Hindu Religious And Charitable Endowments Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRCE Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date9 May 2025
Closing Date26 May 2025
Tender Amount₹ 58,37,925 
Notes
Download

Costs

Summary

Repair And Restoration Work Of Swamy Sannathi, Arthamandabham , Mahamandabam,garudazhwar Sannathi , Praharam Flooring And Construction Of New Compound Wall

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing water jet washing in the granite portion by using appropriate equipements with all its accessories etc.from the granite surface and making it into original surface including cost and conveyance of hire charges for all tools and plants and final clearing etc complete

4530

4

18120

... More
Pointing the joints with Lime mortar 1:1.5 20mm deep using red and yellow oxide and including cost of special tiles such brush and watering,curing etc complete as per standard specification

397

267

106137.95000000001

... More
Clean removal of lime plaster from walls and clearing away as per standard specification

24

7

191.52

... More
Plastering with Lime Mortor1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.

31

263

8155.17

... More
Thorough scrapping of old plastered surface for White Washing, Colour Washing & Distempering etc Complete as per Departmental Standard.

90

4

415.8

... More
Clean removal of old paint from the surface of wooden door and Painting old wood work with two coats of enamel paint of approved quality and color over one coat of white primer in all floors the rates is to include cost of all materials, brushes scaffolding charges etc, complete complying with standard specifications.

25

174

4352.5

... More
Dismantling, clearing away and carefully stackingmaterials useful for re-use for Chipping of concrete and roughening the surface including all incidental charges etc.

325

40

13120.25

... More
Dismantling, clearing away and carefully stackingmaterials useful for re-use for One Course of Pressed Tile Roof finish in cement mortar including all incidental charges etc. complete

6.5

25

165.88

... More
Dismantling, clearing away and carefully stackingmaterials useful for re-use for Lime Concrete

1

353

353.87

... More
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.

1.3

4232

5502.354

... More
Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in cm 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.

7.5

1269

9522.375

... More
Providing mangalore tiled roof with Teak wood reepers of size 50mmx25mm, Palmyrah Rafter (50-60mm wide & 125mm depth) including cost of all materials and labour charges etc., complete

28

785

22006.600000000002

... More
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.

272.5

220

59950

... More
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

79

1639

129539.46

... More
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant St

19

5668

107707.2

... More
Brick work using using Country Bricks of size 83/4" x 4-1/4" X2-3/4" in Cement Mortar 1:5 (One cement and Five sand) including curing neat finishing, etc., complete complying with standard specifiction

18.5

6122

113273.65

... More
Brick work using using Country Bricks of size 83/4" x 4-1/4" X2-3/4" in Cement Mortar 1:6 (One cement and Six crushed stone sand) including curing neat finishing, etc., complete complying with standard specifiction

106

6184

655577.14

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
For Foundation & Basement

232

931

216015.2

... More
For Column

122

1242

151585

... More
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of Sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors, finishing,curing, etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the excess usage of materials.)

-

-

-

... More
For Foundation & Basement

44

8854

389590.96

... More
For Superstruture

8

8986

71889.44

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

4.4

89883

395487.4

... More
Plastering with Cement Mortar 1:5 (One cement and five sand),12mm thick including cost and conveyance of all materials and all labour charges,curing etc., complete complying with standard specifications.

1051

269

283181.44

... More
White washing two coats with best shall lime including cost and conveyance of all materials and all labour charges etc. complete complying with standard specifications.

1010

36

37238.7

... More
Painting two coat with approved water based Exterior Water based Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2

1172

250

293175.8

... More
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:2 etc complete.

-

-

-

72

7389

532018.7999999999

253

4709

1191607.23

... More
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.

270

105

28444.5

... More
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications.

18

234

4229.099999999999

... More
Add GST 18%

1

1

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.