Earthwork cutting in Medium Rock and Dense Medium Rock except hard rock requiring blasting measured in soild removing the same from the surface, including all labour for removing them. Equipmets and all incidental charges with an initial lead of 10m and a lift of 2m including all labour charges & all other incidental charges etc., complete

5

-

-

... More
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification

2.6

-

-

... More
Brick work in cement Mortor 1:6 using Country Bricks of size 8"3/4 x 41/4" X23/4" including cost and conveyance of all materials and labour charges and all the other incidental charges etc. complete complying with standard specification

5.1

-

-

... More
Plastering with CM 1:5, 12 mm thick including cost and conveyance of materials, labour charge curing etc.

47.2

-

-

... More
Random Rubble Masonry in CM 1:5 ( one cement and five sand ) using hard broken rough stones and bond stones in each layers with simultaneous pointing including cost and conveyance of all materials and labour charges etc., complete

13.5

-

-

... More
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).

5

-

-

... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)

14.5

-

-

... More
Supplying, fabricating and placing in position of M.S or RTS grill for reinforcement of all R.C.C. works including cost of steel and binding wire etc., complete complying with standard specification.

4

-

-

... More
Supplying & Paving the floor with cut stone of 10cm thick including cost and conveyance of all materials, labour charges for dressing and paving, excluding pointing etc., complete and as directed by the departmental officers.

107

-

-

... More
Plain Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification

3

-

-

... More
Supplying of cut stone for Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification

61.5

-

-

... More
Labour charges for fixing cut stone Chitravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

18

-

-

... More
Labour charges for fixing cut stone Upapeedam kandam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

8.6

-

-

... More
Labour charges for fixing cut stone Pillar excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

70

-

-

... More
Labour charges for fixing cut stone Thani bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

20

-

-

... More
Labour charges for cut stone Thani Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

57

-

-

... More
Labour charges for fixing cut stone Pavukkal,Ull vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

42.5

-

-

... More
Labour charges for fixing cut stone Viyala vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

18.2

-

-

... More
Labour charges for fixing cut stone Kodungai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,

76.8

-

-

... More
Plastering with lime mortar,three coats 25mm thick over the weathering course concrete etc complete (sch item no.301)

39.5

-

-

... More
Brick masonry lime Mortor1:1.5 using Chamber Burnt Bricks II Class(Ground Moulded) 9" x 4 3/8" x 2 3/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.

6

-

-

... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Combination Mortor1:1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Combination Mortor1:1:4 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.

14

-

-

... More
Painting with Water based exterior emulsion paint complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.

14

-

-

... More
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.

24

-

-

... More
Painting two coats of newly plastered wall surface with Water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

24

-

-

... More
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work.1 sq,ft.

137

-

-

... More
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime Mortor1:1.5 finishing the same with lime Mortor1:1.5 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including Panchavarnam 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.

8

-

-

... More
GST Amount for providing Service to Government Contract Works for the above works at 18%(9%+9%). {GST Amount is the Total GST Amount for overall quoted amount}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.