Hindu Religious And Charitable Endowments Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRCE Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date22 May 2025
Closing Date6 Jun 2025
Tender Amount₹ 58,48,240 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints.

905

43

-

... More
Pointing the stone joints with lime mortar 1:1.5 (one of lime, one and five of sand) after rackingout the stone joints including erection of scaffolding charges etc complete.

905

267

-

... More
Removal of Damaged Plaster Surface In lime morter Including all Materialand labour Charges etc.,

232

40

-

... More
Plastering with lime mortar 1:1.5 (one of lime, one and half of sand ), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. (The lime should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry.)

235

259

-

... More
Painting two coats of newly plastered wall surface with ready mixed water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

2421

250

-

... More
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft

-

-

-

... More
Vimanam height up to 25'

307

1405

-

... More
Vimanam height up to 15'

278

1249

-

... More
Dismantling of Reinforced Cement Concrete, Including all meterials and labour charges etc.,

0.86

4308

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

6

1553

-

... More
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).

1

8642

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

0.08

89883

-

... More
Removal of plain cement concrete and Including all Materils and Labour Charges ect.,

68

486

-

... More
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.

19

1177

-

... More
Paving with cut stone flooring using cut stone of size 600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges.

-

-

-

430

4686

-

59

7365

-

... More
Removal of Doors and Windows including removal of frames, hinges and fastenings Including all Materils and Labour Charges ect.,

3

153

-

... More
Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specification

-

-

-

... More
(Size of door 4'0"X6'0'')

24

2150

-

... More
(Size of door 3'0''X5'6'')

33

2242

-

... More
Painting new wood work with two finishing coats of Varnish of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

95

215

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

62

234

-

... More
Clean removal of damaged lime concrete including all labour charges etc complte.

11

353

-

... More
Finishing the roof top roof with lime mortar, 25mm thick including all labour charges etc comple with standard specification

108

816

-

... More
Dismantling of Brick / Stone Masonry in lime mortar walls under 3m high , Including all meterials and labour charges etc.,

3

231

-

... More
Sub total

-

-

-

... More
GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.