Hindu Religious And Charitable Endowments Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRCE Tender

Works
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date28 Apr 2025
Closing Date28 May 2025
Tender Amount₹ 6,11,22,000 
Notes
Download

AI Insights

Technical Capacity
... View More
The required prior work experience for the bidder includes: - Project Manager with at least ten years' experience in executing similar works. - Site Engineers with at least three years' experience. - Diploma holders in civil engineering with at least three years' experience. - Sthapathy with at least three years' experience. The bidder should have at least 5 years of experience in the civil engineering construction field. They should have completed major building works and other civil works with a value of at least 150% of the tendered value, which is Rs. 917 lakhs, in any one of the preceding years. The bidder should have satisfactorily completed at least one "Building" work of a similar nature with a value of at least 50% of the proposed contract value, which is Rs. 305.61 lakhs, in a single agreement for the preceding 5 years. Additionally, the bidder should have completed similar building works costing more than Rs. 6822.55 lakhs under a single agreement in any one year of the preceding three years. The value and percentage of similar works completed are mentioned as follows: - At least 150% of the tendered value (Rs. 917 lakhs) - At least 50% of the proposed contract value (Rs. 305.61 lakhs) - More than Rs. 6822.55 lakhs under a single agreement in any one year of the preceding three years. If the overall quoted amount of the tender is less than 5 to 15% of the value put to tender, the contractor shall pay an additional security at 2% of the estimated value. If the tender discount exceeds 15% to 20%, the contractor shall pay an additional security deposit of 50% of the difference between the quoted amount and estimate amount.

Costs

Summary

Construction Of Thirumaligaipathi At Cutstone Members

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.

315

-

-

... More
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).

161

-

-

... More
Supplying, fabricating and placing in position M.S grill for reinforcement for all RCC works, including cost of rods, straightening, bending, cracking tying grills, with 18 gauge galvanished bending wire and placing the grills in position etc., complete and as directed.

243

-

-

... More
Random rubble masonry in Lime mortar 1:2 (One lime, and Two sand) for foundation and basement including simultaneously pointing above ground level with the same mortar etc., complete complying

437

-

-

... More
Supply of Cut stone for construction of upapeedam works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Upapeedam

65

-

-

... More
Dressing at Upapeedam

1050

-

-

... More
Fixing charges at upapeedam

100

-

-

... More
Paving flooring with new cut stone of size 0.60 x 0.60m and 0.10m thick and top surface dressed, pointing with Lime Mortor 1:3 using Local Lime including cost and conveyance of all materials etc., complete as per standard specification.and masonary works etc., to be used

990

-

-

... More
Supply of Cut stone for construction of Pillars works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Pillars

30

-

-

... More
Dressing at Pillars

2865

-

-

... More
Fixing charges at Pillars

215

-

-

... More
Supply of Cut stone for construction of Bothigai works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Bothigai

8

-

-

... More
Dressing at Bothigai

677

-

-

... More
Fixing charges at Bothigai

22

-

-

... More
Supply of Cut stone for construction of Uthiram works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Uthiram

47

-

-

... More
Dressing at Uthiram

1588

-

-

... More
Fixing charges at Uthiram

76

-

-

... More
Supply of Cut stone for construction of Kapothagam works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Kapothagam

15

-

-

... More
Dressing at Kapothagam

405

-

-

... More
Fixing charges at Kapothagam

40

-

-

... More
Supply of Cut stone for construction of Viyalavari works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Viyalavari

9

-

-

... More
Dressing at Viyalavari

315

-

-

... More
Fixing charges at Viyalavari

33

-

-

... More
Supply of Cut stone for construction of Pavukkal works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc., complete at site.

-

-

-

... More
Supply of Cut stone at Pavukkal

495

-

-

... More
Dressing at Pavukkal

11575

-

-

... More
Fixing charges at Pavukkal

1077

-

-

... More
Weathering course concrete using best equlity broken brick jelly of size 20mm uniform gauge in using Local Lime, the the proportion of brick jelly to lime being 32:12.5 by (No sand is to be added) by volume and laid over the RCC roof slab in a single layer and consoidated to the finished thickness by beating the concrete with wooden beaters of approved pattern keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete complying with standard specification( The lime used should be sourced from using Local Lime which is highly iron fortified and suitable for structual and masonay works etc.,)

115

-

-

... More
Finishing the top of roof with one course of machine pressed tiles of size 200mm x 200mm x 20mm of approved quality laid in Lime Mortar 1:1.5 12mm thick mixed with water proofing compound, Red oxide and pointing with same mortar mixed with water proof compouns and red oxide etc, including cost and conveyance of all materials and labour charges etc., complete as directed by the departmental officers complying with standard specification. ( The lime used should be sourced from using Pollachi which is highly iron fortified and suitable for structual and masonay works etc.,)

900

-

-

... More
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.

448

-

-

... More
Sub Total

-

-

-

... More
GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.