Chennai Port Trust Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Port Trust - CPT Tender

Works
Civil And Construction
Eprocure
Opening Date11 Jan 2019
Closing Date31 Jan 2019
Tender Amount₹ 47,85,776 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
4. Dismantling the existing plain cement concrete above / below ground level in rich mix in the railway track / crossing wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m for disposal including loading, transporting and disposing the debris inside port premises all as directed including all labour, tools, tackles, equipments, plants, transport, fuel etc., complete

51

-

-

... More
5. Dismantling the existing B.G. Tracks with wooden / RCC/ PSC sleepers including conveying and stocking the removed materials in the nearest location as directed at site of work including removing all fittings and fixtures and handing over the serviceable materials to Department stores / unserviceable materials to RSO yard within a lead of 2Kms. Including all labour, tools, equipments, transport, fuel, etc., complete

43

-

-

... More
6. Providing and laying Plain Cement Concrete of mix 1:4:8 (1 Cement: 4 CS Sand: 8 hard granite graded stone aggregate of 40 mm nominal size conforming to IS383 -2016) in volumetric proportions for leveling course in track portion and wherever required as per relevant specification, drawing and as directed including mixing. transporting, placing, ramming, consolidating, shuttering, if any, curing etc., including all materials, cement, labour, formwork, tools, plants, equipments, fuel, etc. complete

16

-

-

... More
7. Providing and laying Plain Cement Concrete of mix 1:1.5:3 (1 Cement: 1.5 CS sand: 3 hard granite graded stone aggregate of 20 mm in volumetric proportions for track portion wherever required as per relevant specification, drawing and as directed including mixing, transporting, placing, ramming, vibrating, shuttering, if any, curing etc., including all materials, cement, labour, formwork, tools, plants, equipments, fuel, etc. complete.

47

-

-

... More
8. Lifting, packing and slewing the existing B.G railway track to the required level and alignment including packing the stone ballast sectioning fixing the sleepers with accessories as directed at site of work including all labour, tools, equipments etc., complete

700

-

-

... More
9. Renewal of 52/60 Kg Fractured Rail / wourn out rail at single side of the Railway track including clearing the earth, debris etc., removing and refixing the elastic rail cleat, Liner, Bottom Pad, etc., and conveying, cutting and fixing the rails with necessary holes wherever required as directed at site of work including all labour, tools, gas, equipments, etc., complete. Note: Rail, Fish plates, Bolts & nuts and washers will be issued free of cost by the Trust

1400

-

-

... More
10. Conveying and renewal of 60 Kg PSC sleepers after removing the existing RCC / 52kg / 60kg PSC / wooden damaged sleepers in railway tracks wherever required and laying of 60 Kg sleeper and also adjusting the existing PSC sleepers in rail joints if required, and packing under and on the sides of sleepers and as directed at site of work including conveying and stacking the removed/damaged sleepers at Dept yard / RSD yard within 2 km lead including all labour, tools, equipments, transport, etc., complete Note: PSC sleepers and accessories will be issued free of cost by the Trust

700

-

-

... More
11. Preparing the surfaces of the new/old 52 / 60 Kg rails and painting (as per IRPWM) with one coat of zinc chromate red oxide primer and two coats of Anticorrosive bitumastic paint to a dry film thickness of 350 microns (each coat of 175 microns) as directed at site including all labour, materials, brushes, tools, etc., complete.

860

-

-

... More
12(a). Loading, transporting, dumping and leveling the surplus earth within a lead of 2 Kms. all as directed at site of work including all labour, tools, transport, fuel etc., complete Note: 1. The tenderer shall maintain trip sheets in triplicate in Trust's approved format at his own cost. 2. Payment will be based on the lorry cubical content. 3. 20% voids shall be deducted for earth..

640

-

-

... More
12(b) Loading, transporting, dumping and leveling the debris within a lead of 2 Kms. all as directed at site of work including all labour, tools, transport, fuel etc., complete Note: 1. The tenderer shall maintain trip sheets in triplicate in Trust's approved format at his own cost. 2. Payment will be based on the lorry cubical content and the total quantity will be restricted to actual quantity of dismantling work.

51

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.