Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Shifting Of Existing Eb Poles For Athanoor To Milagunatham Road Lt 3 Phase 4 And 5 Wire Lt Line Road Crossing Athanoor Ss1 100 Kva In Eppodumvendran Section in Tuticorin, Tamil Nadu, with an estimated contract value of Rs. 1,45,000. The bid opening date for this tender is 12-11-2026 and the last date for bid submission is 30-11-2026. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender - TN Tender

Opening Date12 Nov 2026
Closing Date30 Nov 2026
Tender Amount₹ 1,45,000 
Notes
Download

Costs

Description

Shifting Of Existing Eb Poles For Athanoor To Milagunatham Road Lt 3 Phase 4 And 5 Wire Lt Line Road Crossing Athanoor Ss1 100 Kva In Eppodumvendran Section

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Supply and fixing of Base plate including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

5

477

2385

... More
Supply and fixing of 3phase x Arm including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

8

518

4144

... More
Supply and fixing of LISTAY SHACKLE including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

19

17

334.02

... More
Supply and fixing of LT Metal parts including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

19

44

836

... More
Supply and fixing of LT PIN INSULATOR including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

8

18

144

... More
Supply and fixing of Stay set complete including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

6

433

2598.36

... More
Supply and fixing of Stay clamp 9 mtr including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

6

111

666

... More
Supply and fixing of Stay wire 7/12 including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

30

83

2490

... More
Supply and fixing of ALU KNOB including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

8

40

320

... More
Supply and fixing of 7/2.59.ACSRT CONDUCTOR including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

966

49

47334

... More
Supply and fixing of 7/3.15 AAAC Conductor including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

231

67

15592.5

... More
Supply and fixing of Bolt & Nut 4.5 including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

6

88

528

... More
Supply and fixing of MS/Waser (1635) including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

2

96

193.52

... More
Supply and fixing of Pole concreting including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

2

1022

2044

... More
Supply and fixing of LT TI Fitting including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

6

196

1176

... More
Supply and fixing of Stay shackle /MP including GI wire including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

6

25

150

... More
Supply and fixing of Back clamp 9 mtr including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

4

116

464

... More
Supply and fixing of Pole Earthing including cost and conveyance of materials and storage at section store including labour, transporting and shifting charges and all other incidental charges etc., complete

2

1090

2180

... More
Labours and Transport charges 15% for new material

1

17624

17624

... More
labour & Transport charges for re erection of dismantlted material at new site 20%

1

8840

8840

... More
Dismantling charges for Reusable Materials devolubted to store (B)

1

3100

3100

... More
Transporting Charges for Scrap Materials devoluted to store (D)

1

170

170

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

121803

-

... More
Add GST at 18%

1

21925

-

... More
Total Value put to Tender

1

143728

-

... More
Difference in Value

1

-

-

... More
Bidder quoted value

1

-

-

... More
Add GST at 18% of Final quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

121803

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.