Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Tnv 30 Sankarankoil H C And M Sub Division in Tenkasi, Tamil Nadu, with an estimated contract value of Rs. 5,05,68,551. The bid opening date for this tender is 07-08-2023 and the last date for bid submission is 22-08-2023. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date7 Aug 2023
Closing Date22 Aug 2023
Tender Amount₹ 5,05,68,551 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Tnv 30 Sankarankoil H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF RETAINING WALL, Pipe culvert and Dressing the bed upto sill level

-

-

-

... More
Road D

400

50708

126.77

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Total Value put to Tender

1

-

51084505

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Road A (Box Culvert) Km 2/4

11.66

3001

257.4

... More
Road A (Box culvert ) Km 2/0

45.69

5119

112.05

... More
Road A (Box culvert ) Km 2/0

66

17028

258.01

... More
Negotiated Percentage

1

-

-

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Top SLAB OF BOX CULVERT.

-

-

-

... More
Road B

480

60849

126.77

... More
Dismantling of Existing RR masonry including T&P and scaffolding wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking carefully the serviceable materials with all lead and lift without causing any detrimental effects taking all necessary safety precautions and traffic damaged pipe culvert and Box culvert

-

-

-

... More
Add GST at 18%

1

-

7792552

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
Road A (Box Culvert) Km 2/4

9.18

53767

5857

... More
Road A

140

2353

16.81

... More
Road A

658.7

6163627

9357.26

... More
Road B

570.06

5785738

10149.35

... More
Road A (Box culvert ) Km 2/0

5.94

35117

5912

... More
Road A (Box culvert ) Km 2/0

410.42

79186

192.94

... More
Road A (Box Culvert) Km 2/4

12.5

51625

4130

... More
Plain Cement Concrete M20 grade mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Foundation of Retaining Wall and Box culvert

-

-

-

... More
Basic cost of value put to tender as per Estimate

-

43291953

-

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Road A

340.16

43122

126.77

... More
Road A

49.89

1265

25.36

... More
Road A (Box culvert ) Km 2/0

59

11443

193.96

... More
Final Negotiated Value

1

-

-

... More
Road D

17040

412538

24.21

... More
Road A (Box Culvert) Km 2/4

83.2

9322

112.05

... More
Road A (Box culvert ) Km 2/0

2.88

22129

7684

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No.111, 112,501, 503 & 900.

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF RETAINING WALL

-

-

-

... More
Road C

99

785133

7930.64

... More
Road A (Box Culvert) Km 2/4

29

254620

8780

... More
Providing and laying Gravel soling for specified thick with clean good gritty over the well prepared sub grade from the approved quarry including cost and conveyance of materials laying in accordance with the requirement and specification shown in the drawing or as directed by tghe engineer for Diversion road

-

-

-

... More
Road A (Box Culvert) Km 2/4

25.5

260559

10218

... More
Road C

292.49

2968583

10149.35

... More
Road A (Box Culvert) Km 2/4

15.46

191193

12367

... More
Supply and fabrication of steel Grade Fe-500 / required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Road B

19002

460228

24.22

... More
Road C

9749.5

236132

24.22

... More
Supply and Fixing of of NP3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2000 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete

-

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Granular Sub-base with Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading- V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900.

-

-

-

... More
Road D

681.6

6917796

10149.35

... More
Road A (Box culvert ) Km 2/0

8.03

80219

9990

... More
Road A (Box Culvert) Km 2/4

4.67

442261

94804.27

... More
Road A (Box culvert ) Km 2/0

12.5

51625

4130

... More
Road A (Box Culvert) Km 2/4

9.04

88917

9836

... More
Road E

780

98880

126.77

... More
Removing the Cutstone Slab including all labour and other incidental charges wherever necessary, sorting the dismantled materials, disposal of unserviceable material and stacking carefully the serviceable materials with all lead and lift without causing any detrimental effects taking all necessary safety precautions and traffic damaged Cutstone slab and Box culvert

-

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 97% compacion.

-

-

-

... More
Road A (Box Culvert) Km 2/4

59

11443

193.96

... More
Road B

189

1498890

7930.64

... More
Road A (Box Culvert) Km 2/4

2.25

15738

6995

... More
Basic cost of value put to tender as per estimate

1

-

43291953

... More
Providing and Laying of Side Earth including cost and conveyance of the same to work site with an average lead of 5Km including stacking the same to departmental gauge for premeasurement including all labour charges for laying spreading etc complete and as directed by departmental engineers for making up of berm including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112,202, 301 to 305, 900 Side Earth

-

-

-

... More
Road A (Box culvert ) Km 2/0

1.17

8165

6979

... More
Road A

49.84

1263

25.36

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501,507 & 900.

-

-

-

... More
Bituminous Macadam (Providing and laying 50mm bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900.

-

-

-

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTING OF RETURN WALL.

-

-

-

... More
Road A

53.2

1018

19.15

... More
Road D

98

777202

7930.64

... More
Road A (Box culvert ) Km 2/0

13.68

122695

8969

... More
Vibrated Cement Concrete M20 grademix using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (above sill level)

-

-

-

... More
Road A (Box culvert ) Km 2/0

10.66

114008

10695

... More
Road A

21

34045

1621.23

... More
Road A

140

10516

75.12

... More
Road A (Box culvert ) Km 2/0

9.46

140367

14838

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900.

-

-

-

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111,112,501,502 &900 .

-

-

-

... More
Road A

395.22

4011226

10149.35

... More
Road A (Box culvert ) Km 2/0

14.39

3703

257.4

... More
Road A (Box Culvert) Km 2/4

9

4196

466.3

... More
Road E

840.15

8526976

10149.35

... More
Road A (Box culvert ) Km 2/0

5.81

33942

5842

... More
Road A (Box Culvert) Km 2/4

66

17028

258.01

... More
Road A

12980.8

314265

24.21

... More
Road A (Box Culvert) Km 2/4

8.2

48601

5927

... More
Road A (Box culvert ) Km 2/0

2.29

217006

94804.27

... More
Road A (Box culvert ) Km 2/0

41.01

4595

112.05

... More
Dense Bituminous Macadam (Providing and laying 50 - 75 mm dense bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900.

-

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Road A (Box Culvert) Km 2/4

3.11

23626

7597

... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet.

-

-

-

... More
Excavation for Roadway and Drainage. Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or a sindicated by the Engineer as per SS20B for 97% Compaction for making up Berms MORTH Rev.V Clause No.111,112,301 to 305. a)Box Cutting for widening portion.

-

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 95% compacion.

-

-

-

... More
Road A (Box Culvert) Km 2/4

69.54

7791

112.05

... More
Road C

342

43355

126.77

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for spreading and making up the berms as per SS20B including braking clods, consolidating and sectioning using Excavated Earth.

-

-

-

... More
Road E

105

832717

7930.64

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT and Box culvert Top and Bottom of Box Culvert

-

-

-

... More
Road A

35

65577

1873.64

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL- BELOW SILL LEVEL

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.