Chennai Port Trust Tender

... More
The CPT has issued a formal invitation for competitive bids for the Chennai Port Trust project, for Tender For Desilting,sludge Removal, Repairing, Re Construction Of Damaged Portion Of Drains And Casting And Placing Of Rcc Drain Cover Slabs At Main Road Iii And Cross Road F In Chennai Fishing Harbour in Chennai, Tamil Nadu, with an estimated contract value of Rs. 4,19,809. The bid opening date for this tender is 22-05-2025 and the last date for bid submission is 02-06-2025. Interested bidders for Chennai Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Chennai Port Trust - CPT Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date22 May 2025
Closing Date2 Jun 2025
Tender Amount₹ 4,19,809 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3. Engaging of Labours only for de-silting/ sludge removal work from drains, loading of de-silting material /sludge to JCB, and also lifting and re placing of existing Precast slabs on the drain wall all as directed at site of work including all materials, labour, tools, equipment, fuel, etc., complete

25

997

-

... More
4. Dismantling and removing the brick work manually/ by mechanical means in Cement Mortar to the required size and shape at all height / level wherever required without damaging the nearby structures including collecting and bringing down the debris to the ground level and depositing the debris within a lead of 50m for disposing all as specified and as directed at site, including all all labour, tools, tackles, equipments, fuel, scaffolding, etc., complete..

1.05

1903

-

... More
5.Providing and laying of PCC in CC 1:2:4 (1 cement : 2 CS sand : 4 graded stone aggregate 20 mm metal graded down to 12 mm size for drain side wall and wherever required all as directed at site of work including shuttering, mixing, transporting, placing, vibrating, curing etc., all as per relevant specifications and as directed at site of work including all labour, materials, tools, plants, equipment, fuel, etc., complete.

1.1

7277

-

... More
6.Providing Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in CM 1:5 (1 cement : 5 crushed stone sand) for drain side wall and wherever required all as directed at site , including all labour, materials, tools , curing, equipments, etc., complete.

1

6689

-

... More
7.Preparing the surfaces wherever required and plastering in cement mortar 1:5 (1 Cement : 5 Crushed stone sand) 12 mm thick at drain side walls and wherever required all as directed at site of work including all labour, materials, including cement, tools, equipments, curing, etc., complete.

3

324

-

... More
8.Providing and laying Plain cement concrete of 1:1.5:3 mix in volumetric proportion (1 Cement: 1.5 Crushed stone sand: 3 hard granite stone metal of 20mm graded down to 12 mm size) for ramp work at road crossing and wherever required all as directed at site of work, including mixing, transporting, placing, vibrating, curing shuttering, dewatering the sludge/ waste water during laying of concrete , etc., all as per relevant specifications and as directed at site of work including all labour, materials, tools, plants, equipment, fuel, etc., complete.

0.75

7475

-

... More
9.Providing, casting, and fixing in position of R CC precast cover slab 75 mm thick in cement concrete of mix 1:1.5:3 in volumetric proportions (1 cement : 1.5 crushed stone .sand : 3 stone aggregate (hard granite) 20mm size graded down to 12mm size) in volumetric proportion including finishing the exposed surface, in cement mortar 1:3 (1cement 3 crushed stone sand) 6 to 10mm thick with a floating coat of neat cement punning all as per relevant specification and as directed at site including mixing, transporting, placing, ramming, consolidating, etc. including shuttering vibrating, all labour, materials, curing, equipment, tools, etc. complete.

5.5

16327

-

... More
0.Supplying, fabricating and placing in position HYSD (Fe 415 / 500 grade) TMT steel bars as reinforcement for all RCC works wherever required, including handling, cutting, bending and tying with 1.25mm dia black annealed steel binding wire including placing, all as per relevant specification, drawings and as directed, including all materials, labour, tools, equipment, transport, fuel, etc., complete. Note:1.The rate shall be inclusive of cost of reinforcement steel, binding wire and fabrication charges etc., complete. Binding wire will not be measured for payment purpose.

1398

99

-

... More
11.Loading, transporting and levelling the debris in the low lying areas with a lead of 2 Kms all as per relevant specifications and as directed at site of work including all labour, transport, tools, equipment, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Port’s approved format at his own cost for the quantity of debris transported. 2. Payment will be based on the lorry cubical content. No deduction for voids will be made. However the final quantity will be restricted to actual quantity of dismantling/demolishing items for debris.

24

181

-

... More
12.Loading, transporting and levelling the desilting materials in the low lying areas with a lead of 2 Kms all as per relevant specifications and as directed including all labour, transport, tools, equipment, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Port’s approved format at his own cost for the quantity of de silted materials transported. 2. Payment will be based on the lorry cubical contents after deduction of 20% for voids. However the final quantity will be restricted to actual quantity of de silting.

90

227

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.