Corporation Of Chennai Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Corporation Of Chennai Tender
Civil Works Roads
Eprocure
Opening Date26 Nov 2019
Closing Date5 Dec 2019
Tender Amount₹ 43,62,000
Costs
EMD
₹ 43,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CoC_149036_1Bid Award Id
ViewTender No
Z.O.III.C.NO.E1/5748/2019Tender Authority
Corporation Of Chennai ViewPurchaser Address
-Website
http://http://www.chennaicorporation.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing Prime Coat 7Kg/10 m2 with Bitumen Emulsion (slow setting) including cost of bitumen at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Prime Coat using bitumen sprayer etc., complete over wet Mix Macadam as per clause 502 of MORT and H specifications.
2970
-
538.6
... More
Providing Tack Coat 2.0 kg/10 m2 with Bitumen Emulsion (Rapid Setting - 1) including cost of bitumen at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over primed surface as per clause 503 of MoRT and H Specifications.
2970
-
107.7
... More
Providing and laying 50mm consolidated thick bituminous macadamusing 0.20 Cu.m of 26.50 to 13.20 metal, 0.43 Cu.m of 13.20 to 2.36 mm and 0.08 Cu.m of 2.36 mm and below size IRC metal with 37 kgs ofVG30 (60/70 grade) bitumen for premixing per 10sq.m including costand conveyance of all materials to CMP site, heating the bitumen andaggregate to required temperature and mixing them in requiredtemperature in central hot mix plant 20-30 ton capacity, conveying themix by tipper trucks to work site, spreading the mix to uniformthickness of 50mm with mechanical paver to the specified grades andcross sections and consolidated by 8-10 tonne Vibratory Roller to therequired density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 tonne CMP withbitumen boiler, tipper trucks, Paver finisher, vibratory roller and allother tools and plant required, including fuel and all other incidentalcharges etc., complete as per specification using CMP as per clause504 of MORTH Rev-5
2970
-
3191.3
... More
Providing and laying Bituminous Concrete 40mm thick using 0.13Cu.m of 19.00-9.50mm,0.17 Cu.m of 9.5-2.36 mm Metal, and 0.26 Cu.m of 2.36 mm and below Metal of specified grading aggregates and0.012 Cu.m of Quarry Dust with 50.3 kg of VG30 (60/70 grade)bitumen for premixing per 10sq.m including cost and conveyance of allmaterials to CMP site, heating the bitumen and aggregate to requiredtemperature and mixing them in required temperature in central hot mixplant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 40mm with 9m paverfinisher to the specified grades and cross sections and consolidatedaby 8-10 tone Pneumatic Roller to the required density etc., includinglabour for attending to paver to site etc.m including hire charges andfuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks,9m paver finisher, Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., completeas per specification using CMP as per clause 507 of MORTH Rev-5
2970
-
2789
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements