Highways Department Tender

... More
The Highways Department has issued a formal invitation for competitive bids for Improvements To Riding Quality Drain And Up Keeping For A Period Of 60 Months To Government Highways Roads In Gudalur Sub Division Jurisdiction Package No 26 in Nilgiris, Tamil Nadu, with an estimated contract value of Rs. 5,27,00,000. The bid opening date for this tender is 30-05-2020 and the last date for bid submission is 01-07-2020. Interested bidders for Highways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Highways Department Tender

Eprocure
Opening Date30 May 2020
Closing Date1 Jul 2020
Tender Amount₹ 5,27,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ii nd Year

30

-

700

... More
Ii nd Year

2.05

-

157.2

... More
II rd Year

3.03

-

157.2

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

99.26

-

141.27

... More
IV th Year

208.3

-

25

... More
V th Year

3824.37

-

6.16

... More
I st Year

6.92

-

157.2

... More
I st Year

103.3

-

25

... More
IV th Year

22.8

-

117.6

... More
IV th Year

12.91

-

9867.62

... More
V th Year

108

-

700

... More
Ii nd Year

38.95

-

117.6

... More
V th Year

90

-

700

... More
Ii nd Year

49.2

-

25

... More
Ii nd Year

108

-

7.28

... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 12% of GST )

-

-

-

... More
I st Year

42

-

700

... More
IV th Year

311.6

-

117.6

... More
ROAD -B

142.55

-

7962.54

... More
V th Year

2

-

12.13

... More
V th Year

86

-

7.28

... More
V th Year

76.3

-

25

... More
Total Value of Quoted Amount including 12% of GST

1

-

-

... More
Ii nd Year

5.84

-

157.2

... More
IV th Year

12.2

-

10040

... More
I st Year

91

-

7.28

... More
I st Year

6

-

12.13

... More
V th Year

6

-

12.13

... More
ROAD A - UPKEEPING

1

-

-

... More
II rd Year

8

-

12.13

... More
I st Year

5.52

-

157.2

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
V th Year

6

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
Ii nd Year

3993.93

-

6.16

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
V th Year

47

-

7.28

... More
ROAD -E

3348.56

-

117.6

... More
IV th Year

92.7

-

6.16

... More
II rd Year

3869.55

-

6.16

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. for Drain (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
IV th Year

5.84

-

157.2

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
ROAD -H

171

-

8015.77

... More
V th Year

32

-

7.28

... More
IV th Year

3993.93

-

6.16

... More
Ii nd Year

118.4

-

25

... More
V th year

508.18

-

21.19

... More
ROAD -F

108.19

-

7962.54

... More
I st Year

86

-

7.28

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
IV th Year

118.4

-

25

... More
Ii nd Year

305.64

-

141.27

... More
V th Year

103.3

-

25

... More
IV th Year

585.4

-

25

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
IV th Year

108

-

7.28

... More
V th Year

7.57

-

9900.45

... More
5-10 CM

1

-

-

... More
I st Year

209.16

-

141.27

... More
II rd Year

5.7

-

117.6

... More
IV th Year

47

-

7.28

... More
I st Year

3824.37

-

6.16

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
I st Year

90

-

700

... More
10-15 CM

1

-

-

... More
ROAD -A

196.75

-

7962.54

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
V th Year

6.92

-

157.2

... More
IV th Year

32

-

7.28

... More
I st Year

1.73

-

157.2

... More
V th Year

372.4

-

117.6

... More
I st Year

3869.55

-

6.16

... More
V th Year

5.84

-

157.2

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. for high berm cutting (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
II rd Year

5.96

-

141.27

... More
II rd Year

91

-

7.28

... More
I st Year

2

-

12.13

... More
II rd Year

355.3

-

117.6

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
Ii nd Year

92.7

-

6.16

... More
ROAD -A

57.29

-

8369.02

... More
I st Year

1791

-

6.16

... More
ROAD F - UPKEEEPING

1

-

-

... More
10-15 CM

1

-

-

... More
II rd Year

103.3

-

25

... More
I st Year

32

-

7.28

... More
V th Year

585.4

-

25

... More
IV th Year

372.4

-

117.6

... More
Ii nd Year

21

-

25

... More
V th Year

54

-

700

... More
Cement Concrete 1:2:4 using 40mm ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges for compacting, finishing and curing including all incidental charges etc., completed for Drain (Morth No. 111, 112, 1000, 1500, 1600, 1700, 2300, 900)

1

-

-

... More
II rd Year

6.92

-

157.2

... More
ROAD -D

36.28

-

7455.92

... More
I st Year

108

-

700

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
IV th Year

5.84

-

157.2

... More
II rd Year

276.84

-

141.27

... More
Ii nd Year

5.96

-

141.27

... More
I st Year

2

-

12.13

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
I st Year

285.98

-

141.27

... More
Ii nd Year

5.7

-

117.6

... More
II rd Year

18

-

700

... More
Ii nd Year

47.5

-

117.6

... More
I st Year

6

-

12.13

... More
10-15 CM

1

-

-

... More
Cement Concrete M20 using 20mm and 12mm HBG graded metal ISS size including cost and conveyance of all materials to worksite but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for compacting curing, including all incidental charges etc., complete for Drain. (Morth No. 111, 112, 1000, 1500, 1600, 1700, 2700, 900)

1

-

-

... More
ROAD -G

66.56

-

7962.54

... More
I st Year

801.9

-

6.16

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
5-10 CM

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
V th Year

12.36

-

9941.13

... More
I st Year

27

-

7.28

... More
ROAD -D

123

-

7962.54

... More
II rd Year

6

-

12.13

... More
IV th Year

305.64

-

141.27

... More
IV th Year

14.43

-

9163.88

... More
5-10 CM

1

-

-

... More
IV th Year

6

-

12.13

... More
ROAD -A

6857.06

-

117.6

... More
Ii nd Year

585.4

-

25

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
IV th Year

276.84

-

141.27

... More
V th Year

2

-

12.13

... More
Ii nd Year

104.4

-

6.16

... More
V th Year

92.7

-

6.16

... More
5-10 CM

1

-

-

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

208.3

-

25

... More
ROAD -B

2851

-

21.19

... More
Ii nd Year

32

-

7.28

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
IV th Year

6

-

12.13

... More
II rd Year

42

-

700

... More
I st Year

6

-

12.13

... More
V th Year

27

-

7.28

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
I st Year

114

-

700

... More
IV th Year

42

-

700

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

5.7

-

117.6

... More
II rd Year

5.84

-

157.2

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

21.51

-

9867.6

... More
ROAD B - UPKEEPING

1

-

-

... More
I st Year

372.4

-

117.6

... More
ROAD -C

7644

-

21.19

... More
V th Year

91

-

7.28

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
ROAD -D

12752

-

20.96

... More
Ii nd Year

18

-

700

... More
II rd Year

108

-

7.28

... More
I st Year

585.4

-

25

... More
10-15 CM

1

-

-

... More
IV th Year

54

-

700

... More
ROAD -C

22.21

-

8062.74

... More
I st Year

3.03

-

157.2

... More
ROAD C - UPKEEPING

1

-

-

... More
IV th Year

49.2

-

25

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
I st Year

76.3

-

25

... More
V th Year

24.06

-

9163.88

... More
IV th Year

7.42

-

9941.13

... More
II rd Year

305.64

-

141.27

... More
IV th Year

30

-

700

... More
II rd Year

32

-

7.28

... More
ROAD E - UPKEEEPING

1

-

-

... More
II rd Year

91

-

7.28

... More
IV th Year

104.4

-

6.16

... More
Ii nd Year

27

-

7.28

... More
I st Year

2

-

12.13

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
Ii nd Year

6

-

12.13

... More
Ii nd Year

285.98

-

141.27

... More
IV th year

536.9

-

21.19

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
II rd Year

30

-

700

... More
II rd Year

104.4

-

6.16

... More
II rd Year

2

-

12.13

... More
Basic cost of value put to tender as per estimate

1

-

47023850

... More
I st Year

21

-

25

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
5-10 CM

1

-

-

... More
Ii nd Year

372.4

-

117.6

... More
I st Year

355.3

-

117.6

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
I st Year

5.96

-

141.27

... More
Ii nd Year

2

-

12.13

... More
I st Year

3993.93

-

6.16

... More
ROAD -E

37.01

-

8176.68

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
V th Year

285.98

-

141.27

... More
10-15 CM

1

-

-

... More
IV th Year

21.48

-

10067.41

... More
IV th year

113.49

-

21.19

... More
I st Year

18

-

700

... More
Ii nd Year

91

-

7.28

... More
Ii nd Year

6

-

12.13

... More
II rd Year

6

-

12.13

... More
Ii nd Year

208.3

-

25

... More
II rd Year

27

-

7.28

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

30

-

700

... More
V th Year

104.4

-

6.16

... More
I st Year

99.26

-

141.27

... More
II rd Year

285.98

-

141.27

... More
V th Year

35.79

-

10067.41

... More
V th Year

42

-

700

... More
IV th Year

27

-

7.28

... More
I st Year

49.2

-

25

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

108

-

7.28

... More
II rd Year

22.8

-

117.6

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, using with a manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II

1

-

-

... More
IV th Year

285.98

-

141.27

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
I st Year

118.4

-

25

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
I st Year

5.84

-

157.2

... More
ROAD -E

475.22

-

9349.25

... More
II rd Year

372.4

-

117.6

... More
IV th Year

209.16

-

141.27

... More
II rd Year

6

-

12.13

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
V th Year

13.74

-

9757.97

... More
IV th Year

355.3

-

117.6

... More
I st Year

38.95

-

117.6

... More
Bituminous Macadam Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7) for patch work. (Morth No. 111, 112, 501, 504, 900, 3004)

1

-

-

... More
IV th Year

3869.55

-

6.16

... More
V th Year

305.64

-

141.27

... More
Ii nd Year

103.3

-

25

... More
Ii nd Year

6.92

-

157.2

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
I st Year

30

-

700

... More
ROAD -A

20021.5

-

21.19

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
IV th year

361.05

-

20.96

... More
Ii nd Year

801.9

-

6.16

... More
ROAD -E

11880.5

-

21.19

... More
5-10 CM

1

-

-

... More
V th year

308.94

-

21.19

... More
V th year

537.71

-

21.19

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
ROAD -F

32.31

-

8349.49

... More
IV th Year

8.24

-

9757.97

... More
Ii nd Year

42

-

700

... More
IV th Year

2

-

12.13

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
I st Year

47.5

-

117.6

... More
V th Year

8

-

12.13

... More
I st Year

2.05

-

157.2

... More
V th Year

5.96

-

141.27

... More
ROAD D - UPKEEPING

1

-

-

... More
V th Year

5.7

-

117.6

... More
Ii nd Year

1791

-

6.16

... More
II rd Year

585.4

-

25

... More
Ii nd Year

54

-

700

... More
II rd Year

47

-

7.28

... More
I st Year

305.64

-

141.27

... More
ROAD -G

20.42

-

8245.64

... More
II rd Year

29.98

-

141.27

... More
II rd Year

208.3

-

25

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
IV th year

185.37

-

21.19

... More
Ii nd Year

209.16

-

141.27

... More
IV th Year

18

-

700

... More
V th year

189.15

-

21.19

... More
Ii nd Year

2

-

12.13

... More
I st Year

208.3

-

25

... More
II rd Year

47.5

-

117.6

... More
IV th Year

8

-

12.13

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
ROAD -E

113.63

-

7962.54

... More
Ii nd Year

86

-

7.28

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
V th Year

5.84

-

157.2

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
Ii nd Year

2

-

12.13

... More
I st Year

29.98

-

141.27

... More
II rd Year

21

-

25

... More
V th Year

108

-

7.28

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
IV th Year

91

-

7.28

... More
V th Year

49.2

-

25

... More
II rd Year

38.95

-

117.6

... More
Ii nd Year

5.52

-

157.2

... More
Ii nd Year

99.26

-

141.27

... More
IV th Year

91

-

7.28

... More
I st Year

311.6

-

117.6

... More
Ii nd Year

3.03

-

157.2

... More
ROAD -C

75.6

-

7962.54

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

18

-

700

... More
ROAD -H

90.8

-

8562.41

... More
II rd Year

99.26

-

141.27

... More
ROAD G

3629.98

-

117.6

... More
ROAD -G

205.89

-

9349.25

... More
IV th Year

1.73

-

157.2

... More
ROAD -F

436.97

-

9349.25

... More
II rd Year

49.2

-

25

... More
II rd Year

92.7

-

6.16

... More
V th Year

118.4

-

25

... More
Ii nd Year

355.3

-

117.6

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
Ii nd Year

76.3

-

25

... More
II rd Year

118.4

-

25

... More
I st Year

22.8

-

117.6

... More
V th Year

276.84

-

141.27

... More
V th Year

91

-

7.28

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
ROAD -D

510.08

-

9349.25

... More
II rd Year

3993.93

-

6.16

... More
II rd Year

5.84

-

157.2

... More
II rd Year

54

-

700

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
I st Year

91

-

7.28

... More
V th Year

311.6

-

117.6

... More
II rd Year

5.52

-

157.2

... More
IV th Year

2

-

12.13

... More
I st Year

8

-

12.13

... More
V th Year

1.73

-

157.2

... More
10-15 CM

1

-

-

... More
V th Year

3869.55

-

6.16

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
V th Year

209.16

-

141.27

... More
IV th Year

90

-

700

... More
V th year

601.77

-

20.96

... More
ROAD -A

800.86

-

9349.25

... More
ROAD -B

7.53

-

8204.22

... More
II rd Year

801.9

-

6.16

... More
Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7). (Morth No. 111, 112, 501, 504, 900)

1

-

-

... More
II rd Year

2

-

12.13

... More
IV th Year

5.52

-

157.2

... More
V th Year

3993.93

-

6.16

... More
I st Year

47

-

7.28

... More
IV th Year

3824.37

-

6.16

... More
Ii nd Year

91

-

7.28

... More
IV th year

304.91

-

21.19

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
Add GST at 12%

1

-

5642862

... More
I st Year

104.4

-

6.16

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Ii nd Year

6

-

12.13

... More
II rd Year

2

-

12.13

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
IV th Year

801.9

-

6.16

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

29.98

-

141.27

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
V th Year

47.5

-

117.6

... More
ROAD -F

6150.56

-

117.6

... More
IV th Year

108

-

700

... More
Ii nd Year

114

-

700

... More
Ii nd Year

5.84

-

157.2

... More
Ii nd Year

276.84

-

141.27

... More
II rd Year

86

-

7.28

... More
V th Year

21

-

25

... More
IV th Year

99.26

-

141.27

... More
V th Year

20.33

-

10040

... More
II rd Year

76.3

-

25

... More
Ii nd Year

22.8

-

117.6

... More
Ii nd Year

90

-

700

... More
V th Year

355.3

-

117.6

... More
V th Year

38.95

-

117.6

... More
Ii nd Year

108

-

700

... More
Ii nd Year

29.98

-

141.27

... More
Up Keeping component Lettering the existing KM & HM stone as per IRC standard including the cost of labour charges and materials etc., complete

1

-

-

... More
IV th Year

2.05

-

157.2

... More
I st Year

276.84

-

141.27

... More
V th year

343.33

-

21.19

... More
IV th year

322.63

-

21.19

... More
II rd Year

108

-

700

... More
II rd Year

2.05

-

157.2

... More
II rd Year

1791

-

6.16

... More
IV th Year

6.92

-

157.2

... More
IV th Year

114

-

700

... More
Ii nd Year

3824.37

-

6.16

... More
II rd Year

1.73

-

157.2

... More
IV th Year

4.54

-

9900.45

... More
Total Value put to Tender

1

-

52666712

... More
IV th Year

1791

-

6.16

... More
IV th Year

103.3

-

25

... More
V th Year

801.9

-

6.16

... More
10-15 CM

1

-

-

... More
IV th Year

5.96

-

141.27

... More
II rd Year

311.6

-

117.6

... More
IV th Year

38.95

-

117.6

... More
IV th Year

21

-

25

... More
II rd Year

3824.37

-

6.16

... More
Ii nd Year

1.73

-

157.2

... More
IV th Year

6

-

12.13

... More
II rd Year

114

-

700

... More
II rd Year

209.16

-

141.27

... More
ROAD -G

6863

-

21.19

... More
Ii nd Year

311.6

-

117.6

... More
V th Year

2.05

-

157.2

... More
V th Year

3.03

-

157.2

... More
I st Year

54

-

700

... More
I st Year

5.84

-

157.2

... More
V th Year

5.52

-

157.2

... More
IV th Year

5.7

-

117.6

... More
IV th Year

47.5

-

117.6

... More
V th Year

22.8

-

117.6

... More
ROAD -C

305.76

-

9349.25

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
Differnce Amount (Excess/less)

1

-

-

... More
ROAD -F

10924.25

-

21.19

... More
ROAD -H

256.5

-

117.6

... More
I st Year

92.7

-

6.16

... More
5-10 CM

1

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using making up berms

1

-

-

... More
UP keeping components of Clearing the Light Jungle as per Sl.no 2 of SOR 2020-21

1

-

-

... More
IV th Year

3.03

-

157.2

... More
V th Year

1791

-

6.16

... More
V th Year

2

-

12.13

... More
IV th Year

76.3

-

25

... More
V th Year

114

-

700

... More
IV th Year

86

-

7.28

... More
V th Year

6

-

12.13

... More
Ii nd Year

3869.55

-

6.16

... More
II rd Year

90

-

700

... More
Ii nd Year

8

-

12.13

... More
Up Keeping components of Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers

1

-

-

... More
IV th Year

2

-

12.13

... More
V th year

894.83

-

21.19

... More
Add GST at 12% of Quoted Amount

1

-

-

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous /granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

1

-

-

... More
ROAD G - UPKEEEPING

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
Ii nd Year

47

-

7.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.