Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Highways Construction And Maintenance Wing Trichy Circle

  • Opening Date

    06 Sep 2019

  • Closing Date

    09 Oct 2019

  • Tender Amount

    ₹ 6,58,30,000

  • EMD

    ₹ 3,40,000

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Package-25, Thanjavur Division Cridp 2019-20

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items
ItemQuantityUnitsRateAmount
... more
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete in accordance with standard specifications as per MORTH Vth Rev. 111, 112, 201 & 202
-- -
... more
Road A
1000Square metre- 12990
... more
Road B
1000Square metre- 12990
... more
Road C
1673Square metre- 21737
... more
Road D
250Square metre- 3247
... more
Road F
206Square metre- 2679
... more
Road G
200Square metre- 2598
... more
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 a) box cutting for widening portion
-- -
... more
Road A
423Cubic metre- 30957
... more
Road B
406Cubic metre- 29678
... more
Road C
765Cubic metre- 55988
... more
Road D
2171Cubic metre- 158755
... more
Road E
2864Cubic metre- 209397
... more
Collection and supply of Carted earth including excavation removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for formation of embankment with 97% Compaction.
-- -
... more
Road E
1490Cubic metre- 294179
... more
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-III as per MORTH Vth Rev., 111, 112, 401 & 900.
-- -
... more
Road D
420Cubic metre- 920294
... more
Road E
278Cubic metre- 609945
... more
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-V as per MORTH Vth Rev., 111, 112, 401 & 900.
-- -
... more
Road A
266Cubic metre- 560137
... more
Road B
266Cubic metre- 563648
... more
Road C
485Cubic metre- 1030327
... more
Road D
555Cubic metre- 1164096
... more
Road E
333Cubic metre- 701293
... more
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 406 & 900
-- -
... more
Road A
762Cubic metre- 1845288
... more
Road B
800Cubic metre- 1936040
... more
Road C
1203Cubic metre- 2913619
... more
Road D
1197Cubic metre- 2898808
... more
Road E
766Cubic metre- 1853927
... more
Road F
61Cubic metre- 149752
... more
Road G
60Cubic metre- 145203
... more
Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 502 & 900
-- -
... more
Road A
4400Square metre- 269324
... more
Road B
4400Square metre- 269280
... more
Road C
7369Square metre- 451017
... more
Road D
4955Square metre- 303320
... more
Road E
2797Square metre- 171241
... more
Road F
618Square metre- 37855
... more
Road G
600Square metre- 36714
... more
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900
-- -
... more
Road A
4400Square metre- 52624
... more
Road B
4400Square metre- 52624
... more
Road C
7369Square metre- 88139
... more
Road D
4955Square metre- 59266
... more
Road E
2797Square metre- 33459
... more
Road F
618Square metre- 7394
... more
Road G
600Square metre- 7170
... more
Advance BT patch work to an average thickness of 45mm IRC size HBG metals with 44kg of (VG10) 80/100 grade bulk bitumen per 1 cum metals including premixing, laying over the existing BT surface and compaction including all labour and other incidental charges etc., completed as per clause 3004-2 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501 & 900.
-- -
... more
Road D
17Cubic metre- 61070
... more
Road E
13Cubic metre- 47906
... more
Road F
23Cubic metre- 80433
... more
Road G
22Cubic metre- 77453
... more
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900
-- -
... more
Road D
8238Square metre- 138480
... more
Road E
5959Square metre- 100179
... more
Road F
4631Square metre- 77851
... more
Road G
4650Square metre- 78166
... more
Providing and laying Dense Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 Grade Bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM (Grade-II ) as per MORTH No. 111, 112, 501, 505 & 900
-- -
... more
Road A
220Cubic metre- 1853187
... more
Road B
220Cubic metre- 1853187
... more
Road C
368Cubic metre- 3101562
... more
Road D
296Cubic metre- 2500708
... more
Road E
167Cubic metre- 1408254
... more
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900
-- -
... more
Road F
52Cubic metre- 379475
... more
Road G
52Cubic metre- 379475
... more
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II
-- -
... more
Road A
132Cubic metre- 1188848
... more
Road B
132Cubic metre- 1188848
... more
Road C
219Cubic metre- 1979703
... more
Road D
395Cubic metre- 3562673
... more
Road E
262Cubic metre- 2366079
... more
Road F
157Cubic metre- 1418512
... more
Road G
157Cubic metre- 1418512
... more
Refilling with excavated earth for filling in layers, not exceeding limits including watering consolidation by power roller rolling including all labour charges and incidental charges etc., complete as directed by the Engineer.as per MORTH Vth Rev., 111, 112, 301, 304, 305, 2907
-- -
... more
Road A
423Cubic metre- 7589
... more
Road B
406Cubic metre- 7275
... more
Road C
765Cubic metre- 13725
... more
Road D
2171Cubic metre- 38917
... more
Road E
2864Cubic metre- 51332
... more
Collection and supply of Gravel including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900
-- -
... more
Road A
240Cubic metre- 162038
... more
Road B
210Cubic metre- 141783
... more
Road C
315Cubic metre- 209364
... more
Road D
110Cubic metre- 73123
... more
Road E
463Cubic metre- 298776
... more
Road F
230Cubic metre- 141455
... more
Road G
232Cubic metre- 131383
... more
Providing RCC M15 grade Precast KM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc., complete (as per MORT & H specification NO.804)
-- -
... more
Road A
1Numbers- 2718
... more
Road B
1Numbers- 2724
... more
Road C
1Numbers- 2725
... more
Road D
2Numbers- 5431
... more
Road E
1Numbers- 2709
... more
Road F
1Numbers- 2708
... more
Road G
2Numbers- 5404
... more
Providing RCC M15 grade Precast HM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc., complete (as per MORT & H specification NO.804)
-- -
... more
Road A
3Numbers- 1980
... more
Road B
4Numbers- 2645
... more
Road C
5Numbers- 3309
... more
Road D
10Numbers- 6596
... more
Road E
7Numbers- 4608
... more
Road F
6Numbers- 3947
... more
Road G
7Numbers- 4596
... more
CULVERTS & RETAINING WALL
-- -
... more
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. a) Dismantling brick masonry/ stone masonry MORTH 111 112 202
-- -
... more
Road C
48Cubic metre- 8198
... more
Road D
32Cubic metre- 5429
... more
Road E
44Cubic metre- 7408
... more
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for FOUNDATION
-- -
... more
Road C
95Cubic metre- 14026
... more
Road D
55Cubic metre- 8118
... more
Road E ( 125.28+84.00)
209Cubic metre- 30596
... more
Vibrated Cement Concrete M 15 Nominal mix using 40mm ISS size hard broken granite metal and using M- Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Below sill Level as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
-- -
... more
Road C
8Cubic metre- 50922
... more
Road D
19Cubic metre- 119592
... more
Road E
26Cubic metre- 148140
... more
Vibrated Cement Concrete M 20 grade mix (Nominal mix) using 40mm HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Foundation of Retaining wall (below sill level) as per MORTH Vth Rev., 1000, 1500, 1700, 2100
-- -
... more
Road C
28Cubic metre- 181895
... more
Road E
16Cubic metre- 96247
... more
Vibrated Cement Concrete M 20 Nominal mix using 40mm ISS size hard broken granite metal and using M- Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Body wall of culverts and Retaining wall Above sill Level as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
-- -
... more
Road C
52Cubic metre- 393314
... more
Road D
28Cubic metre- 211342
... more
Road E
160Cubic metre- 1181848
... more
Vibrated reinforced cement concrete design mix M25 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M-Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for BASE SLAB, STEM AND TOP SLAB OF Box culvert
-- -
... more
Road C
132Cubic metre- 1233021
... more
Road D
71Cubic metre- 673986
... more
Road E
119Cubic metre- 1145265
... more
Providing and fixing seepage pipes of 110 mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900mm dia semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill -1 No.
-- -
... more
Road E
80Numbers- 16000
... more
Supply and fabrication of (HYSD) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900
-- -
... more
Road C
10Metric Tonne- 737616
... more
Road D
5Metric Tonne- 398145
... more
Road E
6Metric Tonne- 477774
... more
Vibrated cement concrete M30 (Design mix) using 25mm, 12mm and 6mm ISS sized hard granite metal and using M- Sand including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB.
-- -
... more
Road C
91Square metre- 51363
... more
Road D
55Square metre- 30582
... more
Road E
70Square metre- 38677
... more
Vibrated reinforced cement concrete M40 (Design mix) using crushed ISS, hard broken granite graded metal 20mm and below including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting curing, including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for CRASH BARRIER.
-- -
... more
Road C
20Running metre- 66538
... more
Filling with clean good gritty gravel including cost and conveyance of materials to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete and as directed by the departmental officers for filling around the pipe as per MORTH Vth Rev., 305 & 2907
-- -
... more
Road E ( 11.20+ 112.50 )
123Cubic metre- 78921
... more
Quarry Dust Filling around the pipes in between the body wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev., 2907 For Pipe Culvert
-- -
... more
Road C
52Cubic metre- 32496
... more
Road D
33Cubic metre- 20309
... more
Road E
52Cubic metre- 30972
... more
Collection and supply of Carted earth including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for Diversion Road in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900
-- -
... more
Road C
375Cubic metre- 74171
... more
Road D
578Cubic metre- 114198
... more
Road E (16.80+394.50)
411Cubic metre- 81178
... more
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for Pipe culvert and diversion
-- -
... more
Road C
15Running metre- 55500
... more
Road D
7Running metre- 27750
... more
Road E
22Running metre- 83250
... more
Laying and fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 2905, 2906 & 900
-- -
... more
Road C
15Running metre- 2955
... more
Road D
7Running metre- 1477
... more
Road E
22Running metre- 4432
... more
Upkeeping Component
-- -
... more
Collection and supply of US gravel including cost and conveyance to worksite and stacking them into road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms. as per MORTH Vth Rev., 111, 112, 401, 408, 900 ( Twice times per year)
-- -
... more
Second Year
-- -
... more
Road A
101Cubic metre- 58719
... more
Road B
86Cubic metre- 49998
... more
Road C
205Cubic metre- 117737
... more
Road D
355Cubic metre- 203887
... more
Road E
154Cubic metre- 86203
... more
Road F
167Cubic metre- 88456
... more
Road G
176Cubic metre- 86852
... more
Third Year
-- -
... more
Road A
101Cubic metre- 58719
... more
Road B
86Cubic metre- 49998
... more
Road C
205Cubic metre- 117737
... more
Road D
355Cubic metre- 203887
... more
Road E
154Cubic metre- 86203
... more
Road F
167Cubic metre- 88456
... more
Road G
176Cubic metre- 86852
... more
Fourth Year
-- -
... more
Road A
101Cubic metre- 58719
... more
Road B
86Cubic metre- 49998
... more
Road C
205Cubic metre- 117737
... more
Road D
355Cubic metre- 203887
... more
Road E
154Cubic metre- 86203
... more
Road F
167Cubic metre- 88456
... more
Road G
176Cubic metre- 86852
... more
Fifth Year
-- -
... more
Road A
101Cubic metre- 58719
... more
Road B
86Cubic metre- 49998
... more
Road C
205Cubic metre- 117737
... more
Road D
355Cubic metre- 203887
... more
Road E
154Cubic metre- 86203
... more
Road F
167Cubic metre- 88456
... more
Road G
176Cubic metre- 86852
... more
Clearing the Light jungles including weeding out shrubs bushes, vegetables, growth etc,as per spcifications and directions of Engineer in charge.
-- -
... more
First Year
-- -
... more
Road A
1212Square metre- 4726
... more
Road B
1290Square metre- 5031
... more
Road C
3075Square metre- 11992
... more
Road D
5325Square metre- 20767
... more
Road E
2310Square metre- 9009
... more
Road F
2505Square metre- 9769
... more
Road G
2647Square metre- 10325
... more
Second Year
-- -
... more
Road A
1212Square metre- 4726
... more
Road B
1290Square metre- 5031
... more
Road C
3075Square metre- 11992
... more
Road D
5325Square metre- 20767
... more
Road E
2310Square metre- 9009
... more
Road F
2505Square metre- 9769
... more
Road G
2647Square metre- 10325
... more
Third Year
-- -
... more
Road A
1212Square metre- 4726
... more
Road B
1290Square metre- 5031
... more
Road C
3075Square metre- 11992
... more
Road D
5325Square metre- 20767
... more
Road E
2310Square metre- 9009
... more
Road F
2505Square metre- 9769
... more
Road G
2647Square metre- 10325
... more
Fourth Year
-- -
... more
Road A
1212Square metre- 4726
... more
Road B
1290Square metre- 5031
... more
Road C
3075Square metre- 11992
... more
Road D
5325Square metre- 20767
... more
Road E
2310Square metre- 9009
... more
Road F
2505Square metre- 9769
... more
Road G
2647Square metre- 10325
... more
Fifth Year
-- -
... more
Road A
1212Square metre- 4726
... more
Road B
1290Square metre- 5031
... more
Road C
3075Square metre- 11992
... more
Road D
5325Square metre- 20767
... more
Road E
2310Square metre- 9009
... more
Road F
2505Square metre- 9769
... more
Road G
2647Square metre- 10325
... more
Provision for engaging JCB for Clearing the vent way of CD works, and minor Bridges, clearing storm water drains and removing debris along roadside during urgent periods.
-- -
... more
First Year
-- -
... more
Road A
2Hour- 1400
... more
Road B
2Hour- 1400
... more
Road C
6Hour- 4200
... more
Road D
2Hour- 1400
... more
Road E
10Hour- 7000
... more
Road F
8Hour- 5600
... more
Road G
8Hour- 5600
... more
Second Year
-- -
... more
Road A
2Hour- 1400
... more
Road B
2Hour- 1400
... more
Road C
6Hour- 4200
... more
Road D
2Hour- 1400
... more
Road E
10Hour- 7000
... more
Road F
8Hour- 5600
... more
Road G
8Hour- 5600
... more
Third Year
-- -
... more
Road A
2Hour- 1400
... more
Road B
2Hour- 1400
... more
Road C
6Hour- 4200
... more
Road D
2Hour- 1400
... more
Road E
10Hour- 7000
... more
Road F
8Hour- 5600
... more
Road G
8Hour- 5600
... more
Fourth Year
-- -
... more
Road A
2Hour- 1400
... more
Road B
2Hour- 1400
... more
Road C
6Hour- 4200
... more
Road D
2Hour- 1400
... more
Road E
10Hour- 7000
... more
Road F
8Hour- 5600
... more
Road G
8Hour- 5600
... more
Fifth Year
-- -
... more
Road A
2Hour- 1400
... more
Road B
2Hour- 1400
... more
Road C
6Hour- 4200
... more
Road D
2Hour- 1400
... more
Road E
10Hour- 7000
... more
Road F
8Hour- 5600
... more
Road G
8Hour- 5600
... more
Painting with Plastic Enamel paint over the existing boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, cautionary board and Sign board etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
-- -
... more
First Year
-- -
... more
Road A
-Square metre- 153
... more
Road B
-Square metre- 156
... more
Road C
2Square metre- 352
... more
Road D
1Square metre- 292
... more
Road E
4Square metre- 711
... more
Road F
2Square metre- 463
... more
Road G
2Square metre- 463
... more
Second Year
-- -
... more
Road A
3Square metre- 494
... more
Road B
3Square metre- 554
... more
Road C
5Square metre- 864
... more
Road D
7Square metre- 1203
... more
Road E
8Square metre- 1280
... more
Road F
6Square metre- 975
... more
Road G
7Square metre- 1203
... more
Third Year
-- -
... more
Road A
3Square metre- 494
... more
Road B
3Square metre- 554
... more
Road C
5Square metre- 864
... more
Road D
7Square metre- 1203
... more
Road E
8Square metre- 1280
... more
Road F
6Square metre- 975
... more
Road G
7Square metre- 1203
... more
Fourth Year
-- -
... more
Road A
3Square metre- 494
... more
Road B
3Square metre- 554
... more
Road C
5Square metre- 864
... more
Road D
7Square metre- 1203
... more
Road E
8Square metre- 1280
... more
Road F
6Square metre- 975
... more
Road G
7Square metre- 1203
... more
Fifth Year
-- -
... more
Road A
3Square metre- 494
... more
Road B
3Square metre- 554
... more
Road C
5Square metre- 864
... more
Road D
7Square metre- 1203
... more
Road E
8Square metre- 1280
... more
Road F
6Square metre- 975
... more
Road G
7Square metre- 1203
... more
White washing over the existing Culverts, Parapet and minor bridge including cost of materials and labour charges etc, complete.
-- -
... more
First Year
-- -
... more
Road A
23Square metre- 525
... more
Road B
26Square metre- 607
... more
Road C
45Square metre- 1033
... more
Road D
88Square metre- 2011
... more
Road E
94Square metre- 2156
... more
Road F
44Square metre- 1022
... more
Road G
47Square metre- 1073
... more
Second Year
-- -
... more
Road A
23Square metre- 525
... more
Road B
26Square metre- 607
... more
Road C
45Square metre- 1033
... more
Road D
88Square metre- 2011
... more
Road E
94Square metre- 2156
... more
Road F
44Square metre- 1022
... more
Road G
47Square metre- 1073
... more
Third Year
-- -
... more
Road A
23Square metre- 525
... more
Road B
26Square metre- 607
... more
Road C
45Square metre- 1033
... more
Road D
88Square metre- 2011
... more
Road E
94Square metre- 2156
... more
Road F
44Square metre- 1022
... more
Road G
47Square metre- 1073
... more
Fourth Year
-- -
... more
Road A
23Square metre- 525
... more
Road B
26Square metre- 607
... more
Road C
45Square metre- 1033
... more
Road D
88Square metre- 2011
... more
Road E
94Square metre- 2156
... more
Road F
44Square metre- 1022
... more
Road G
47Square metre- 1073
... more
Fifth Year
-- -
... more
Road A
23Square metre- 525
... more
Road B
26Square metre- 607
... more
Road C
45Square metre- 1033
... more
Road D
88Square metre- 2011
... more
Road E
94Square metre- 2156
... more
Road F
44Square metre- 1022
... more
Road G
47Square metre- 1073
... more
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers
-- -
... more
First Year
-- -
... more
Road A
7Square metre- 989
... more
Road B
9Square metre- 1251
... more
Road C
8Square metre- 1117
... more
Road D
39Square metre- 5313
... more
Road E
26Square metre- 3542
... more
Road F
5Square metre- 750
... more
Road G
6Square metre- 903
... more
Second Year
-- -
... more
Road A
7Square metre- 989
... more
Road B
9Square metre- 1251
... more
Road C
8Square metre- 1117
... more
Road D
39Square metre- 5313
... more
Road E
26Square metre- 3542
... more
Road F
5Square metre- 750
... more
Road G
6Square metre- 903
... more
Third Year
-- -
... more
Road A
7Square metre- 989
... more
Road B
9Square metre- 1251
... more
Road C
8Square metre- 1117
... more
Road D
39Square metre- 5313
... more
Road E
26Square metre- 3542
... more
Road F
5Square metre- 750
... more
Road G
6Square metre- 903
... more
Fourth Year
-- -
... more
Road A
7Square metre- 989
... more
Road B
9Square metre- 1251
... more
Road C
8Square metre- 1117
... more
Road D
39Square metre- 5313
... more
Road E
26Square metre- 3542
... more
Road F
5Square metre- 750
... more
Road G
6Square metre- 903
... more
Fifth Year
-- -
... more
Road A
7Square metre- 989
... more
Road B
9Square metre- 1251
... more
Road C
8Square metre- 1117
... more
Road D
39Square metre- 5313
... more
Road E
26Square metre- 3542
... more
Road F
5Square metre- 750
... more
Road G
6Square metre- 903
... more
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10cm
-- -
... more
First Year
-- -
... more
Road A
95Numbers- 579
... more
Road B
96Numbers- 585
... more
Road C
255Numbers- 1555
... more
Road D
134Numbers- 817
... more
Road E
460Numbers- 2806
... more
Road F
338Numbers- 2061
... more
Road G
338Numbers- 2061
... more
Second Year
-- -
... more
Road A
137Numbers- 835
... more
Road B
142Numbers- 866
... more
Road C
309Numbers- 1884
... more
Road D
234Numbers- 1427
... more
Road E
518Numbers- 3159
... more
Road F
392Numbers- 2391
... more
Road G
426Numbers- 2598
... more
Third Year
-- -
... more
Road A
137Numbers- 835
... more
Road B
142Numbers- 866
... more
Road C
309Numbers- 1884
... more
Road D
234Numbers- 1427
... more
Road E
518Numbers- 3159
... more
Road F
392Numbers- 2391
... more
Road G
426Numbers- 2598
... more
Fourth Year
-- -
... more
Road A
137Numbers- 835
... more
Road B
142Numbers- 866
... more
Road C
309Numbers- 1884
... more
Road D
234Numbers- 1427
... more
Road E
518Numbers- 3159
... more
Road F
392Numbers- 2391
... more
Road G
426Numbers- 2598
... more
Fifth Year
-- -
... more
Road A
137Numbers- 835
... more
Road B
142Numbers- 866
... more
Road C
309Numbers- 1884
... more
Road D
234Numbers- 1427
... more
Road E
518Numbers- 3159
... more
Road F
392Numbers- 2391
... more
Road G
426Numbers- 2598
... more
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15cm
-- -
... more
First Year
-- -
... more
Road A
8Numbers- 73
... more
Road B
8Numbers- 73
... more
Road C
24Numbers- 219
... more
Road D
8Numbers- 73
... more
Road E
40Numbers- 366
... more
Road F
32Numbers- 292
... more
Road G
32Numbers- 292
... more
Second Year
-- -
... more
Road A
24Numbers- 219
... more
Road B
26Numbers- 237
... more
Road C
46Numbers- 420
... more
Road D
48Numbers- 439
... more
Road E
64Numbers- 585
... more
Road F
54Numbers- 494
... more
Road G
66Numbers- 603
... more
Third Year
-- -
... more
Road A
24Numbers- 219
... more
Road B
26Numbers- 237
... more
Road C
46Numbers- 420
... more
Road D
48Numbers- 439
... more
Road E
64Numbers- 585
... more
Road F
54Numbers- 494
... more
Road G
66Numbers- 603
... more
Fourth Year
-- -
... more
Road A
24Numbers- 219
... more
Road B
26Numbers- 237
... more
Road C
46Numbers- 420
... more
Road D
48Numbers- 439
... more
Road E
64Numbers- 585
... more
Road F
54Numbers- 494
... more
Road G
66Numbers- 603
... more
Fifth Year
-- -
... more
Road A
24Numbers- 219
... more
Road B
26Numbers- 237
... more
Road C
46Numbers- 420
... more
Road D
48Numbers- 439
... more
Road E
64Numbers- 585
... more
Road F
54Numbers- 494
... more
Road G
66Numbers- 603
... more
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces
-- -
... more
Fourth Year
-- -
... more
Road A
90Square metre- 1512
... more
Road B
90Square metre- 1512
... more
Road C
157Square metre- 2647
... more
Road D
219Square metre- 3687
... more
Road E
180Square metre- 3025
... more
Road F
157Square metre- 2647
... more
Road G
157Square metre- 2647
... more
Fifth Year
-- -
... more
Road A
150Square metre- 2521
... more
Road B
150Square metre- 2521
... more
Road C
262Square metre- 4412
... more
Road D
365Square metre- 6146
... more
Road E
300Square metre- 5043
... more
Road F
262Square metre- 4412
... more
Road G
262Square metre- 4412
... more
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II
-- -
... more
Fourth Year
-- -
... more
Road A
2Cubic metre- 24317
... more
Road B
2Cubic metre- 24317
... more
Road C
4Cubic metre- 42555
... more
Road D
6Cubic metre- 59262
... more
Road E
5Cubic metre- 48634
... more
Road F
4Cubic metre- 42555
... more
Road G
4Cubic metre- 42600
... more
Fifth Year
-- -
... more
Road A
4Cubic metre- 40528
... more
Road B
4Cubic metre- 40528
... more
Road C
7Cubic metre- 70925
... more
Road D
10Cubic metre- 98800
... more
Road E
9Cubic metre- 81057
... more
Road F
7Cubic metre- 70925
... more
Road G
7Cubic metre- 70970
... more
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-- -
... more
Basic cost of value put to tender as per estimate
1(A)- -
... more
Add GST at 12%
1(B)- -
... more
Total Value put to Tender
1(A+B)- -
... more
Negotiated Percentage
1(D)- -
... more
Final Negotiated Value
1(E)- -
... more
Add GST at 12% of Final Negotiated Value
1(F)- -
... more
Total Value of Contract Including 12% of GST
1(E+F)- -
... more
Basic cost of value put to tender as per Estimate
-- 58770700
... more
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )
-Select- -

Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.