Chennai Port Trust Tender

... More
The CPT has issued a formal invitation for competitive bids for the Chennai Port Trust project, for Tender For Rectification / Renovation Of M1 And M2 Ware Houses For Facilitating Stocking Of Dry Bulk/cargo In Southern Division in Chennai, Tamil Nadu. The bid opening date for this tender is 16-07-2021 and the last date for bid submission is 05-08-2021. Interested bidders for Chennai Port Trust tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Chennai Port Trust - CPT Tender

Works
Eprocure
Opening Date16 Jul 2021
Closing Date5 Aug 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
24.Cleaning deposited dust /silt/ tree leaves and other foreign materials from the gutters running through the M1 and M2 ware houses and making the gutters free from obstructions for easy flow of rain water including all labour, scaffolding, materials equipments transport fuel etc., complete.

180

-

-

... More
1.Dismantling and removing the existing damaged Wooden/PVC/FRP doors of area less than 3M2 including main frame with shutters and MS hold fast if any, by cutting the masonry/concrete wherever required without any damages to the structure, transporting and handing over the serviceable materials to the departmental stores/RSD yard and stacking the debris if any, at ground level within a lead of 50m for retransportation and disposal, all as per relevant specification and as directed including all labour, tools, equipment, transport, fuel, etc., complete.

5

-

-

... More
7.Dismantling and removing the existing damaged Rolling shutter/Sliding door of size 3.75M X4.50M (approx) in M1 and M2 ware house including hood cover/accessories without damaging the structures nearby, transporting and handing over to departmental stores / RSO yard within port premises all as specified and as directed at site of work including all labour, tools, equipments, transport, fuel etc., complete.

8

-

-

... More
15.Preparing the surfaces of Column and Beam and plastering in cement mortar 1:3 (1cement :3 crushed stone sand), 20mm thick to the required finish, curing all as per relevant specification and as directed at site, including all materials, labour, tools, equipment, Scaffolding, etc., complete.

30

-

-

... More
6.Dismantling and removing the existing damaged cupboard arrangements of Size 20.00mx0.70mx1.20m (approx) at M1ware house and including removing of wooden shutters and frames, brick work with Cement Mortar,R.C.C slab, and accessories, etc., without damaging the structures nearby, transporting and handing over the serviceable materials to the departmental stores/RSD yard and stacking the debris if any, at ground level within a lead of 50m for retransportation and disposal, all as per relevant specification and as directed including all labour, tools, equipment, transport, fuel, etc., complete.

4

-

-

... More
13.Providing Brick Work using bricks of class designation 50 in C.M1:5 (1 cement : 5 crushed stone sand) for superstructure (upto Ist floor level) and wherever required, all as per relevant specifications and as directed at site, including scaffolding, curing, all materials, labour, tools, equipments, transport, fuel, etc., complete.

19.25

-

-

... More
27.(b)..Loading, transporting, dumping and levelling the debris within a lead of 2 Kms all as directed at site of work including all labour, materials, tools, tackles, equipments, transport, fuel, etc., complete. Note : 1) No deduction of voids for debris. 2. The tenderer shall maintain trip sheets in triplicate in trust's approved format at his own cost. 3.. Payment will be based on the lorry cubical contents.

79

-

-

... More
16.Preparing the surfaces of wall and plastering in cement mortar 1:5 (1cement :5 crushed stone sand), 12mm thick to the required finish, curing all as per relevant specification and as directed at site, including all materials, labour, tools, equipment, Scaffolding, etc., complete.

167

-

-

... More
12.Providing and laying Plain cement concrete of mix 1:1½:3 (1Cement: 1½ crushed stone sand : 3 hard granite graded stone aggregate of 20mm nominal size) in volumetric proportions for pedestal,Ramp,floor etc., and wherever required all as per relevant specifications, and as directed at site of work including centering, shuttering, scaffolding, mixing, transporting, placing, vibrating, finishing, curing including all materials, labour, tools, equipments, fuel etc., complete.

28

-

-

... More
21.Preparing the surfaces of floor and plastering in cement mortar 1:3 (1cement :3 crushed stone sand), 20mm thick to the required finish, curing all as per relevant specification and as directed at site, including all materials, labour, tools, equipment etc., complete.

41

-

-

... More
2.Dismantling and removing the existing damaged Wooden/PVC/FRP windows of area less than 3M2 including main frame with shutters and MS hold fast if any, by cutting the masonry/concrete wherever required without any damages to the structure, transporting and handing over the serviceable materials to the departmental stores/RSD yard and stacking the debris if any, at ground level within a lead of 50m for retransportation and disposal, all as per relevant specification and as directed including all labour, tools, equipment, transport, fuel, etc., complete.

16

-

-

... More
19.Supplying, fabricating and fixing MS frames using MS angle of Size 75x75x6mm or nearest size as available in the market to suit the site condition for galvalume sunshade roofing and fixing on wall with suitable fasteners/Screws, wherever required, and painting with two coats of synthetic enamel paint over a coat of red oxide primer, all as directed at site of work, including all labour, material, scaffolding, transporting, tools, welding, gascutter, equipments, fuel, etc., complete.

150

-

-

... More
5.Cutting and removing the existing Reinforced cement concrete as existing at site of work and wherever required to the required size and level without damaging the nearby structures, including depositing the dismantled debris within a lead of 50m for re-transportation and disposal, including removing the reinforcement steel from the structures wherever possible and handing over the retrieved materials such as reinforcement steel etc., to the departmental stores/RSD yard within the Port premises including all labour, tools, tackles, equipment, plants, transport, fuel, Gas cutter etc., complete.

15

-

-

... More
4.Dismantling the existing Plain Cement Concrete in Rich mix to the required level, size and shape wherever required without damaging the nearby structures and making good the disturbed portions if any, and depositing the debris within a lead of 50m for re-transportation and disposal all as per relevant specification and all as directed at site including all labour, tools, tackles, equipment, fuel, transport, etc. complete

10

-

-

... More
17.Repairing and servicing the inoperative Mild Steel sliding door of Size 3.75mX4.5M (approx) (Mild Steel required approximately 100kg each door) and making in good working condition by cutting welding and replacing the components like angle, sheet, wheel,moving rail and fixing good working condition all as directed at site of work including all labour, materials, tools, scaffolding, crane etc., complete.

13

-

-

... More
27.(a). Loading, transporting, dumping and levelling the surplus earth within a lead of 2Kms all as directed at site of work including all labour, materials, tools, tackles, equipments, transport, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Trust’s approved format at his own cost for the quantity of earth transported. 2. Payment will be based on the lorry cubical contents. 3. 20% voids shall be deducted for earth.

45

-

-

... More
10.Earth work excavation in ordinary soil, sand, clay mixed with roots, boulders weighing individually less than 250 Kg, debris, rubbish etc., as existing at site of work for ramp and other such works up to 1.50m depth including dressing of sides ramming of bottom all as per relevant specification, and as directed at site, depositing the excavated earth within a lead of 50m for transportation/refilling including shoring, strutting, all labour, tools, tackles, equipments, fuel etc., complete.

40

-

-

... More
25.Preparing the surfaces of existing Steel members and painting with two coats of synthetic enamel paint (Asian/Berger/Dulux or equivalent) of approved colour to give an even shade and finish all as directed including all labour, materials, tools, tackles, equipments, brushes, scaffolding, etc., complete. NOTE:1. Necessary painting co-efficient shall be allowed as per Ch.P.T. engineering manual. 2.The above quantity is inclusive of painting co-efficient

476

-

-

... More
3.Dismantling the existing brickwork in Cement Mortar to the required height wherever required without damaging the nearby structures including collecting and depositing the debris within a lead of 50m for re-transportation and disposal all as per relevant specification and as directed at site of work including all labour, tools, tackles, equipments, transport, fuel etc.,complete.

54

-

-

... More
8.Supplying of Mazdoor Class-I Labour for cutting of tree branches producing over the M1 and M2 Ware houses roofing/entry and cleaning the bushes where ever required all as specified and directed at site of work including all labour, tools, equipments, safety ladder, scaffolding etc., complete

15

-

-

... More
23.Supplying and fixing self adhesive SBS water proof membrane of 1.50mm thick or nearest size as available in the market and fixing in position over the AC Corrugated sheet roof repaired portion and finishing the surfaces of felt with necessary binder wherever required without damaging the nearby area all as specified and as directed at site of work including all materials, labour, tools, scaffolding, equipment, transport, fuel etc., complete.

35

-

-

... More
14.Preparing the surfaces of wall and plastering in cement mortar 1:4 (1cement :4crushed stone sand), 12 to20mm varying thickness in patches to the required finish, curing all as per relevant specification and as directed at site, including all materials, labour, tools, equipment, Scaffolding, etc., complete.

145

-

-

... More
9.Removing the existing damaged AC sheet roofing and Providing of New Asbestos cement. Corrugated roofing sheets 6mm thick or nearest size as available in the Market and fixing in position with necessary G.I. L/J Hook of 10mm thick (galvanized coating 70 to 80 Microns) wherever required without damaging the nearby roof sheet all as specified and as directed, conveying and dumping the dismantled sheets with in a lead of 50m for retransporting all as directed at site including all labour,tools, materials, etc., complete.

80

-

-

... More
18.Repairing and servicing the inoperative Mild steel Rolling shutter of Size 3.75mX4.5M (approx) (2nos of rolling shutters each 30Kg MS required ) and making in good working condition by cutting welding and replacing the components like gear box, sheet, handles, hood cover, shaft etc., and fixing good working condition including all as directed and all as per specification including all labour, materials, tools, scaffolding, crane etc., complete.

20

-

-

... More
22.Providing and fixing of rigid unplasticized PVC pipes 110mm outer dia (Finolex or Trubore or Varun or Supreme) 4kgf/sq.cm. for Rain water down take lines including necessary specials like bends, tees, elbows, shoes etc., joining the pipes using necessary adhesives, and fixing with PVC clamps and making connections to floor traps, gully traps manholes etc., and making good the disturbed portions all as per relevant specification and all as directed at site including all materials, labour, tools, equipment, scaffolding etc., complete

190

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.