Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Widening, Improvements, Junction Improvements, Geomentrical Improvements, Improvements To Riding Quality To Government Roads Including , Reconstruction Of Box Culvert, Widening Of Slab Culvert, Pipe Culvert Harur Package 61 in Dharmapuri, Tamil Nadu, with an estimated contract value of Rs. 6,02,28,814. The bid opening date for this tender is 14-09-2019 and the last date for bid submission is 14-10-2019. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender

Opening Date14 Sep 2019
Closing Date14 Oct 2019
Tender Amount₹ 6,02,28,814 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Vth Year

12

-

700

... More
IInd Year

1770

-

73.1

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

7.5

-

74.55

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months Ist Year

46.9

-

15.65

... More
Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

162.61

-

235.5

... More
Vth Year

14

-

700

... More
IInd Year

1080

-

73.1

... More
UPKEEPING COMPONENT Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete. [Once in a year]

-

-

-

... More
IVth Year

46.9

-

15.65

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months IV Year

297

-

16.64

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

349.59

-

8043.38

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

199.69

-

1678.1

... More
IIIrd Year

9

-

246.5

... More
Vth Year

140

-

16.64

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

33.86

-

4671.31

... More
Providing Tree banding, EB pole white and black band of approved first quality pait inculding cost of paint labour charges, inculding numbering and all other incidental charges etc., complete as directrd by the departmental officers [Once in a year]

-

-

-

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months IV Year

225

-

16.64

... More
Vth Year

4.5

-

74.55

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months IV Year

9.96

-

7934.9

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

3.36

-

100

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

7465.04

-

20.4

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

7.5

-

246.5

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

4.5

-

74.55

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

51.9

-

235.5

... More
Vth Year

5.63

-

74.55

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
IIIrd Year

46.95

-

15.65

... More
IIIrd Year

15

-

74.55

... More
IVth Year

6.75

-

246.5

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

193.75

-

12.99

... More
IInd Year

2

-

700

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

3734.87

-

16.64

... More
Vth Year

495

-

16.64

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months IV Year

7.43

-

7934.9

... More
IVth Year

2640

-

3.9

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

200

-

73.1

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months IV Year

8.78

-

7934.9

... More
Advance patch work 25mm thick using 13.20 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

85.86

-

73.1

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

3.31

-

168

... More
IInd Year

67

-

15.65

... More
Wet Mix Macadam (Table 400-13) :Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

295.96

-

6319.16

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months IV Year

6.75

-

7934.9

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

0.35

-

69849.37

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

103.14

-

8043.38

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaing of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Above sill level, Well Protective wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision for Box culvert, Slab culvert, Well Protective wall

-

-

-

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

16.32

-

489.17

... More
Total Value put to Tender

1

-

60228814

... More
IIIrd Year

3600

-

3.9

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

46.9

-

15.65

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

795.5

-

73.1

... More
IVth Year

1.5

-

246.5

... More
IVth Year

1560

-

73.1

... More
IIIrd Year

1080

-

73.1

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

185.83

-

12.99

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

297.58

-

1664.9

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

131.1

-

5236.81

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

40.2

-

15.65

... More
IInd Year

9

-

246.5

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

8094.37

-

16.65

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

23.98

-

2964.81

... More
Construction of Well protecting wall at km 29/4 of Harur - Kottapatty road

48.56

-

6718.01

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

5

-

700

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

304.51

-

7931.35

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

6

-

74.55

... More
IIIrd Year

1080

-

73.1

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

13.5

-

246.5

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

38.22

-

503.97

... More
Vth Year

16.59

-

7934.9

... More
IIIrd Year

46.9

-

15.65

... More
Vth Year

68.75

-

16.64

... More
IInd Year

7

-

700

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

4.45

-

3156.41

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

727.73

-

6319.16

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

40

-

942

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

14.63

-

7934.9

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

581.25

-

11.74

... More
IIIrd Year

2

-

700

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

338.17

-

1745

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months IV Year

8.91

-

7934.9

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

29.05

-

4740.16

... More
Prime coat :Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision - over WMM/ WBM

-

-

-

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months Ist Year

60

-

3.9

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
IVth Year

12.75

-

246.5

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

98.33

-

73.1

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

83.64

-

1745

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

600

-

12.99

... More
Vth Year

12.75

-

246.5

... More
5. Junction improvement at km 2/4, 3/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months IV Year

2.52

-

7934.9

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

22.8

-

235.5

... More
Vth Year

46.9

-

15.65

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

25.52

-

7013.86

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

80

-

942

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

51.9

-

235.5

... More
IInd Year

3600

-

3.9

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Dismantling Stone masonary

-

-

-

... More
IVth Year

4.5

-

74.55

... More
IIIrd Year

1770

-

73.1

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

25.81

-

4875.64

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

405

-

60.52

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

2.4

-

4625.71

... More
IInd Year

1080

-

73.1

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

5918.97

-

11.74

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months Ist Year

75

-

73.1

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months Ist Year

13.4

-

15.65

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

1479.75

-

1745

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

1.56

-

3136.35

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

166.6

-

6102.11

... More
IIIrd Year

13.4

-

15.65

... More
Vth Year

14.85

-

7934.9

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

12.75

-

246.5

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for making up berms using carted earth with average lead of 5 Km

-

-

-

... More
IInd Year

46.9

-

15.65

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

9592.5

-

16.65

... More
Vth Year

2600

-

3.9

... More
IVth Year

3

-

700

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

2.59

-

9985.85

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

58.32

-

9481.19

... More
Gravel Filling behind Abutment and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers , watering , tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete-For Culvert and Retaining Wall Portion as per clause 304 & 2907 of MORTH Vth Revision

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

87.2

-

1745

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months IV Year

41.25

-

16.64

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

5

-

197

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

46.9

-

15.65

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for making up berms using cut earth (Labour Charges Only)

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

400

-

73.1

... More
IInd Year

5

-

700

... More
Final Negotiated Value

1

-

-

... More
IInd Year

9

-

246.5

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

950.75

-

11.76

... More
Vth Year

13.5

-

246.5

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

14

-

700

... More
IIIrd Year

1320

-

73.1

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

29.07

-

6319.16

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

33.74

-

6562.87

... More
Supply and fabrication of Steel Grade Fe 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 900,1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

58.32

-

9241.94

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

4

-

120

... More
IVth Year

7

-

700

... More
IIIrd Year

4.5

-

74.55

... More
Vth Year

15

-

74.55

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

1352.5

-

60.56

... More
IVth Year

60

-

3.9

... More
Vth Year

7

-

700

... More
Hoisting and fixing of 1000 mm dia pipes to proper gradient including all labour charges and allother incidental charges etc.,complete as per clause 2905 & 2906 of MORTH Vth Revision

-

-

-

... More
Vth Year

2640

-

3.9

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

27.36

-

235.5

... More
IVth Year

40.2

-

15.65

... More
IInd Year

46.9

-

15.65

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

1800

-

3.9

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months IV Year

331.88

-

16.64

... More
IVth Year

3.75

-

74.55

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

1800

-

3.9

... More
Vth Year

6

-

74.55

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method :Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for grading- V Material

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
IInd Year

150

-

73.1

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

2045

-

517

... More
Vth Year

42.9

-

7934.9

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
IVth Year

6

-

74.55

... More
Bituminous Macadam :Providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)

-

-

-

... More
IIIrd Year

7.5

-

74.55

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

5.4

-

69849.37

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

557.5

-

11.75

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

359.61

-

73.1

... More
IVth Year

1800

-

3.9

... More
IInd Year

13.4

-

15.65

... More
IInd Year

7.5

-

246.5

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

651.5

-

20.4

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503 - over Bituminous surfaces

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

2083.25

-

16.65

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

67.67

-

6319.16

... More
IInd Year

1320

-

73.1

... More
IVth Year

12

-

700

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Engaging JCB machine for clearing the culvert vent clearance and all incidental charges etc., complete as per directed by the Engineer. (Once in a Year)

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

810

-

17.91

... More
Vth Year

12.38

-

7934.9

... More
IIIrd Year

1500

-

3.9

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

220.13

-

1745

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

3

-

700

... More
Blasting hard rock measured in soild including blasting and stacking the materials for use as direct by the departmental officers as per class 302 of MORTH V Revision.

-

-

-

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

3.31

-

168

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

24.12

-

168

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

5

-

700

... More
IVth Year

5900

-

3.9

... More
Vth Year

375

-

16.64

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

3600

-

3.9

... More
IInd Year

14

-

700

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
IInd Year

46.95

-

15.65

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

2.51

-

2838.35

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

1.62

-

3109.02

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

479.9

-

20.4

... More
IIIrd Year

7.5

-

246.5

... More
White wash two coats with Slaked shell lime paint in for parapet of culverts and Minor Bridge including labour charges, brush and all other items etc., complete as directed by the departmental officers. [Once in a year]

-

-

-

... More
IVth Year

15

-

74.55

... More
Providing and fixing PVC Expansion Joint for full width of seating of deck slab and including cost and conveyance to work site. Labour charges for fixing the same in the correct position and all other incidental charges etc., as per MORTH Vth Revision Specifications No.2600

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

46.9

-

15.65

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

540

-

73.1

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges etc., complete Specifications No.2600

-

-

-

... More
Vth Year

3.75

-

74.55

... More
IIIrd Year

46.9

-

15.65

... More
Vth Year

487.5

-

16.64

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

35.7

-

305

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months IV Year

292.5

-

16.64

... More
IVth Year

400

-

73.1

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

5.7

-

69849.37

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

3

-

700

... More
IInd Year

1500

-

3.9

... More
IInd Year

7.5

-

74.55

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

788.14

-

1585.7

... More
Negotiated Percentage

1

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

48.6

-

9397.09

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

25.83

-

5589.28

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

185.83

-

12.99

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

107.22

-

73.1

... More
IVth Year

5.63

-

74.55

... More
IVth Year

13.5

-

246.5

... More
Vibrated reinforced cement concrete M25 (Design mix) using 20mm and below size ISS graded hard broken granite crushed metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting, curing, including all incidental charges etc., complete for Bed block cum Dirt wall as per clause900, 1000, 1500, 1600, 1700, 2100,2200 & 2300 of MORTH Vth Revision

-

-

-

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

581.25

-

60.53

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

44.73

-

488.39

... More
IIIrd Year

150

-

73.1

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

102

-

17.91

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

16.24

-

4979.64

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

51.89

-

235.5

... More
IIIrd Year

1560

-

73.1

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months Ist Year

9

-

246.5

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

16.27

-

8965.37

... More
Vth Year

412.5

-

16.64

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

225

-

12.99

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

86.03

-

6319.16

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

29.92

-

6861.01

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

20.25

-

6319.16

... More
Vth Year

67

-

15.65

... More
IIIrd Year

12.75

-

246.5

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

7393.13

-

16.64

... More
Vth Year

5900

-

3.9

... More
Bituminous Concrete (Table 500-17): Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.507 complete in all respects) - Grading-II

-

-

-

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

53775727

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

1862.65

-

73.1

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

50.61

-

6494.02

... More
IInd Year

6.75

-

246.5

... More
Painting two coats with approved firstquality ready mixed paint in KM, HM stones guard, boundary stones and center median of old plastered surface inculding labour charges, brush and all other items inculding lettering etc., complete as directed by the departmental officers. [Once in a year]

-

-

-

... More
IInd Year

46.9

-

15.65

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

1.92

-

69849.37

... More
Vth Year

13.4

-

15.65

... More
5. Junction improvement at km 2/4, 3/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months IV Year

84

-

16.64

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

95

-

942

... More
IVth Year

1080

-

73.1

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
IVth Year

2

-

700

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Footings of Abutment Wings and piers Below Sill Level as per clause 1000, 1500, 1700, 2100, 2200 of MORTH Vth Revision for Box culvert, Slab culvert, Well Protective wall

-

-

-

... More
Vth Year

11.25

-

7934.9

... More
IVth Year

46.95

-

15.65

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

6.75

-

246.5

... More
Vibrated Cement Concrete M30 design mix using IRC size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Deck slab and Approach slab as per clause 1000, 1500, 1700, 2100, 2200 & 2702 of MORTH Vth Revision for Box culvert, Slab culvert.

-

-

-

... More
Vth Year

1500

-

3.9

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

540

-

73.1

... More
Supply and fixing of RCC guide posts of size 1.20 x 0.20x 0.20m with Reflective star stickers with tin M.S Sheet with two side packing and top cover of 0.75 inches in R.C 1:2:4 mix using 20mm. HBG ISS metal with 10mm. Dia bars as vertical with 8mm. Dia stirrups including 8.25 inches x4.25 feet mould with star shade of 5 inches and top projection by projection by 0.75 x inches x 3 inches including cost and conveyance of materials to worksite etc., complete.

-

-

-

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

600

-

73.1

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

9.94

-

3109.06

... More
Vth Year

1080

-

73.1

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

104.49

-

73.1

... More
Vth Year

40.2

-

15.65

... More
Supply of NP3class RCC 1000mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete as per clause 1013,2900 & 2911 of MORTH Vth Revision

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

9.75

-

4863.87

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

5

-

3700

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

2.59

-

8361.65

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

46.62

-

493.64

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

1352.5

-

11.75

... More
IVth Year

1770

-

73.1

... More
Vibrated Reinforced Cement Concrete of grade M25 Design mix using ISS size HBG graded metal including cost and conveyance of all materials to site complying withrequired standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaing of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Deck slab Bottom slab side wall, and top slab & Box culvert as per clause 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision

-

-

-

... More
IVth Year

9

-

246.5

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

102.06

-

73.1

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months Ist Year

885

-

73.1

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

660

-

73.1

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

7.53

-

3107.71

... More
Construction of Well protecting wall at km 29/4 of Harur - Kottapatty road

32.4

-

73.1

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

4.6

-

69849.37

... More
IInd Year

1.5

-

246.5

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

557.5

-

60.56

... More
Excavation for Roadway and Drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as instructed by the Engineer. for Boxing as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision etc complete.

-

-

-

... More
IInd Year

1560

-

73.1

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

9

-

246.5

... More
IIIrd Year

13.5

-

246.5

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

3.25

-

2811.07

... More
IVth Year

2600

-

3.9

... More
IInd Year

2640

-

3.9

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

46.95

-

15.65

... More
IVth Year

150

-

73.1

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

2640

-

3.9

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

3.75

-

74.55

... More
IVth Year

3600

-

3.9

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

2600

-

3.9

... More
Vth Year

553.13

-

16.64

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

8.57

-

8386.36

... More
Providing and fixing 110mm dia PVC Seepage Pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill in the Abutment and wings as per clause 2700 of MORTH Vth Revision

-

-

-

... More
Construction of Well protecting wall at km 29/4 of Harur - Kottapatty road

56.78

-

235.5

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

107.22

-

73.1

... More
IInd Year

12.75

-

246.5

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

1168.89

-

1524.1

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

11.49

-

3230.42

... More
Add GST at 12%

1

-

6453087

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

436.64

-

8043.38

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

780

-

73.1

... More
IVth Year

46.9

-

15.65

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months Ist Year

7

-

700

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

33.3

-

305

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

83.64

-

1745

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months Ist Year

12

-

700

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

879

-

73.1

... More
IIIrd Year

6.75

-

246.5

... More
IVth Year

67

-

15.65

... More
IIIrd Year

9

-

246.5

... More
Blasting and Removing SDR- (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in sofr disintergrated rock, laterite soft rock of kanker, not requiring blasting SI.No.62 as per clause 302 of MORTH Vth Revision

-

-

-

... More
Excavation for Roadway Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for making up berms

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Providing and laying Bituminous Concreteto 40mm thickusing 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30/VG40 bitumen and 3.02 Kgs of Waste Plastic for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing themin required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grade sand cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required densityetc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler, tippertrucks, Paver Finisher / 9m paverfinisher, Vibratory/Pneumaticroller and all other tools and plant required, including fuel and allother incidental chargesetc., complete a spe rspecification using CMP as per clause 507 of MORTHRev-5

-

-

-

... More
Vth Year

60

-

3.9

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

15

-

74.55

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

1341.5

-

16.65

... More
IInd Year

4.5

-

74.55

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

5153.8

-

60.54

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

557.5

-

11.75

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
IVth Year

7

-

700

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

557.5

-

60.56

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

15.01

-

2809.71

... More
IIIrd Year

3

-

700

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 0/8, 1/6 of Andiyur - Ammapet road

27.36

-

235.5

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
IIIrd Year

1.5

-

246.5

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
IVth Year

1080

-

73.1

... More
Vth Year

742.5

-

16.64

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

2

-

550

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

17.61

-

500.55

... More
Vth Year

7

-

700

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

767.4

-

73.1

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Construction of Well protecting wall at km 29/4 of Harur - Kottapatty road

10.2

-

4877.64

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

6.91

-

5792.6

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

7

-

700

... More
Vth Year

150

-

73.1

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

47.57

-

6319.16

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

24.06

-

2932.81

... More
IInd Year

1800

-

3.9

... More
Vth Year

7.5

-

246.5

... More
IIIrd Year

40.2

-

15.65

... More
IIIrd Year

3.75

-

74.55

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

405

-

11.74

... More
IVth Year

46.9

-

15.65

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

27.3

-

503.08

... More
Vth Year

3600

-

3.9

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months IV Year

25.74

-

7934.9

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

60.75

-

1745

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

9.08

-

2858.35

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months IV Year

1.24

-

7934.9

... More
Vth Year

1080

-

73.1

... More
IVth Year

9

-

246.5

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank as per SS20B with all leads and lifts and all other icidental charges such as baling out water shoring shrutting walling and forming protective bunds wherever necessary etc.,comlete as per relavant specification for Foundation of Culvert,Drain and Retaining wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for base concrete of culverts, Well protective wall, Retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

3.36

-

100

... More
IVth Year

5

-

700

... More
Vth Year

1560

-

73.1

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

1168.45

-

1745

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

9.75

-

4712.62

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

144

-

17.91

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 08, 0/10, 1/2(i) of Kattarasampatti road

38.34

-

168

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

3129

-

108.9

... More
IInd Year

6

-

74.55

... More
IIIrd Year

5900

-

3.9

... More
IVth Year

13.4

-

15.65

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

95.4

-

6319.16

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-

... More
Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of MORTH - Vth Revision etc.,complete.

-

-

-

... More
Advance patch work 50mm thick using 45 mm IRC size HBG metal for making the pot holes and patching using VG 10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per clause 111, 112, 501, 3004 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

1.5

-

246.5

... More
Vth Year

2.06

-

7934.9

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

1

-

550

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months

23.4

-

2808.26

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

12

-

700

... More
IInd Year

3

-

700

... More
IInd Year

3.75

-

74.55

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

950.75

-

60.56

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

5918.97

-

60.52

... More
IInd Year

7

-

700

... More
IInd Year

60

-

3.9

... More
IIIrd Year

5.63

-

74.55

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

289.65

-

8043.38

... More
Vth Year

9

-

246.5

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

8.09

-

3126.03

... More
Vth Year

46.95

-

15.65

... More
IInd Year

40.2

-

15.65

... More
IVth Year

7.5

-

246.5

... More
Vth Year

46.9

-

15.65

... More
Vth Year

5

-

700

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months IV Year

247.5

-

16.64

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

259.57

-

8043.38

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

26.5

-

9719.16

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

-

-

-

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
IInd Year

2600

-

3.9

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

68.81

-

8043.38

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

16.14

-

2828

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

2810.04

-

73.1

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

10.75

-

3262.78

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months IV Year

445.5

-

16.64

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months

11071.25

-

16.64

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
IIIrd Year

1800

-

3.9

... More
IIIrd Year

60

-

3.9

... More
IInd Year

400

-

73.1

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

122.38

-

4830.39

... More
Vth Year

6.75

-

246.5

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

135

-

12.99

... More
IInd Year

12

-

700

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision for disposal of earth with an average lead of 2 km ( conveyance only)

-

-

-

... More
IInd Year

15

-

74.55

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

25.52

-

7165.11

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

1770

-

73.1

... More
IVth Year

1320

-

73.1

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

46.9

-

15.65

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

0.66

-

69849.37

... More
7. Improvements to Riding Quality at km 0/4 - 2/2 and 2/4 - 2/8 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road including upkeeping for a period of 60 months

653.77

-

73.1

... More
Vth Year

4.2

-

7934.9

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

233.94

-

8043.38

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

-

-

-

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

9401

-

16.64

... More
IVth Year

14

-

700

... More
IVth Year

1500

-

3.9

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months Ist Year

2

-

700

... More
IIIrd Year

67

-

15.65

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

24.12

-

168

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces

-

-

-

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months Ist Year

7

-

700

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

1052.65

-

20.4

... More
IInd Year

5900

-

3.9

... More
IVth Year

7.5

-

74.55

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

4.24

-

168

... More
3. Improvements of Kattarasampatti road at km 0/0 - 2/0 and including reconstruction of box culvert at Km 0/8,0/10 1/2 (i) including upkeeping for a period of 60 months

-

-

-

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 29/4, 29/10 of Harur - Kottapatty road

33.74

-

6698.35

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

519

-

17.91

... More
widening of slab culvert at Km 0/4 of Andiyur - Ammapet road

8.16

-

7666.79

... More
6. Improvements to Riding Quality at km 2/8 - 3/4 and 3/6 - 5/6 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road (Using plastic waste) including upkeeping for a period of 60 months Ist Year

14

-

700

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

2.42

-

69849.37

... More
Reconstruction of box culvert at Km 0/2, 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road

27.3

-

491.54

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

7.5

-

74.55

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

54.69

-

73.1

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
Vth Year

1320

-

73.1

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months Ist Year

1500

-

3.9

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months Ist Year

1.5

-

246.5

... More
Widening of pipe culvert at Km 2/4 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road

4.86

-

235.5

... More
Widening of slab culvert at Km 33/6 of Harur - Kottapatty road

4

-

120

... More
IIIrd Year

6

-

74.55

... More
2. Improvements to Riding Quality at km 0/0 - 2/950 of Ammapet - Thambal road including upkeeping for a period of 60 months Ist Year

5.63

-

74.55

... More
Reconstruction of box culvert (1.50 x 1.50) at Km 34/6, 34/8 of Harur - Kottapatty road

26.5

-

9870.41

... More
8. Widening from Single lane to Intermediate lane and Improvements of Andiyur - Ammapet road at km 0/0 - 1/8 and Geometrical Improvements at KM 0/6, 1/4 including widening of slab culvert at KM 0/4 and Reconstrction of Box culvert at KM 0/8, 1/6 including upkeeping for a period of 60 months Ist Year

67

-

15.65

... More
4. Junction improvement at km 0/2 & 0/4 of Sittlingli - S.Thathampatii road to Naikuthi (Via) Velanur road reconstruction of box culvert at Km 0/2, 0/4 including upkeeping for a period of 60 months

581.9

-

73.1

... More
IIIrd Year

2640

-

3.9

... More
IInd Year

5.63

-

74.55

... More
1. Widening from Single lane to Intermediate lane and Improvements of Harur - Kottapatti road at km 29/0 - 30/0, 33/100 - 33/6 and 34/4 - 34/8, Improvements at km 33/6 - 34/4 and including reconstruction of box culvert Km 29/4, 29/10, 34/6, 34/8 widening of slab culvert at Km 33/6 and Construction of well protective wall at Km 29/4 including upkeeping for a period of 60 months

5153.8

-

11.75

... More
IIIrd Year

7

-

700

... More
Vth Year

9

-

246.5

... More
Vth Year

2

-

700

... More
5. Junction improvement at km 2/4,3/6 of Sittlingli- S.Thathampatii road to Naikuthi (Via) Velanur road including widening of pipe culvert at Km 2/4 including upkeeping for a period of 60 months

-

-

-

... More
IInd Year

13.5

-

246.5

... More
IIIrd Year

2600

-

3.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.