Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Widening And Improvements, Rebuildig Cd Works Retaining Wall And Up Keeping For A Period Of 60 Months To Government Highways Roads In Sathy H Cm Sub Division Jurisdiction Package No 8 in Erode, Tamil Nadu, with an estimated contract value of Rs. 5,22,00,000. The bid opening date for this tender is 29-05-2020 and the last date for bid submission is 01-07-2020. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender

Eprocure
Opening Date29 May 2020
Closing Date1 Jul 2020
Tender Amount₹ 5,22,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road D

299.2

-

7125.3

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 15CM

1

-

-

... More
Clearing of Light jungle and as directed by the departmental officers etc Complete. ( twice a year)

1

-

-

... More
V th Year

2156

-

9.14

... More
II nd Year

222

-

103.13

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification. (Morth No. 111, 112, 406, 900)

1

-

-

... More
Road C

207.1

-

7079.7

... More
IV th Year

302

-

103.13

... More
II nd Year

1078

-

5.49

... More
III rd Year

6

-

9.14

... More
Road D

199.1

-

6755.68

... More
V th Year

60

-

5.49

... More
II nd Year

616

-

5.49

... More
II nd Year

1232

-

9.14

... More
III rd Year

52.8

-

18.08

... More
II nd Year

14

-

70.01

... More
III rd Year

5

-

700

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works with JCB. (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 15 cm

1

-

-

... More
IV th Year

300

-

103.13

... More
Bituminous Concrete Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 512 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 507, 900, 3004)

1

-

-

... More
Road A

2188.4

-

1756.99

... More
II nd Year

3

-

700

... More
Clearing of Light jungle and as directed by the departmental officers etc Complete. ( twice a year)

1

-

-

... More
I st Year

20.8

-

70.01

... More
V th Year

1584

-

4.4

... More
Vibrated Cement Concrete M20 grade Nominal Mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc., complete as per standard specification for PCC parapets (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
II nd Year

2156

-

9.14

... More
II nd Year

2.6

-

127.7

... More
Tree banding - (White washing and japan black) with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification.

1

-

-

... More
Road A

28

-

5273.25

... More
V th Year

2.2

-

127.7

... More
Road C

9.4

-

531.61

... More
III rd Year

2.2

-

127.7

... More
Road C

13.2

-

4482.79

... More
I st Year

3780

-

4.4

... More
III rd Year

2.6

-

127.7

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
III rd Year

2156

-

9.14

... More
Road C

20.3

-

5253.5

... More
Road B

3.6

-

4497.13

... More
IV th Year

222

-

103.13

... More
Filling behind abutment and wings with carted earth including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. (Morth No. 304, 900)

1

-

-

... More
Road B

3489

-

10.83

... More
I st Year

1078

-

5.49

... More
Road B

164.1

-

29.3

... More
Road C

9.9

-

5426.12

... More
Road C

37.5

-

3700

... More
I st Year

2156

-

9.14

... More
I st Year

2.4

-

127.7

... More
IV th Year

11.6

-

70.01

... More
Road B

350

-

15.31

... More
IV th Year

1584

-

4.4

... More
Road B

32.3

-

7353.23

... More
I st Year

33.6

-

18.08

... More
Road C

1278.1

-

84

... More
IV th Year

5.9

-

7087.38

... More
II nd Year

2.2

-

127.7

... More
V th Year

20.8

-

70.01

... More
Road C

119

-

198

... More
V th Year

9.9

-

7087.38

... More
III rd Year

7

-

700

... More
II nd Year

12

-

9.14

... More
II nd Year

52.8

-

18.08

... More
Road B

357

-

198

... More
III rd Year

14

-

70.01

... More
I st Year

6

-

9.14

... More
Road C

2.3

-

73383

... More
II nd Year

6

-

9.14

... More
IV th Year

1232

-

9.14

... More
Providing and fixing seepage pipes of 150mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN RETAINING WALLS. (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900)

1

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts all other incidental charges such as shoring, strutting, balling out water and forming protective bunds, wherever necessary etc., completes as per standard specification SS20B for Foundation of culverts. (Morth No. 111, 112, 304)

1

-

-

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 15 cm

1

-

-

... More
IV th Year

2156

-

9.14

... More
Road D

536.8

-

1756.99

... More
White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete

1

-

-

... More
I st Year

260

-

103.13

... More
IV th Year

2.6

-

127.7

... More
III rd Year

1791

-

4.4

... More
Road A

91.7

-

7140.49

... More
I st Year

2.2

-

127.7

... More
Road A

569

-

6307.18

... More
IV th Year

14

-

70.01

... More
Road B

287.8

-

7090.5

... More
Road A

2.4

-

4512.8

... More
Road A

432

-

198

... More
Road B

87

-

7449.67

... More
V th Year

3780

-

4.4

... More
Road A

9

-

5273.9

... More
II nd Year

2349

-

4.4

... More
White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete

1

-

-

... More
III rd Year

30

-

5.49

... More
Road A

8753.8

-

10.83

... More
Road C

114.7

-

7266.41

... More
V th Year

11

-

700

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
Road B

4176.4

-

17.03

... More
Road A

5

-

3700

... More
Filling behind abutments and wings with cut earth in culvert portion for labour only (for Retaining Wall) (Morth No. 304, 900)

1

-

-

... More
Road C

29

-

7437

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete

1

-

-

... More
V th Year

11.6

-

70.01

... More
Road A

116

-

7467

... More
Road A

8753.8

-

50.14

... More
V th Year

300

-

103.13

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
Road C

90

-

172.8

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. For box cutting. (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
III rd Year

302

-

103.13

... More
Road C

3703.6

-

50.14

... More
I st Year

1791

-

4.4

... More
I st Year

770

-

5.49

... More
Road C

1.7

-

10778.87

... More
UPKEEPING ROAD A

1

-

-

... More
IV th Year

3780

-

4.4

... More
III rd Year

300

-

103.13

... More
I st Year

1540

-

9.14

... More
Road A

8

-

73383

... More
Bituminous Concrete Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 512 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 507, 900, 3004)

1

-

-

... More
II nd Year

7

-

700

... More
V th Year

12

-

9.14

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and lines, grades and cross sections shown in the drawings or as indicated by the Engineer for For making of berms. (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 504, 900, 3004)

1

-

-

... More
IV th Year

2.2

-

127.7

... More
III rd Year

30

-

5.49

... More
II nd Year

2.2

-

127.7

... More
Road D

130

-

172.8

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 10CM

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 15 cm

1

-

-

... More
I st Year

300

-

103.13

... More
Vibrated Cement Concrete M20 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cement complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for Body wall of culverts (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Road A

60

-

168

... More
Add GST at 12%

1

-

5589249

... More
Road B

126

-

172.8

... More
II nd Year

1584

-

4.4

... More
Clearing of Light jungle and as directed by the departmental officers etc Complete. ( twice a year)

1

-

-

... More
V th Year

30

-

5.49

... More
V th Year

302

-

103.13

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert. (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
IV th Year

2.2

-

127.7

... More
Add GST at 12% of Quoted Amount

1

-

-

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 15CM

1

-

-

... More
III rd Year

12

-

9.14

... More
Road B

7.5

-

3700

... More
I st Year

1584

-

4.4

... More
V th Year

1232

-

9.14

... More
Road D

4488.8

-

17.03

... More
Road D

472.4

-

1471.21

... More
Road A

21.5

-

7368.9

... More
Vibrated cement concrete M20 nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement to be procured and supplied by the contractor at site including formwork and centering, soft water, labour charges for mixing, transporting and placing in position vibrating, compacting, finishing and curing hire charges for tools and plants including all other incidental charges etc., complete as per standard specification for Retaining wall body wall (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Road A

262.6

-

6755.68

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

1

-

-

... More
Road D

64.9

-

168

... More
Road B

158.5

-

6307.18

... More
I st Year

3

-

700

... More
Road D

1086.1

-

84

... More
Clearing of Light jungle and as directed by the departmental officers etc Complete. ( twice a year)

1

-

-

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 10CM

1

-

-

... More
IV th Year

30

-

5.49

... More
III rd Year

1540

-

9.14

... More
IV th Year

52.8

-

18.08

... More
Road A

104

-

9391.75

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 10CM

1

-

-

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 15CM

1

-

-

... More
III rd Year

2349

-

4.4

... More
V th Year

13.2

-

7017.3

... More
V th Year

440

-

17.03

... More
IV th Year

12

-

9.14

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
II nd Year

1791

-

4.4

... More
III rd Year

1232

-

9.14

... More
V th Year

330

-

17.03

... More
I st Year

11

-

700

... More
Bituminous Concrete Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 512 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 507, 900, 3004)

1

-

-

... More
II nd Year

300

-

103.13

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 15CM

1

-

-

... More
UPKEEPING ROAD B

1

-

-

... More
V th Year

52.8

-

18.08

... More
Road D

224.4

-

5413.82

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts all other incidental charges such as shoring, strutting, balling out water and forming protective bunds, wherever necessary etc., completes as per standard specification for Foundation SS20B FOUNDATION OF RETAINING WALLS. (Morth No. 111, 112, 304)

1

-

-

... More
V th Year

12

-

9.14

... More
III rd Year

2.2

-

127.7

... More
SLAB CULVERT

1

-

-

... More
Differnce Amount (Excess/less)

1

-

-

... More
III rd Year

1078

-

5.49

... More
III rd Year

12

-

9.14

... More
IV th Year

2349

-

4.4

... More
PIPE CULVERTS

1

-

-

... More
Road A

743.9

-

103.13

... More
Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment. (Morth No. 2600, 900)

1

-

-

... More
Plain Cement Concrete of grade 1:2:4 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.. (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
IV th Year

7.9

-

7017.3

... More
V th Year

1078

-

5.49

... More
Road C

13.3

-

7872.57

... More
V th Year

2349

-

4.4

... More
I st Year

60

-

5.49

... More
Providing and fixing kraft paper for full width of seating of deck spab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete. (Morth No. 2600)

1

-

-

... More
I st Year

60

-

5.49

... More
Road B

9.4

-

5445.47

... More
Road B

261.3

-

5413.82

... More
Road A

16

-

168

... More
IV th Year

264

-

17.03

... More
Road C

20

-

172.8

... More
IV th Year

1078

-

5.49

... More
Vibrated Plain Cement Concrete M.20 Grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for substructure of abutment and wings - above sill level (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
V th Year

1078

-

5.49

... More
Road C

30

-

9342

... More
II nd Year

60

-

5.49

... More
Road A

601.6

-

84

... More
IV th Year

12

-

9.14

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Abutments and Piers. (Morth No. 111, 112, 304)

1

-

-

... More
Road C

3703.6

-

10.83

... More
Road D

526.5

-

19.13

... More
II nd Year

60

-

5.49

... More
Road C

135

-

168

... More
I st Year

7

-

700

... More
Road B

7.5

-

238

... More
IV th Year

1078

-

5.49

... More
V th Year

440

-

17.03

... More
II nd Year

11

-

700

... More
I st Year

14.4

-

18.08

... More
V th Year

385

-

17.03

... More
Road C

7.1

-

134.1

... More
IV th Year

30

-

5.49

... More
II nd Year

6

-

9.14

... More
II nd Year

14.4

-

18.08

... More
Road C

31.4

-

6309.03

... More
III rd Year

1078

-

5.49

... More
Basic cost of value put to tender as per estimate

1

-

46577071

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and material etc., complete 10CM

11

-

-

... More
Road C

111.5

-

168

... More
Road D

170.6

-

29.3

... More
I st Year

30

-

5.49

... More
Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7). (Morth No. 111, 112, 501, 504, 900, 3004)

1

-

-

... More
II nd Year

12

-

9.14

... More
IV th Year

60

-

5.49

... More
IV th Year

2.4

-

127.7

... More
Road D

2147.3

-

50.14

... More
Road A

584.9

-

1462.41

... More
Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete

1

-

-

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification. (Morth No. 111, 112, 202)

1

-

-

... More
Vibrated Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for Foundation of culverts (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
V th Year

7

-

700

... More
IV th Year

260

-

103.13

... More
V th Year

11.6

-

7035.99

... More
I st Year

2.6

-

127.7

... More
I st Year

2.2

-

127.7

... More
IV th Year

264

-

17.03

... More
Box culvert.

1

-

-

... More
I st Year

2156

-

9.14

... More
III rd Year

20.8

-

70.01

... More
III rd Year

3780

-

4.4

... More
Bituminous Concrete Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 512 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 507, 900, 3004)

1

-

-

... More
IV th Year

14.4

-

18.08

... More
I st Year

6

-

9.14

... More
III rd Year

2156

-

9.14

... More
Vibrated cement concrete grade M30 nominal mix (1:1.5:3) using ISS size HGB graded metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, cincluding all incidental charges etc. complete for wearing coat 75mm uniform thickness over deck slab. (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Vibrated reinforced cement concrete grade M25 nominal mix using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges compacting, finishing and curing, including all incidental charges etc. complete for bed block and dirt wall.

1

-

-

... More
Road D

4.8

-

4530.2

... More
Road D

128.8

-

6307.18

... More
V th Year

5

-

700

... More
I st Year

14

-

70.01

... More
I st Year

1078

-

5.49

... More
Road B

28.1

-

5264.3

... More
IV th Year

33.6

-

18.08

... More
II nd Year

2.4

-

127.7

... More
RETAINING WALLS

1

-

-

... More
Road C

246.7

-

6755.68

... More
I st Year

616

-

5.49

... More
Tree banding - (White washing and japan black) with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification.

1

-

-

... More
V th Year

2.2

-

127.7

... More
V th Year

15.3

-

70.01

... More
Road A

601.6

-

19.13

... More
Road D

2147.3

-

10.83

... More
II nd Year

1540

-

9.14

... More
Road B

21

-

5255.67

... More
V th Year

1540

-

9.14

... More
V th Year

24

-

18.08

... More
V th Year

1791

-

4.4

... More
Supply and fabrication of STEEL grade Fe500 D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. (Morth No. 1000, 1500, 1600, 900)

1

-

-

... More
Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete (Morth No. 2900, 900)

1

-

-

... More
III rd Year

1584

-

4.4

... More
Road C

118.1

-

29.3

... More
Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per S S 20 B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavaion back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of abutment and wings. (Morth No. 111, 112, 304)

1

-

-

... More
III rd Year

60

-

5.49

... More
Road D

195

-

168

... More
Total Value put to Tender

1

-

52166320

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 15 cm

1

-

-

... More
III rd Year

11.6

-

70.01

... More
I st Year

5

-

700

... More
IV th Year

15.3

-

70.01

... More
UPKEEPING ROAD C

1

-

-

... More
IV th Year

1791

-

4.4

... More
V th Year

30

-

5.49

... More
Road B

819.7

-

1756.99

... More
Vibrated Plain Cement Concrete M.20. Grade using 40 mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removel etc., complete as per standard specification for footings of abutment and wings - below sill level (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces (Morth No. 111, 112, 501, 503, 900)

1

-

-

... More
III rd Year

14.4

-

18.08

... More
Road C

1.8

-

100

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN RETAINING WALLS. (Morth No. 111, 112, 1000, 1500, 1700, 2200 , 900)

1

-

-

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet. (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
I st Year

52.8

-

18.08

... More
V th Year

60

-

5.49

... More
I st Year

222

-

103.13

... More
I st Year

1232

-

9.14

... More
Road A

42

-

172.8

... More
II nd Year

770

-

5.49

... More
IV th Year

1540

-

9.14

... More
IV th Year

20.8

-

70.01

... More
II nd Year

260

-

103.13

... More
Vibrated cement concrete M20 nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement to be procured and supplied by the contractor at site including formwork and centering, soft water, labour charges for mixing, transporting and placing in position vibrating, compacting, finishing and curing hire charges for tools and plants including all other incidental charges etc., complete as per standard specification for Foundation Retaining wall (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Road B

24

-

168

... More
III rd Year

11

-

700

... More
Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete

1

-

-

... More
II nd Year

33.6

-

18.08

... More
V th Year

14

-

70.01

... More
IV th Year

24

-

18.08

... More
Road B

230

-

6755.68

... More
III rd Year

60

-

5.49

... More
IV th Year

11

-

700

... More
IV th Year

5

-

700

... More
I st Year

12

-

9.14

... More
V th Year

6

-

9.14

... More
I st Year

24

-

18.08

... More
Road C

1.8

-

566

... More
V th Year

2.4

-

127.7

... More
Road A

5

-

238

... More
Tree banding - (White washing and japan black) with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification.

1

-

-

... More
V th Year

33.6

-

18.08

... More
IV th Year

231

-

17.03

... More
White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete

1

-

-

... More
Tree banding - (White washing and Japan Black) with freshly burnt shell lime including cost of fresh lime with suitable colour agent has to be done around the entire circumference of the trees to a hight of 0.9M consisting of 3 strips. White Washing to be start at a hight of 0.7M from the ground level such that the banding will be sufficiently visible to the driver seated at the height of 1.5M from the ground level. the cost inclusive of all materials, brushes and labours. Tree banding to be done as prescribed in the drawing or as directed by the Engineer incharge, as per MoRTH specification.

1

-

-

... More
UPKEEPING ROAD D

1

-

-

... More
Road C

362.5

-

15.31

... More
Road C

549.4

-

1449.21

... More
II nd Year

2156

-

9.14

... More
V th Year

222

-

103.13

... More
IV th Year

2156

-

9.14

... More
I st Year

11.6

-

70.01

... More
Road C

2

-

6817.41

... More
V th Year

14.4

-

18.08

... More
V th Year

616

-

5.49

... More
I st Year

2349

-

4.4

... More
Painting the existing HM & KM stone as per IRC standard and painting culverts for numbering including the cost of Labour charges and material etc., complete

1

-

-

... More
III rd Year

3

-

700

... More
I st Year

15.3

-

70.01

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and lines, grades and cross sections shown in the drawings or as indicated by the Engineer for berms using Side berms using Box Cutting Earth Hire and Labour charges only (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
Road B

187.5

-

168

... More
III rd Year

24

-

18.08

... More
II nd Year

3780

-

4.4

... More
Road B

6.9

-

73383

... More
White washing over the existing Culverts, Parapet, avenue and Guide post including cost of materials and labour charges etc, complete

1

-

-

... More
Road C

666

-

19.13

... More
II nd Year

5

-

700

... More
IV th Year

7

-

700

... More
III rd Year

616

-

5.49

... More
II nd Year

1078

-

5.49

... More
Hoisting and fixing of pipes and collars proper gradient including all labour charges and all other incidental charges etc., complete ((Morth No. 2904,2905,2906)

1

-

-

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
II nd Year

15.3

-

70.01

... More
Road B

3489

-

50.14

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Road C

0.4

-

73383

... More
V th Year

13.2

-

7063.6

... More
Vibrated reinforced cement concrete grade M25 nominal mix using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges compacting, finishing and curing, including all incidental charges etc. complete for deck slab. (Morth No. 10001500 1700 2100 2200)

1

-

-

... More
Road A

52.5

-

29.3

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
V th Year

2156

-

9.14

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
IV th Year

60

-

5.49

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
II nd Year

24

-

18.08

... More
Road C

3.1

-

9214.01

... More
Road C

37.5

-

238

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Making up berms (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
IV th Year

7.9

-

7063.6

... More
V th Year

2.6

-

127.7

... More
III rd Year

2.4

-

127.7

... More
IV th Year

198

-

17.03

... More
III rd Year

15.3

-

70.01

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 10cm

1

-

-

... More
I st Year

12

-

9.14

... More
Road B

1191.6

-

84

... More
IV th Year

770

-

5.49

... More
Road D

43

-

7386.3

... More
Road C

871.5

-

1756.99

... More
Road D

29.3

-

5305.7

... More
Road D

15

-

3700

... More
Road B

512.2

-

1453.61

... More
Road C

170.1

-

6307.18

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material (Morth No. 111, 112, 401, 900)

1

-

-

... More
III rd Year

222

-

103.13

... More
III rd Year

770

-

5.49

... More
Road D

15

-

238

... More
V th Year

6

-

9.14

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works with JCB. (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
Road D

10

-

5499

... More
II nd Year

302

-

103.13

... More
II nd Year

20.8

-

70.01

... More
Road A

2000

-

15.31

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works with JCB. (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
Total Value of Quoted Amount including 12% of GST

1

-

-

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for clearing the vent way of CD works with JCB. (Morth No. 111, 112, 301, 305,900)

1

-

-

... More
II nd Year

11.6

-

70.01

... More
II nd Year

30

-

5.49

... More
IV th Year

6

-

9.14

... More
III rd Year

33.6

-

18.08

... More
V th Year

3

-

700

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 10cm

1

-

-

... More
III rd Year

260

-

103.13

... More
II nd Year

30

-

5.49

... More
IV th Year

6

-

9.14

... More
III rd Year

6

-

9.14

... More
IV th Year

6.9

-

7035.99

... More
I st Year

302

-

103.13

... More
Road B

90

-

9354.33

... More
Supply and fabrication of Steel Grade Fe - 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification ( 16 mm and Below 16mm Dia) (Morth No. 1000, 1500, 1600, 900)

1

-

-

... More
IV th Year

616

-

5.49

... More
Road C

4518.4

-

17.03

... More
Road C

7

-

5243

... More
V th Year

770

-

5.49

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 10cm

1

-

-

... More
I st Year

30

-

5.49

... More
Road B

409.5

-

19.13

... More
Road C

280.3

-

5413.82

... More
Road C

88

-

168

... More
V th Year

260

-

103.13

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and material etc., complete 10cm

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.