Directorate Of Town Panchayats Tender
... More
The Directorate Of Town Panchayats has issued a formal invitation for competitive bids for Sfc 2024-2025 Strengthening Of Bt Road At Mullainagar, Annamalai Nagar, Pwd Office Road In Veerapandi Town Panchayat in Theni, Tamil Nadu, with an estimated contract value of Rs. 89,17,684. The bid opening date for this tender is 14-08-2024 and the last date for bid submission is 28-08-2024. Interested bidders for Directorate Of Town Panchayats tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Directorate Of Town Panchayats Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 89,17,684.25 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,08,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Sfc 2024-2025 Strengthening Of Bt Road At Mullainagar, Annamalai Nagar, Pwd Office Road In Veerapandi Town Panchayat
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DTP_473077_1Bid Award Id
ViewTender No
221/2024Tender Authority
Directorate Of Town Panchayats ViewPurchaser Address
-Website
http://https://www.tn.gov.in/dtp/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification
7975
-
-
... More
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 49.27 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen 503 sharand Plastic and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
239.5
-
-
... More
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
399
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements