Chennai Metropolitan Water Supply And Sewerage Board Tender

... More
The CMWSSB has issued a formal invitation for competitive bids for the Chennai Metropolitan Water Supply And Sewerage Board project, for Package Ii, Replacement Of Various Sizes Of Damaged Swp Rcc, Strengthening Of Sewer Collection System In Various Sps Commanding Areas In Area Iv,v And Vi Under Vada Chennai Valarchi Thittam in Chennai, Tamil Nadu. The bid opening date for this tender is 28-03-2025 and the last date for bid submission is 08-04-2025. Interested bidders for Chennai Metropolitan Water Supply And Sewerage Board tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date28 Mar 2025
Closing Date8 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Package Ii, Replacement Of Various Sizes Of Damaged Swp Rcc, Strengthening Of Sewer Collection System In Various Sps Commanding Areas In Area Iv,v And Vi Under Vada Chennai Valarchi Thittam

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
at 3.0m deep

17

-

-

... More
at 2.0m deep

9

-

-

... More
500 mm DN Sluice valve

2

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

159

-

-

... More
at 1.5m deep

219

-

-

... More
Bill No.9B-Strengthening of sewer collection system in collection system in Dhimmaswamy Darga SPS, Area-VI

-

-

-

... More
at 3 m deep

423

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 4.0m deep

2

-

-

... More
at 2.5 m deep

22.5

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
at 4 m deep

97

-

-

... More
Bill No.5A-Strengthening of Sewer Collection System in Chetty Thottam SPS commanding Area (Depot 52), Area-V

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
160mm dia upto a depth of 1.5m

706

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bedding

38.7

-

-

... More
at 4 m deep

42

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Electromagnetic Flow Meter conforming to ISO 17025 Standard shall be a velocity sensing Electromagnetic type, microprocessor based signal converter, sealed housing, flanged tube meter for 1.0 Mpa working pressure, manufactured to highest standard available for mag-meters, equipped with minimum six digit digital totalizers, reading in units of kiloliters and shall be accurate within 0.5% of Measured value, shall operate within a range of 0.3m/sec to 4 m/sec and be constructed as follows:Meter tube (Sensor) shall be fabricated from stainless steel tube and use class PN10 flat face carbon street flanges in accordance with IS 1538. These flanges shall be welded to the flow tube. The internal and external of the meter tube shall be blasted to near white and lined with hard rubber /Polyurethane/PTFE preferably by SBR or EPDM. Meter tube shall have a constant nominal inside diameter offering no obstruction to the flow. The accuracy should be inclusive of linearity, hysteresis, repeatability, temperature and pressure effects. Coil Housing shall be fabricated from stainless steel/SS304/Die cast Aluminium/Carbon Steel with Anticorrosive paint for corrosion resistance and welded to the tube providing a completely sealed environment for all coils, electrode connections and wiring harness capable of submerged or buried operation. Signal Converter shall be pulsed DC coilexcitation type with auto zeroing. The signal converter shall be remotely mounted away from the meter. The converter shall indicate direction of flow and provide a flow rate indication and a total of flow volume for both forward and reverse directions. The converter shall provide an isolated 4-20 mA output into minimum 500-ohm load and a frequency output of a maximum of 0-10 KHZ and a scaled pulse output. The microprocessor based signal converter shall have a self-diagnostic test mode and a backlit display that continuously displays “Rate of Flow” and “Total Volume.”Converter shall be supplied with a prograable low flow drop out and empty pipe zero return. The signal converter housing should be die-cast aluminium with glass window. The converter cum transmitter should be fully prograable form the front facia. The prograing should be user friendly, self- prompting menu driven. Flow meter test calibration certificate should be provided with life cycle test certificate from FCRI/NABL accredited lab.

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
300 mm dia

3.99

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

2680

-

-

... More
at 2.5m deep

8.49

-

-

... More
at 3.5 m deep

64

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
Non Bus Route

-

-

-

... More
Bill No.2-Construction of roadside Sewage pumping station and allied works at Moolakothalam in Depot-53,Area-V

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 2.5m deep

31.11

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red

-

-

-

... More
Bus Route

1441.8

-

-

... More
For manholes of pipes upto 1200 mm dia

23

-

-

... More
Non Bus route

1450

-

-

... More
Non Bus Route

243.95

-

-

... More
Non Bus Route

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Bus Route

-

-

-

... More
Bedding

77.86

-

-

... More
400mm dia CI pipe

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

15

-

-

... More
Road Cutting

-

-

-

... More
100mm D/F C.I cut pipe - 1.5m long

1

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

3

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above

-

-

-

... More
at 4.0m deep

4

-

-

... More
Hire charges for diesel pumpset for 5HP

2640

-

-

... More
Backfill Envelope (Sidefill)

89.72

-

-

50

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

12

-

-

... More
at 4.0m deep

4

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
at 3 m deep

113

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5 m deep

50

-

-

... More
at 2.5 m deep

476

-

-

... More
Asphalt Road

50

-

-

55

-

-

... More
Jointing the double flanged specials with rubber insertion to the required specifications with M.S bolts and nuts, complete.

-

-

-

... More
450 mm D/F C.I cut pipe - 1.0m long

1

-

-

... More
Bus Route

450.63

-

-

... More
at 3.5 m deep

57

-

-

19

-

-

... More
at 2.0m deep

4

-

-

... More
at 2.5m deep

4

-

-

... More
60 x 60 x 150cm

5

-

-

... More
Road Cutting

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

2

-

-

... More
700mm D/Soc CI 90º Bend

6

-

-

... More
Non Bus Route

4169.19

-

-

... More
at 1.5 m deep

598.08

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Construction of Air valve chamber of size 1.2m x 0.8m x 1.9m including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

... More
at 1.5m deep

26.94

-

-

... More
For the points Underground/ Surface Assets along the roads

14

-

-

... More
at 1.5m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

4

-

-

... More
Cutting CI Pipes

-

-

-

... More
at 1.5m deep

21

-

-

... More
300mm dia CI pipe

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
at 3.5m deep

2

-

-

... More
at 2.5 m deep

69.2

-

-

... More
Thrust Blocks

-

-

-

... More
at 5.5 m deep

89

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4 m deep

43

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

99

-

-

... More
at 2.0m deep

11

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
at 2.5m deep

1

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 3.0m deep

3

-

-

... More
at 4.5m deep

2

-

-

... More
300mm C.I D/f pipe -0.5m long

2

-

-

... More
Bus Route

-

-

-

... More
at 3.5m deep

1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Using 7.5HP Diesel pumpset

384

-

-

... More
For 150mm valve connection upstream

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

2

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

2

-

-

... More
Bus Route

2.04

-

-

... More
at 2 m deep

75

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5m deep

1

-

-

... More
160mm dia upto a depth of 1.5m

765

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm D/F 90oDuck Foot Bend

1

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Excavating of driving pit and receiving pit of size 3.00m (length) x 3.50m (breadth), depth upto 5m in all soil strata including shoring and strutting using 6 tk MS Plate of size 3.50m x 3.50m usable for 15 operations and providing 16 thickness MS plate of size 3.00m x 3.50m with 100 x100 x 12 angles of 4m length for holding the MS plates for Thrust arrangements to receive the impacts during pushing operation of encasing pipe. Lowering the following size of MS encasing pipe by using Contractor’s crane and machineries and jointing MS pipes by welding, across the National Highways/State Highways/ Railways/Canal crossing etc and driving the horizontal bore by pushing / jacking method (trenchless technology method) using contractor’s machineries such as cranes, jacks, jacking materials, generator, welding machineries, compressor, jack haer and other equipments etc. without interfering and causing any hindrance to the movement of traffic or any other vehicles, without any disturbances to the railway/road/canal formation etc. including bailing / pumping of water where ever necessary without affecting any installation like water supply pipeline/telephone cable, electric cables etc. passing nearby area and scooping the earth inside the pipes and pit and depositing the surplus earth in a convenient place and leveling the site after completion of entire work as directed by TWAD Engineers.

-

-

-

... More
Road Cutting

-

-

-

... More
at 1.5 m deep

30.81

-

-

... More
at 3.0m deep

19

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 3.0m deep

7

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Bill No.7A-Strengtening of sewer collection system in Langs Garden SPS commanding area (Depot-63 and 61), Area-V

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Asphalt Road

1038

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
300 mm

6

-

-

... More
Construction of chamber for valves including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

4

-

-

... More
Bedding

3.22

-

-

... More
150mm D/F C.I cut pipe - 1.0m long

1

-

-

... More
300 mm

6

-

-

... More
Wet mix 100mm with M20 grade

616.25

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
at 2 m deep

153

-

-

... More
at 2.5m deep

6

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
500mm dia CI pipe

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 2.5m deep

2

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

6.55

-

-

... More
Using 5HP Diesel pumpset

512

-

-

... More
Cutting DWC Pipes

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
For manholes of pipes upto 1200 mm dia

1

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities

-

-

-

... More
at 2.0m deep

3

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
For manholes of pipes upto 1200 mm dia

20

-

-

... More
at 3.5 m deep

53

-

-

... More
160mm dia upto a depth of 1.5m

899

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
250 mm dia

7.14

-

-

... More
at 2.0m deep

7

-

-

... More
at 4.5 m deep

10

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Bedding

90.77

-

-

46

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
250mm Dia sluice valve

1

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

1

-

-

... More
400mm dia CI pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

2.94

-

-

... More
Backfill Envelope (Sidefill)

105.64

-

-

... More
at 4.5 m deep

90

-

-

... More
Bus Route

-

-

-

17

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

1980

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

59.5

-

-

... More
1.05mx 0.9m

-

-

-

... More
160mm dia upto a depth of 1.5m

53

-

-

... More
Bill No.3E-Strengthening of Sewer Collection System in , North Wall Road SPS commanding Area (Depot 54), Area-V

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Non Bus Route

-

-

-

... More
Pipe laying - 5 - 15 Km

5.87

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 4.5m deep

1

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5 m deep

43

-

-

... More
at 3.5m deep

1

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

4

-

-

... More
at 3.0m deep

7

-

-

... More
700mm D/Soc CI collar

29

-

-

... More
Non Bus Route

1981.1

-

-

... More
at 2 m deep

83

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)

-

-

-

... More
at 3.0m deep

1

-

-

... More
Concrete Road

398

-

-

... More
Provinding testing of corrogate design stainless steel expansion bellows with flanges 15mm axial movement, 300mm overall length with tie roads, nuts etc.PN-1.6

-

-

-

... More
at 3.0m deep

8

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Specials for 80 mm Air valve-450 mm x 100 mm D/Soc/Fl Tee

2

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

10

-

-

... More
at 1.5m deep

38

-

-

... More
60 x 60 x 105cm

63

-

-

... More
Bedding

26.05

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
at 2.0m deep

3

-

-

... More
Bedding

140.83

-

-

... More
at 2.5 m deep

22

-

-

... More
at 2.5m deep

58

-

-

... More
Non Bus Route

574

-

-

... More
Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

5984

-

-

... More
Non Bus Route

-

-

-

... More
250 mm dia

3.06

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
450 mm D/F C.I cut pipe - 0.5m long

2

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

4

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 4.5 m deep

67

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Concrete Road

1085

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

11

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fa

-

-

-

... More
at 4.0m deep

10

-

-

... More
450 mm D/F C.I cut pipe - 0.5m long

2

-

-

... More
Bus Route

95.58

-

-

... More
Non Bus Route

-

-

-

5

-

-

4

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
2 to 5 km

1

-

-

... More
Non Bus Route

2404.14

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

2102.73

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
200 mm

4

-

-

... More
Bil No.11-Strengthening of sewer collection system in VOC nagar SPS Commanding area (Depot-72), Area-VI

-

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
at 2.0m deep

1

-

-

... More
160mm dia upto a depth of 1.5m

57.6

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

1374.05

-

-

12

-

-

... More
Bus Route

-

-

-

... More
at 4.5m deep

12

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
at 2 m deep

30

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supplying, conveying and fixing the sluice valves, Scour Valve, Reflux Valve as per IS 14846/2000 PN 1 with tail pieces including fixing the surface boxes/valves, covers. and CI double air valve as per IS14845/2000 with ISI marking including lowering, Aligning etc,m complete

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 1.5 m deep

170

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Bus Route

89.91

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 4.5 m deep

30

-

-

... More
at 3.5m deep

8

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

123.98

-

-

... More
Non Bus Route

157.79

-

-

... More
at 3.5 m deep

10

-

-

... More
Backfill Envelope (Sidefill)

101.66

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 2 m deep

265

-

-

... More
Non Bus Route

-

-

-

... More
160mm dia upto a depth of 1.5m

840

-

-

... More
Bus Route

56

-

-

... More
Cutting DWC Pipes

-

-

-

105

-

-

... More
Non Bus Route

5304.6

-

-

... More
Bedding

2.97

-

-

... More
Non Bus Route

-

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
at 3.5m deep

7.92

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
160mm dia upto a depth of 1.5m

163.2

-

-

... More
at 2 m deep

35

-

-

... More
Non Bus Route

1.82

-

-

... More
at 2.5m deep

1

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 1.5 m deep

340

-

-

... More
Road Cutting

-

-

-

... More
at 4.0m deep

3

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
160mm dia upto a depth of 1.5m

132

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Backfill Envelope (Sidefill)

60.04

-

-

... More
Non Bus Route

3416

-

-

... More
Non Bus Route

-

-

-

... More
at 1.0m deep

17

-

-

... More
450mm D/Soc CI 90o Bend

12

-

-

... More
at 1.5 m deep

389.64

-

-

... More
Hire charges for diesel pumpset for 5HP

4000

-

-

... More
at 3.0m deep

16

-

-

... More
160mm dia upto a depth of 1.5m

2371

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bus Route(300mm)

0.4

-

-

... More
110mm dia upto a depth of 1.0m

3062

-

-

... More
450mm D/Soc CI 90o Bend

10

-

-

... More
80mm Dia Double Air valve

2

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.5m deep

2

-

-

... More
160mm dia upto a depth of 1.5m

8

-

-

... More
at 1.5m deep

72

-

-

... More
at 2.5m deep

9

-

-

... More
Non Bus Route

2

-

-

... More
Non Bus Route

-

-

-

... More
Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth.

-

-

-

... More
Backfill Envelope (Sidefill)

273.59

-

-

... More
Bedding

168.1

-

-

... More
at 2.5m deep

1

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

77

-

-

... More
250mm F/Spi Tail Piece

1

-

-

... More
at 4.0m deep

1

-

-

... More
Bil No.12-Enlargement of 525mm CI pumping main to 700mm CI main from sembium SPS to Perambur relay SPS in Area-VI

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
As per Rate analysis done in Data for CS.xlsx /Sheet Name-Labour

-

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.0m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

1

-

-

... More
Supplying, conveying and fixing the slucie valves as per IS 14846/2000 PN 1 and CI double air valve as per IS14845/2000 with ISI marking including lowering, Aligning etc, complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

54.5

-

-

... More
For end concrete

2125.14

-

-

... More
Bus Route

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 1.5 m deep

260.6

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 3.5 m deep

22

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bedding

21.14

-

-

... More
Non Bus Route

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

2060.82

-

-

1

-

-

... More
Non Bus Route

6216.3

-

-

... More
For manholes of pipes upto 1500 mm dia

1

-

-

... More
at 4.5m deep

10

-

-

... More
For manholes of pipes upto 1200 mm dia

7

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Bill No.6A-Strengthening of Sewer Collection System in Royapuram SPS commanding Area (Depot 55&57) Area-V

-

-

-

... More
at 3.0m deep

8

-

-

... More
110mm dia upto a depth of 1.0m

2218

-

-

... More
Non Bus Route

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
300 mm dia

3.99

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

3

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 3.0m deep

1

-

-

... More
100mm Diameter Dismantle Joint

3

-

-

... More
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

6

-

-

... More
Bus Route

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Supplying, conveying and fixing the following CI specials for valves.Specials for 300mm Sluice valve

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fa

-

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 1.5m deep

22

-

-

... More
Non Bus Route

5602.17

-

-

105

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 1.0m deep

6

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 4.0m deep

2

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,s

-

-

-

... More
Non Bus Route

23

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Hire charges for diesel pumpset for 5HP

160

-

-

... More
Non Bus Route

2934.18

-

-

... More
Road Cutting

-

-

-

... More
Bus Route

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

1

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5 m deep

90

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

8

-

-

... More
For manholes of pipes upto 1200 mm dia

15

-

-

... More
250mm Dummy Flange

1

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5 m deep

62

-

-

... More
Hire charges for diesel pumpset for 5HP

1600

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
at 4.5 m deep

77.37

-

-

... More
at 3.0m deep

22

-

-

... More
1.05mx 0.9m

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

1053.29

-

-

... More
at 3.5 m deep

221

-

-

136

-

-

... More
at 1.5 m deep

1490

-

-

... More
Supplying, conveying and fixing the sluice valves, Scour Valve, Reflux Valve as per IS 14846/2000 PN 1 with tail pieces including fixing the surface boxes/valves, covers. and CI double air valve as per IS14845/2000 with ISI marking including lowering, Aligning etc,m complete

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Bus Route

1266.6

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
60 x 60 x 150cm

300

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

243.38

-

-

... More
at 4.0m deep

2

-

-

... More
at 3.5m deep

6.19

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 1.5m deep

72

-

-

... More
at 2 m deep

107.76

-

-

... More
400mm dia CI pipe

1

-

-

... More
Non Bus Route

1

-

-

... More
at 4.5m deep

5

-

-

... More
250mm F/Socket Tail Piece

1

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

1000.63

-

-

... More
Bus Route

-

-

-

... More
at 3.5 m deep

5

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
For manholes of pipes upto 1500 mm dia

5

-

-

... More
Bedding

448.34

-

-

... More
Non Bus Route

2167.08

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For 100mm valve connection upstream

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 3.0m deep

6

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Concrete Road

2784

-

-

... More
60 x 60 x 150cm

105

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
Non Bus Route

6378.71

-

-

118

-

-

... More
at 3.0m deep

10.18

-

-

... More
Bus Route

556

-

-

... More
Asphalt Road

256.48

-

-

... More
Road Cutting

-

-

-

... More
at 3 m deep

308.94

-

-

... More
Non Bus Route

10305.2

-

-

... More
at 3.5 m deep

89

-

-

6

-

-

... More
at 4.5m deep

10

-

-

... More
at 3 m deep

476

-

-

6

-

-

132

-

-

... More
at 4 m deep

46

-

-

... More
Inspection chamber

12

-

-

... More
at 1.5m deep

39

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2 m deep

490

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

7

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

39

-

-

... More
Backfill Envelope (Sidefill)

63.73

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bill No.3A-Strengthening of Sewer Collection System in Wall Tax Road SPS commanding Area (Depot 59), Area-V

-

-

-

... More
Hire charges for diesel pumpset for 5HP

2400

-

-

... More
Non Bus Route

-

-

-

... More
Specials for 200 mm Air valve

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 3.5m deep

1

-

-

... More
Bus Route

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
60 x 60 x 150cm

60

-

-

... More
at 3.5m deep

2

-

-

... More
Non Bus Route(300mm)

0.4

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

100

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 3 m deep

423.8

-

-

... More
at 2.0m deep

1

-

-

... More
Asphalt Road

1106.26

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

11

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bill No-1 - Enlargement of 350mm dia existing PSC sewage pumping main to 450mm dia CI main from Melapatti Pumping station to Erukanchery SPS in Area-IV

-

-

-

... More
at 1.5m deep

11

-

-

... More
Asphalt Road

1917.1

-

-

... More
Concrete Road

1818

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

524.09

-

-

... More
at 1.5m deep

67

-

-

... More
Concrete Road

67.32

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 1.5 m deep

103

-

-

... More
Bus Route

-

-

-

... More
Bedding

22.96

-

-

... More
For the points Underground/ Surface Assets along the roads

35

-

-

... More
400 mm D/F C.I cut pipe - 1.0m long

2

-

-

... More
at 2.5m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
at 3.0m deep

2

-

-

... More
Cutting DWC Pipes

-

-

-

... More
at 3.0m deep

4

-

-

... More
Non Bus Route

2

-

-

... More
Non Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

2.52

-

-

... More
200 mm

8

-

-

... More
Bus Route

134.82

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

1

-

-

... More
Bedding

17.38

-

-

... More
at 3 m deep

175

-

-

... More
at 4.0m deep

5

-

-

... More
at 1.5m deep

26

-

-

... More
Non Bus Route

3325.91

-

-

... More
400 mm Dia scour valve

2

-

-

... More
at 3.5m deep

3

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
2 to 5 km

1.99

-

-

... More
at 5 m deep

113

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Brick Machine holes

-

-

-

... More
For manholes of pipes upto 1200 mm dia

28

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Backfill Envelope (Sidefill)

76

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

1

-

-

... More
160mm dia upto a depth of 1.5m

397

-

-

... More
For the points Underground/ Surface Assets along the roads

196

-

-

... More
Cutting CI Pipes

-

-

-

... More
Non Bus Route

927.9

-

-

... More
at 4.5m deep

1

-

-

... More
at 4.0m deep

3

-

-

... More
For the points Underground/ Surface Assets along the roads

25

-

-

... More
Bus Route

-

-

-

... More
Brick Machine holes

-

-

-

... More
at 3.0m deep

2

-

-

45

-

-

... More
at 3.5m deep

1

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 5 m deep

55.5

-

-

... More
Supply, conveying and fixing CI D/F pipes as per IS:1537 and CI SS/DF specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For 2.0m deep

99.57

-

-

... More
at 2 m deep

1290

-

-

... More
at 4.5m deep

5

-

-

... More
Non Bus Route

2639.28

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

2

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4 m deep

117.64

-

-

... More
Bil No.10B-Strengthening of sewer collection system in Edward Park SPS commanding area (Depot 76) in Area VI

-

-

-

... More
GST @18%

1

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

3.96

-

-

... More
Asphalt Road

622.81

-

-

... More
For manholes of pipes upto 1200 mm dia

114

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
at 2.0m deep

34

-

-

... More
700 mm D/F C.I cut pipe - 1.0m long

2

-

-

... More
at 4.5m deep

5

-

-

... More
295/250 mm OD/ID DWC PE or PP pipe

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
at 5m deep

2

-

-

... More
at 1.5m deep

15

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bill No.5E-Strengthening of Sewer Collection System in Tondiarpet 'C' SPS commanding Area, Area-V

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2 m deep

165

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
at 2.5m deep

19.8

-

-

... More
at 4.5 m deep

30.32

-

-

... More
110mm dia upto a depth of 1.0m

664.8

-

-

... More
For the points Underground/ Surface Assets along the roads

58

-

-

... More
Temporary bypassing of sewer including Plugging the mouth ofpipe/s inside sewer manhole using suitable plugging system andinstallation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per theinstructions of Engineer-in-Charge and keeping the manhole freefrom seepage and removal of bypass by deplugging the mouth ofpipe inside sewer manhole and removal of by pass system andmaking the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications anddirections of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

78

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 2.5m deep

48

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Bedding

13.52

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
at 1.5 m deep

22.7

-

-

... More
Non Bus Route

15754.61

-

-

... More
Non Bus Route

20.52

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
300 mm F/Spi Tail Piece

2

-

-

... More
250 mm dia

28.56

-

-

... More
at 4.0m deep

1

-

-

... More
Non Bus Route

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 1.5m deep

7

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all excavation, refillingwatering and ramming etc. complete

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 2.0m deep

1

-

-

... More
110mm dia upto a depth of 1.0m

1171

-

-

... More
at 3.0m deep

19

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

1

-

-

... More
Non Bus Route

1077.36

-

-

... More
Non Bus Route

1080

-

-

... More
110mm dia upto a depth of 1.0m

30

-

-

... More
150mm Non Return valve

1

-

-

... More
Non Bus Route

26.65

-

-

... More
Bus Route

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
at 3.0m deep

8

-

-

... More
at 1.5m deep

2.84

-

-

... More
at 2.5m deep

1

-

-

... More
For manholes of pipes upto 1200 mm dia

4

-

-

... More
at 3 m deep

217

-

-

... More
at 3.5 m deep

5

-

-

... More
Asphalt Road

1426

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

10

-

-

... More
Non Bus Route

-

-

-

... More
Construction of for Air valve chamber including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

7

-

-

... More
at 4.5m deep

10.18

-

-

... More
300 mm F/Soc Tail Piece

2

-

-

... More
Non Bus Route

-

-

-

... More
Using 7.5HP Diesel pumpset

240

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bedding

40.28

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
at 3.0m deep

7

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 1.5m deep

39

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
350 mm

2

-

-

... More
For manholes of pipes upto 1200 mm dia

25

-

-

... More
at 1.5m deep

127

-

-

... More
For the points Underground/ Surface Assets along the roads

25

-

-

... More
Non Bus Route

-

-

-

89

-

-

... More
Hire charges for diesel pumpset for 5HP

2560

-

-

... More
Non Bus Route

-

-

-

... More
at 3.0m deep

10

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
at 2 m deep

718.2

-

-

6

-

-

... More
110mm dia upto a depth of 1.0m

475

-

-

... More
at 5m deep

8

-

-

35

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

11.31

-

-

... More
110mm dia upto a depth of 1.0m

422.4

-

-

... More
at 4.5 m deep

61

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
160mm dia upto a depth of 1.5m

58

-

-

... More
at 2.0m deep

7

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
160mm dia upto a depth of 1.5m

30

-

-

... More
Using 5HP Diesel pumpset

660

-

-

... More
Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4.0m deep

4.53

-

-

... More
at 3 m deep

213

-

-

... More
at 1.5m deep

9

-

-

... More
at 2.0m deep

5

-

-

... More
at 4.5m deep

8

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 3.5m deep

9

-

-

... More
at 2.5m deep

6

-

-

5

-

-

... More
Non Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Non Bus Route

-

-

-

... More
Inspection chamber

84

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
250mm D/F C.I cut pipe - 2m long

1

-

-

... More
at 3.0m deep

1

-

-

... More
at 3 m deep

215

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

141

-

-

... More
Cutting DWC Pipes

-

-

-

... More
For manholes of pipes upto 1200 mm dia

10

-

-

... More
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)

-

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
at 2.5m deep

20

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Bus Route

-

-

-

... More
at 4.5m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 2.5m deep

11

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

20

-

-

... More
Non Bus Route

9.07

-

-

... More
60 x 60 x 150cm

259

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

230

-

-

... More
at 1.5 m deep

2813

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

1

-

-

... More
Hire charges for diesel pumpset for 5HP

1800

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
at 2.0m deep

39

-

-

... More
1.05mx 0.9m

-

-

-

... More
100mm Non Return valve

1

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

46

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
For the points Underground/ Surface Assets along the roads

74

-

-

... More
300 mm Dia Sluice valve

2

-

-

... More
at 2.0m deep

1

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
at 2 m deep

30

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes

-

-

-

... More
at 2.0m deep

20.36

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Bed Block for Crossing

0.02

-

-

... More
Supply, laying and jointing CI S/S pipes with EDPM rubber gaskets including earth work excavation in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning including disposal of surpulus earth, refilling the trenches etc, complete at an average depth of 1.5-2.0m.

-

-

-

... More
80mm Double Air valve

2

-

-

... More
250mm D/Soc CI 22.5º Bend

2

-

-

... More
at 4.0m deep

1

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 3.5 m deep

20

-

-

... More
at 4.5 m deep

17.2

-

-

... More
For the points Underground/ Surface Assets along the roads

9

-

-

... More
100mm D/F C.I cut pipe - 1.0m long

1

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
For 250mm valve connection upstream

-

-

-

... More
Non Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
at 2.0m deep

2

-

-

... More
150mm F/Spi Tail Piece

1

-

-

... More
160mm dia upto a depth of 1.5m

606

-

-

... More
As per Rate analysis done in Anchor Block Rates for DWC 23.xlsx

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

6

-

-

... More
160mm dia upto a depth of 1.5m

290

-

-

... More
Bedding

26.48

-

-

... More
at 3.0m deep

1

-

-

... More
Bus Route

-

-

-

... More
250 mm dia

24.82

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes

-

-

-

... More
Supply, conveying and fixing CI D/F pipes as per IS:1537 and CI SS/DF specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and raing to consolidation, etc. at any depth.

-

-

-

... More
at 4 m deep

5

-

-

... More
60 x 60 x 105cm

180

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

2

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.0m deep

1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.5m deep

2

-

-

... More
at 3.0m deep

3.39

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
250 mm dia

19.72

-

-

416

-

-

53

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 3.5 m deep

150

-

-

... More
at 4.0m deep

2

-

-

... More
1.05mx 0.9m

-

-

-

... More
110mm dia upto a depth of 1.0m

14016

-

-

... More
Non Bus Route

-

-

-

... More
Concrete Road

3083

-

-

... More
at 3 m deep

198.98

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
500mm dia CI pipe

3

-

-

41

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3 m deep

68

-

-

3

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

231.97

-

-

... More
at 3.5 m deep

108.63

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

1571.77

-

-

... More
Hire charges for diesel pumpset for 5HP

2880

-

-

... More
For manholes of pipes upto 1200 mm dia

3

-

-

4

-

-

... More
160mm dia upto a depth of 1.5m

293

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

338

-

-

... More
Non Bus Route

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
250mm D/Soc CI 22.5º Bend

1

-

-

... More
at 2.5 m deep

59

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

3.06

-

-

... More
at 3.5m deep

3

-

-

... More
160mm dia upto a depth of 1.5m

20

-

-

... More
Bus route road

1120

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bus Route

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
For manholes of pipes upto 1500 mm dia

1

-

-

... More
at 5m deep

3

-

-

... More
at 1 m deep

1274.2

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

7

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Road Cutting

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Bill No.3B-Strengthening of Sewer Collection System in Wall Tax Road SPS commanding Area (Depot 57), Area-V

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.

-

-

-

... More
Backfill Envelope (Sidefill)

106.19

-

-

... More
at 3.5m deep

3

-

-

... More
at 1.5m deep

21

-

-

... More
Bus Route

544.05

-

-

... More
at 3.0m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

259

-

-

... More
at 3.5m deep

2

-

-

... More
Non Bus Route

1.71

-

-

... More
at 2.5m deep

1

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 1.5 m deep

1062.59

-

-

7

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 2.0m deep

2.27

-

-

... More
Concrete Road

639.11

-

-

... More
Bedding

69.51

-

-

... More
110mm dia upto a depth of 1.0m

4805

-

-

... More
at 2.5m deep

14.14

-

-

... More
For the points Underground/ Surface Assets along the roads

73

-

-

29

-

-

... More
150 dia Pressure Gauge and Vaccum guage including all accessories as per specification (For Suction and Delivery to be mounted on wall on Teak Wood Board)

1

-

-

... More
Non Bus Route

2456.53

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Pipe Specials

11

-

-

... More
300mm dia. & below sewer line

47

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 2 m deep

30.79

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
at 1.0m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

1

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

126

-

-

... More
400 mm D/F C.I cut pipe - 0.5m long

2

-

-

... More
700mm D/Soc CI 22.5º Bend

6

-

-

... More
For manholes of pipes upto 1200 mm dia

10

-

-

... More
Non Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 1.5m deep

5

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

2

-

-

... More
at 1.5m deep

16

-

-

... More
Hire charges for diesel pumpset for 5HP

3321

-

-

... More
Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
700 mm dia

19

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

96.28

-

-

... More
1.05mx 0.9m

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
160mm dia upto a depth of 1.5m

152

-

-

... More
at 3.5m deep

10

-

-

... More
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes

-

-

-

... More
at 3.5m deep

1

-

-

... More
Hire charges for diesel pumpset above 7.5 HP

480

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.5m deep

62

-

-

... More
Non Bus Route

7620.48

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

2285.76

-

-

15

-

-

... More
Bill No.6C-Strengthening of Sewer Collection System in Royapuram SPS commanding Area (Depot 60) Area-V

-

-

-

... More
Road Cutting

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

29

-

-

26

-

-

... More
at 1.5m deep

7

-

-

326

-

-

... More
at 4 m deep

22

-

-

... More
at 4 m deep

5

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities

-

-

-

... More
400 mm

2

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
400mm dia CI pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
450 mm dia

22

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
110mm dia upto a depth of 1.0m

2822

-

-

... More
700mm dia CI pipe at 5.5m depth

56

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Brick Machine holes

-

-

-

... More
at 3.5 m deep

11.6

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.5m deep

2.83

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.5 m deep

1497

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

52

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK

-

-

-

... More
at 3.5m deep

14

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
at 3.0m deep

18

-

-

... More
As per Rate analysis done in Anchor Block Rates for DWC 23.xlsx

-

-

-

... More
at 2.0m deep

15

-

-

... More
160mm dia upto a depth of 1.5m

766

-

-

... More
at 4.5m deep

8

-

-

... More
Non Bus Route

-

-

-

221

-

-

... More
at 1.5 m deep

287

-

-

... More
100mm D/F C.I cut pipe - 3m long

2

-

-

... More
at 1.5 m deep

27

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

2

-

-

... More
Road Cutting

-

-

-

... More
at 3.5m deep

6

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 4.5 m deep

5

-

-

... More
160mm dia upto a depth of 1.5m

13

-

-

... More
For manholes of pipes upto 1200 mm dia

9

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
For manholes of pipes upto 1200 mm dia

6

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
at 1.5 m deep

6528

-

-

... More
at 2.5m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

14

-

-

... More
at 1.5m deep

39

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
at 3.5 m deep

20.5

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

4.48

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

641.62

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Class-LA 250mm Diameter

1258

-

-

... More
at 3 m deep

20

-

-

... More
Non Bus Route

18.02

-

-

... More
For 1.5m deep

713.67

-

-

... More
Inspection chamber

274

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

1

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all exca

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 2.5m deep

11

-

-

... More
at 3 m deep

84.7

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Cutting CI Pipes

-

-

-

10

-

-

... More
450mm D/Soc CI 45o Bend

1

-

-

... More
Delivery Main 3

-

-

-

... More
450mm x 350 mm D/S taper

2

-

-

... More
Non Bus Route

-

-

-

... More
500mm dia CI pipe at 5.0m depth

198

-

-

280

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bill No.6-Strengthening of sewer collection system in Royapuram SPS Commanding Area (Depot-55,56,57 and 60), Area-V

-

-

-

... More
at 3.0m deep

1

-

-

... More
Non Bus Route

52.02

-

-

33

-

-

... More
at 4.5m deep

2

-

-

... More
at 1.5 m deep

830

-

-

... More
at 2.5m deep

3

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
110mm dia upto a depth of 1.0m

1002

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

1

-

-

... More
Bus Route

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

440

-

-

... More
at 3.0m deep

13.58

-

-

... More
at 3.5 m deep

10

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Bill No.7B-Strengtening of sewer collection system in Sydenams Road SPS commanding area (Depot-63 and 61), Area-V

-

-

-

63

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Bill No.4A-Strengthening of sewer collection system in Nepiyar SPS Commanding Area (DEPOT 59,62 & 63), AREA - V

-

-

-

... More
at 4.0m deep

4.53

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
160mm dia upto a depth of 1.5m

79

-

-

... More
at 4.0m deep

2

-

-

... More
110mm dia upto a depth of 1.0m

53

-

-

... More
60 x 60 x 105cm

15

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 1m deep

8

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of

-

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly & SRC for plain concrete works including laying ramming curing, etc., complete.

0.2

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

396.95

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

2

-

-

256

-

-

... More
at 1.5m deep

12

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Above 2.5m

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Bus Route Road

-

-

-

... More
As per Rate analysis done in Dismantling Sheet

-

-

-

... More
200 mm Sluice Valve for isolation of AV

4

-

-

53

-

-

... More
110mm dia upto a depth of 1.0m

750

-

-

... More
110mm dia upto a depth of 1.0m

211.2

-

-

1200

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 2.5m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Hire charges for diesel pumpset for 7.5HP

960

-

-

... More
80mm Double Air valve

1

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Suction Well

-

-

-

... More
at 1.5m deep

5.67

-

-

... More
Bus Route

-

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
150mm DN Scour valve

1

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
As per Rate analysis done in Dismantling Sheet

-

-

-

... More
250mm D/F 90oDuck Foot Bend

1

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5 m deep

158.6

-

-

... More
For manholes of pipes upto 1200 mm dia

34

-

-

... More
Non Bus Route

-

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates fromthe nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone44N). The final base map with assets and utilities

-

-

-

106

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5m deep

27.71

-

-

... More
Non Bus Route

-

-

-

70

-

-

... More
at 1.5m deep

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 2.5 m deep

531.27

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
Backfill Envelope (Sidefill)

144.53

-

-

... More
at 3 m deep

15

-

-

... More
Backfill Envelope (Sidefill)

2084.56

-

-

... More
at 2.5m deep

18

-

-

101

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

3

-

-

... More
Hire charges for diesel pumpset for 5HP

2124

-

-

... More
at 2.5m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

221.3

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio

-

-

-

... More
450mm dia CI pipe

-

-

-

... More
at 3.0m deep

2

-

-

... More
Specials for 80mm Air valve

-

-

-

... More
at 4.5 m deep

58.93

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Non Bus Route

22676.8

-

-

... More
Non Bus Route

-

-

-

... More
Backfill Envelope (Sidefill)

750.71

-

-

... More
Bill No.6B-Strengthening of Sewer Collection System in Royapuram SPS commanding Area (Depot 52) Area-V

-

-

-

... More
at 3.0m deep

16

-

-

... More
at 3.5 m deep

10

-

-

... More
110mm dia upto a depth of 1.0m

12413

-

-

... More
160mm dia upto a depth of 1.5m

14

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well

-

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
at 4.5m deep

6

-

-

... More
at 3.5m deep

1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
500mm dia CI pipe

1

-

-

... More
Bus Route

-

-

-

... More
at 2.0m deep

13.58

-

-

... More
at 2.5m deep

3

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
at 1.5m deep

259

-

-

... More
Backfill Envelope (Sidefill)

11.48

-

-

... More
500 mm Diameter Dismantle Joint

2

-

-

... More
Non Bus Route

2278

-

-

... More
Non Bus Route

3776

-

-

... More
For manholes of pipes upto 1200 mm dia

21

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4.0m deep

1

-

-

... More
at 1.0m deep

5

-

-

... More
Asphalt Road

359.36

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

3

-

-

... More
For end concrete

741.67

-

-

... More
at 2.5m deep

8.49

-

-

... More
Road Cutting

-

-

-

... More
at 2.0m deep

1

-

-

79

-

-

... More
400mm dia CI pipe

7

-

-

... More
Bus Route

14.38

-

-

... More
Cutting DWC Pipes

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities

-

-

-

3

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
For the points Underground/ Surface Assets along the roads

14

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
160mm dia upto a depth of 1.5m

434

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

110

-

-

48

-

-

... More
Pipe laying - 2 Km

1

-

-

... More
Hire charges for diesel pumpset for 5HP

2000

-

-

... More
at 2 m deep

285

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Asphalt Road

80

-

-

3

-

-

... More
Bus Route

-

-

-

... More
at 2.5m deep

1

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
at 2.5m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

1469.2

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.5m deep

3

-

-

... More
Bus Route

1

-

-

... More
at 3.0m deep

4

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

471.23

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
110mm dia upto a depth of 1.0m

9480

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 6m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
at 2.5m deep

10

-

-

... More
Backfill Envelope (Sidefill)

1175.44

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Asphalt Road

5370.46

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Pressure Gauge

-

-

-

... More
Road Cutting

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
As per Rate analysis done in Anchor Block Rates for DWC 23.xlsx

-

-

-

... More
Bus Route

1

-

-

... More
at 1.0m deep

69

-

-

... More
Bill No.4.-Strengthening of sewer collection system in Nappier park SPS, Link road SPS, Border thottam SPS, Law college SPS, Sathiyani Muthu Nagar SPS, Navalar Neduncheiliyan Nagar SPS & South Coovum road SPS commanding area (Depot 59, 60,62 and 63), Area-V

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

10

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 1.0m deep

4

-

-

... More
at 1.5 m deep

290

-

-

... More
200 mm Dia Double Air valve

4

-

-

... More
Non Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 3.5m deep

4

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
at 3 m deep

190.6

-

-

... More
at 2.5 m deep

15

-

-

... More
at 3.0m deep

7

-

-

... More
Road Cutting

-

-

-

... More
250mm D/F 90o Bend

1

-

-

14

-

-

... More
Asphalt Road

3067

-

-

... More
at 4.5 m deep

69

-

-

... More
at 1.5m deep

12

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 3.0m deep

2

-

-

... More
As per Rate analysis done in Dismantling Sheet

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

6

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

165

-

-

7

-

-

... More
300mm dia CI pipe

2

-

-

... More
at 2 m deep

516

-

-

82

-

-

... More
Non Bus Route

125.52

-

-

143

-

-

20

-

-

... More
Road Cutting

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
700 mm x 200 mm D/Soc/Fl Tee

4

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

2578.65

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 2.5m deep

6

-

-

... More
160mm dia upto a depth of 1.5m

278

-

-

... More
at 2.0m deep

24

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of

-

-

-

... More
Hire charges for diesel pumpset for 5HP

1900

-

-

... More
at 2.0m deep

5

-

-

... More
at 2.5 m deep

75.02

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

2

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Concrete Road

916.52

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Bus Route

12.24

-

-

... More
at 2.5m deep

2

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Concrete Road

396.2

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
150mm D/F 90o Bend

1

-

-

... More
Non Bus Route

-

-

-

... More
Backfill Envelope (Sidefill)

488.26

-

-

... More
at 4.5 m deep

44

-

-

8

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
For manholes of pipes upto 1500 mm dia

5

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.0m deep

17

-

-

1

-

-

... More
at 1.5 m deep

4161.5

-

-

... More
Concrete Road

231

-

-

... More
Non Bus Route

21

-

-

... More
at 1.5m deep

67

-

-

... More
at 2.0m deep

29

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

32

-

-

30

-

-

... More
Non Bus Route

-

-

-

... More
For the points Underground/ Surface Assets along the roads

37

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

90

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Asphalt Road

250.35

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Bus Route

-

-

-

... More
450 mm D/F 90o Bend

2

-

-

... More
at 3.5 m deep

68.4

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

95

-

-

... More
at 4.5 m deep

73.06

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bus Route

13.14

-

-

... More
at 3 m deep

5

-

-

... More
Non Bus Route

2665.55

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all excavation, refillingwatering and ramming etc. complete

-

-

-

... More
Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
150mm D/F C.I cut pipe - 1.0m long

1

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
at 4.0m deep

1

-

-

... More
110mm dia upto a depth of 1.0m

2430

-

-

... More
Road Cutting

-

-

-

... More
110mm dia upto a depth of 1.0m

8079

-

-

... More
Non Bus Route

-

-

-

... More
at 2 m deep

362

-

-

... More
Bedding

163.24

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1 m deep

21

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Bill No.4C-Strengthening of sewer collection system in South Coovum Road SPS Commanding Area (DEPOT 63), AREA - V

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Asphalt Road

1365.9

-

-

... More
160mm dia upto a depth of 1.5m

554

-

-

... More
at 4 m deep

148

-

-

... More
Backfill Envelope (Sidefill)

456.36

-

-

... More
Dismantle Joint

-

-

-

... More
Bill No.3-Strengthening of sewer collection system in walltax road SPS, Northwall road SPS and Malaiyappan street SPS commanding Area (Depot-54), Area-V

-

-

-

... More
600mm dia CI pipe

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Bus Route

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 3.0m deep

16

-

-

... More
at 1 m deep

47.32

-

-

... More
at 2.0m deep

4

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

4

-

-

... More
Bus Route

-

-

-

... More
Bus Route

472.22

-

-

... More
Non Bus Route

326

-

-

... More
1.05mx 0.9m

-

-

-

... More
450 mm D/F 90oDuck Foot Bend

2

-

-

... More
Concrete Road

1790

-

-

... More
at 2.0m deep

6

-

-

... More
Bus Route

120

-

-

14

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Asphalt Road

1638

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
150mm DN Sluice valve

1

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
at 2.5 m deep

102

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

1

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
at 3.5 m deep

5

-

-

... More
Non Bus Route

804.52

-

-

... More
Hire charges for diesel pumpset for 5HP

704

-

-

... More
Cutting C.I Pipes

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

14

-

-

... More
at 1.5m deep

26

-

-

... More
2 to 5 km

4.2

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

53

-

-

... More
at 3.5m deep

15

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Concrete Road

713.7

-

-

... More
at 2.5m deep

6

-

-

... More
at 4.0m deep

1

-

-

... More
110mm dia upto a depth of 1.0m

653

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all excavation, refillingwatering and ramming etc. complete

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc 2km

-

-

-

... More
at 3.0m deep

10.18

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 3.0m deep

7

-

-

... More
For the points Underground/ Surface Assets along the roads

45

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 4.5 m deep

5

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
at 5.5m deep

4

-

-

... More
at 3.0m deep

3

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1320

-

-

... More
Bedding

123.99

-

-

... More
Non Bus Route

3199.14

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

5

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
715/600mm OD/ID DWC PE or PP pipe

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

29

-

-

... More
at 3.5 m deep

81

-

-

32

-

-

... More
at 2.5 m deep

101.6

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

16.5

-

-

... More
Bus Route

-

-

-

... More
Backfill Envelope (Sidefill)

151.94

-

-

... More
Concrete Road

2195

-

-

... More
at 2.0m deep

2.27

-

-

... More
at 1.5m deep

16

-

-

... More
Bedding

114.59

-

-

... More
at 4.5m deep

1

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
110mm dia upto a depth of 1.0m

230.4

-

-

... More
For end concrete

287.9

-

-

... More
Testing of CI pipes with hydraulic testing equipment by filling with water (including cost of water @ Rs.60/KL) and testing to recoended pressure in convenient streches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete.

-

-

-

... More
160mm dia upto a depth of 1.5m

3103

-

-

... More
110mm dia upto a depth of 1.0m

15

-

-

... More
at 2.5 m deep

305.25

-

-

... More
Road Cutting

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
150mm D/F C.I cut pipe - 1.5m long

1

-

-

... More
Non Bus Route

2038.71

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
250mm X80mm D/Soc/Fl Tee

2

-

-

... More
As per Rate analysis done in Anchor Block Rates for DWC 23.xlsx

-

-

-

... More
at 1.5 m deep

154

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For the points Underground/ Surface Assets along the roads

19

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5 m deep

15

-

-

... More
700mm dia CI pipe

-

-

-

... More
at 4.5 m deep

61

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

3

-

-

... More
State Highways/ National Highways

155.71

-

-

776

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

817.17

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
State Highways/ National Highways

114

-

-

... More
at 2 m deep

396.34

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Bedding

127.53

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

5

-

-

... More
1.05mx 0.9m

-

-

-

71

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

221.05

-

-

... More
Bus Route

18.48

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
at 2 m deep

99.57

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
at 3.5m deep

2

-

-

... More
Asphalt Road

1497.65

-

-

... More
For the points Underground/ Surface Assets along the roads

72

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering wi

-

-

-

... More
110mm dia upto a depth of 1.0m

2799

-

-

... More
Asphalt Road

686.9

-

-

... More
at 4.5 m deep

114

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

211

-

-

... More
Bus Route

14.62

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Bus Route

144.27

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
250mm X 150mm A/Flange C.I Radial Tee

1

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
700 mm Dummy Flange

2

-

-

... More
at 3.0m deep

3

-

-

... More
Road Cutting Work

-

-

-

... More
Bus Route

782

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Non Bus Route

225.98

-

-

... More
Non Bus Route

1166.9

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

149

-

-

... More
at 3.5m deep

3

-

-

... More
at 4.0m deep

4

-

-

... More
450mm D/Soc CI 22.5o Bend

4

-

-

... More
Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.

-

-

-

... More
110mm dia upto a depth of 1.0m

346

-

-

... More
at 5.5m deep

6

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Asphalt Road

400

-

-

... More
Asphalt Road

8432.26

-

-

... More
250mm DN Sluice valve

1

-

-

22

-

-

... More
at 2.0m deep

7

-

-

... More
Bus Route

-

-

-

528

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

-

-

-

... More
at 3 m deep

26

-

-

64

-

-

5

-

-

... More
Delivery Main 1

-

-

-

... More
Non Bus Route

115.2

-

-

... More
at 4.0m deep

4

-

-

... More
at 2.0m deep

1

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
250mm D/F C.I cut pipe - 1.0m long

1

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Cutting CI Pipes

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

1

-

-

... More
250mm dia D/F pipes

33

-

-

... More
at 3.0m deep

3

-

-

... More
for 500mm valve connection upstream

-

-

-

... More
For the points Underground/ Surface Assets along the roads

91

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth ofpipe/s inside sewer manhole using suitable plugging system andinstallation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per theinstructions of Engineer-in-Charge and keeping the manhole freefrom seepage and removal of bypass by deplugging the mouth ofpipe inside sewer manhole and removal of by pass system andmaking the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications anddirections of the Engineer.

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
60 x 60 x 150cm

50

-

-

... More
at 1.5 m deep

110

-

-

... More
at 2.5 m deep

24

-

-

... More
Non Bus Route

1324

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
at 4.5m deep

1

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Bus Route

-

-

-

... More
200 mm Double Air valve

4

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
150mm D/F C.I cut pipe - 1m long

3

-

-

... More
Brick Machine holes

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
For the points Underground/ Surface Assets along the roads

63

-

-

... More
Non Bus Route

2178.93

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Bus Route

278.98

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

3

-

-

... More
Bed Block for Valve Chamber

0.03

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all exca

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bus Route

6.74

-

-

... More
at 4.5m deep

6

-

-

... More
For Delivery Main

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

391

-

-

... More
at 2.0m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
at 1.5m deep

40

-

-

... More
Bedding

12.69

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 1.5m deep

11.34

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

3

-

-

12

-

-

19

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth ofpipe/s inside sewer manhole using suitable plugging system andinstallation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per theinstructions of Engineer-in-Charge and keeping the manhole freefrom seepage and removal of bypass by deplugging the mouth ofpipe inside sewer manhole and removal of by pass system andmaking the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications anddirections of the Engineer.

-

-

-

... More
at 2.0m deep

9

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

505.39

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection

-

-

-

... More
For manholes of pipes upto 1200 mm dia

9

-

-

... More
Hire charges for diesel pumpset for 5HP

1760

-

-

5

-

-

315

-

-

... More
at 1.5m deep

4.26

-

-

... More
Non Bus Route

705.62

-

-

... More
at 3.0m deep

6.79

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bill No.6D-Strengthening of Sewer Collection System in Royapuram SPS commanding Area (Depot 56) Area-V

-

-

-

... More
Asphalt Road

562.54

-

-

5

-

-

... More
Non Bus Route

924.54

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

2

-

-

... More
700mm D/Soc CI 45º Bend

6

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 3.5m deep

10

-

-

50

-

-

... More
at 2.5m deep

1

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
300mm DN Sluice valve

2

-

-

... More
at 4.0m deep

6

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

33

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 3 m deep

20

-

-

... More
Non Bus Route

75.29

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

2542.71

-

-

10

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.5 m deep

513

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

10

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 4.5 m deep

61.34

-

-

... More
250mm X 150mm A/Soc C.I Tee

1

-

-

... More
at 4.5m deep

5

-

-

... More
Cutting DWC Pipes

-

-

-

... More
at 1.5m deep

35.44

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
Bedding

195.06

-

-

... More
1.05mx 0.9m

-

-

-

18

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Class-LA 250mm Diameter

1000

-

-

... More
Cutting DWC Pipes

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

11

-

-

254

-

-

... More
at 2 m deep

190

-

-

... More
at 1.5m deep

3

-

-

... More
at 2 m deep

74.6

-

-

... More
for the Point underground / suface assets along the roads

2071

-

-

... More
For manholes of pipes upto 1200 mm dia

3

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
For manholes of pipes upto 1200 mm dia

5

-

-

... More
Non Bus Route

86.01

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3 m deep

148.39

-

-

... More
at 1m deep

8

-

-

90

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
RTK survey

-

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.0m deep

5

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Road Cutting

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

20

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
at 3.0m deep

7

-

-

... More
at 4.5 m deep

21.55

-

-

... More
Hire charges for diesel pumpset for 5HP

1440

-

-

... More
Backfill Envelope (Sidefill)

544.63

-

-

... More
at 3.5m deep

1

-

-

... More
at 2.0m deep

9

-

-

... More
at 3.5m deep

3.96

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Backfill Envelope (Sidefill)

422.84

-

-

... More
Brick Machine holes

-

-

-

2

-

-

... More
at 1.5m deep

6

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
at 2.5m deep

1

-

-

... More
for 500mm valve connection downstream

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

493.7

-

-

... More
at 3 m deep

5

-

-

... More
700 mm x 400 mm A/Soc C.I Tee

2

-

-

... More
at 2.0m deep

2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For the points Underground/ Surface Assets along the roads

58

-

-

... More
Non Bus Route

-

-

-

... More
at 2 m deep

43.8

-

-

... More
Brick Machine holes

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 2.5m deep

7

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
150mm Dia scour valve

1

-

-

... More
Non Bus Route(250mm)

15.3

-

-

... More
at 1.5m deep

3

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

4

-

-

... More
160mm dia upto a depth of 1.5m

105.6

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

23

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
500 mm Dia sluice valve

3

-

-

... More
Pipe laying - less than 2 Km

0.44

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 2.0m deep

4

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

935.72

-

-

... More
at 1.5m deep

233

-

-

... More
1.05mx 0.9m

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

5360

-

-

... More
at 4.0m deep

2

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
For Bed Block

1

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

1

-

-

... More
Backfill Envelope (Sidefill)

184.35

-

-

... More
Cutting DWC Pipes

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Pipe laying - 2 to 5 Km

5.32

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes

-

-

-

... More
Bus Route

-

-

-

... More
Testing of M.S./C.I./P.V.C./D.I pipes with hydraulic testing equipment by filling with water(including cost of water @ Rs.60/KL) and testing to recommended pressure in convenient stetches and attending the bursts if any occured during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete for the 500mm dia pipe.

2570

-

-

... More
1.05mx 0.9m

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Pipe laying - 5 - 15 Km

2

-

-

... More
Non Bus Route

13694.8

-

-

... More
at 3 m deep

53

-

-

... More
Bus Route

-

-

-

... More
at 3.5m deep

5

-

-

... More
600mm dia MS encasing pipe for various thickness including cost of driving pit, thrust bed/wall and receiving pit to the depth of 0m to 2m excluding the cost of MS pipes

33

-

-

... More
Non Bus Route

-

-

-

... More
Concrete Road

76.51

-

-

... More
at 1.5 m deep

65

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

5

-

-

... More
at 3.0m deep

13.58

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

684.34

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Hire charges for diesel pumpset for 5HP

272

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 2.5m deep

23

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
Backfill Envelope (Sidefill)

61.92

-

-

... More
BILL NO. 5F - Strengthening of Sewer Collection System in Tondiarpet 'B' SPS commanding Area, Area-V

-

-

-

... More
160mm dia upto a depth of 1.5m

2019

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

23.12

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

2258

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Backfill Envelope (Sidefill)

430.92

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

918.96

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
110mm dia upto a depth of 1.0m

154

-

-

... More
Backfill Envelope (Sidefill)

458.31

-

-

... More
700 mm

12

-

-

... More
at 2 m deep

353.9

-

-

... More
160mm dia upto a depth of 1.5m

200

-

-

... More
Bedding

79.97

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

1514.11

-

-

... More
Non Bus Route

5

-

-

55

-

-

... More
400mm dia CI pipe

3

-

-

... More
at 3.5m deep

3

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

773.5

-

-

... More
at 3.5m deep

3.96

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4 m deep

139

-

-

... More
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for

-

-

-

... More
at 3 m deep

104

-

-

... More
Bedding

320.63

-

-

... More
at 6m deep

1

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
80mm Sluice Valve for isolation of AV

2

-

-

... More
Non Bus Route

2268

-

-

... More
at 1.5m deep

26

-

-

... More
at 3.5m deep

12

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5 m deep

37

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Cutting C.I Pipes

-

-

-

... More
at 1.5 m deep

268.1

-

-

... More
at 2.5 m deep

50

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.5 m deep

194.35

-

-

... More
Non Bus Route

-

-

-

69

-

-

... More
Non Bus Route

669.54

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
at 4.5 m deep

50

-

-

... More
450 mm collars

2

-

-

176

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.0m deep

3

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2 m deep

273

-

-

120

-

-

... More
at 2 m deep

60

-

-

... More
at 4.5m deep

2

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 1.5m deep

26

-

-

... More
at 2 m deep

26.34

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
As per RA Sheet, Bypassing_RA

-

-

-

... More
110mm dia upto a depth of 1.0m

34

-

-

25

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
at 1.5m deep

13

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 3.0m deep

2

-

-

5

-

-

... More
For 150mm valve connection downstream

-

-

-

... More
Non Bus Route

-

-

-

... More
160mm dia upto a depth of 1.5m

8

-

-

... More
80 mm Dia Double Air valve

2

-

-

... More
For 150mm Scour valve

-

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
at 3.5m deep

10

-

-

... More
1.05mx 0.9m

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

417.16

-

-

... More
Brick Machine holes

-

-

-

... More
Asphalt Road

211.77

-

-

... More
250 mm dia

3.06

-

-

... More
500 mm DN Sluice valve

2

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

119

-

-

224

-

-

47

-

-

... More
at 4.5 m deep

5

-

-

... More
Bus Route

-

-

-

... More
at 2.5m deep

3

-

-

... More
For 250mm valve connection downstream

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
700mm D/Soc CI 22.5º Bend

6

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.0m deep

16

-

-

... More
For manholes of pipes upto 1200 mm dia

11

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Asphalt Road

943.5

-

-

... More
Non Bus Route

-

-

-

... More
Road Cutting

-

-

-

... More
at 3.5m deep

1

-

-

1376

-

-

30

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Construction of RCC Riving Pit/ Receiving Pit for on both side for inspection and maintance purpose as directed engineer in charge

-

-

-

... More
at 3 m deep

15

-

-

4049

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

1

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
at 2.5m deep

5.66

-

-

... More
400 mm

8

-

-

... More
Bus Route

-

-

-

4

-

-

... More
Non Bus Route

515.12

-

-

... More
Bus Route

-

-

-

... More
Bus Route

-

-

-

50

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fa

-

-

-

... More
As per Rate analysis done in Data for CS.xlsx and Data for CS BR.xlsx (2023-2024)/Sheet Name-PC MH

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

2

-

-

... More
Bus Route

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
250 mm dia

1.36

-

-

... More
Non Bus Route

2481.96

-

-

... More
at 1.5m deep

11

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

2308.84

-

-

40

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Bedding

112.2

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Non Bus Route

14

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.5m deep

16

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

3134.84

-

-

... More
For manholes of pipes upto 1200 mm dia

10

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
For Point underground surface assets

87

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 1.5 m deep

1146

-

-

... More
Cutting asphaultic concrete road by using power pnumetic compressor machines .

1232.5

-

-

... More
Non Bus Route

-

-

-

28

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

4

-

-

... More
at 1.5m deep

2

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

63

-

-

... More
Concrete Road

440

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

2

-

-

... More
Non Bus Route

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

1

-

-

... More
at 2.5m deep

3

-

-

... More
110mm dia upto a depth of 1.0m

1587

-

-

... More
Non Bus Route

13.94

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
60 x 60 x 150cm

198

-

-

... More
250mm D/F C.I cut pipe - 1.0m long

2

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
250mm Non Return valve

1

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Hire charges for diesel pumpset for 5HP

1456

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
110mm dia upto a depth of 1.0m

3063

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

5

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.0m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Bus Route

-

-

-

... More
Road Cutting

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
For manholes of pipes upto 1200 mm dia

4

-

-

207

-

-

... More
Bus Route

474.55

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for PCC works excluding centering, shuttering, compacting, curing, finishing etc complete.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
160mm dia upto a depth of 1.5m

86

-

-

... More
1.05mx 0.9m

-

-

-

25

-

-

... More
at 2 m deep

35

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
250mm X 150mm A/Flange C.I Radial Tee

1

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
715/600mm OD/ID DWC PE or PP pipe

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
400 mm DN Scour valve

2

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.0m deep

7

-

-

... More
Bus Route

28.13

-

-

... More
Bill No.7-Strengtening of sewer collection system in Sydenams road SPS & Langs Garden SPS commanding area (Depot-58 and 61), Area-V

-

-

-

... More
Non Bus Route

1980

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5 m deep

209.16

-

-

... More
at 1.5m deep

9

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fa

-

-

-

... More
150mm D/F 90oDuck Foot Bend

1

-

-

... More
450 mm D/F C.I cut pipe - 2.0m long

2

-

-

... More
Using 5HP Diesel pumpset

960

-

-

... More
Bus Route

-

-

-

... More
at 1.0 m deep

107

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Bus Route

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Dismantle Joint

-

-

-

... More
Non Bus Route

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 2.5 m deep

160

-

-

... More
at 3 m deep

70

-

-

... More
at 3.5 m deep

9.1

-

-

... More
at 2.0m deep

7

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

4

-

-

... More
for 5 Hp

2500

-

-

16

-

-

... More
400 mm F/Spi Tail Piece

2

-

-

... More
Bus Route

143.27

-

-

... More
450 mm D/F C.I cut pipe - 1.5m long

2

-

-

... More
at 1.5m deep

111

-

-

... More
Non Bus Route

-

-

-

... More
at 3 m deep

27

-

-

... More
at 2.5m deep

10

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Concrete Road

479.76

-

-

... More
at 2.5m deep

1

-

-

85

-

-

... More
Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
State Highways/ National Highways

52.95

-

-

... More
Asphalt Road

6763.48

-

-

... More
160mm dia upto a depth of 1.5m

252

-

-

... More
Non Bus Route

-

-

-

... More
Backfill Envelope (Sidefill)

775.96

-

-

... More
at 2.5 m deep

61

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

13

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 3.5 m deep

28

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bill No.9A-Strengthening of sewer collection system in collection system in Amman Kovil SPS, Area-VI

-

-

-

... More
Bus Route

-

-

-

... More
Bus Route

237.69

-

-

... More
at 3 m deep

7.7

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Asphalt Road

785

-

-

64

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Backfill Envelope (Sidefill)

402.51

-

-

... More
250mm D/F C.I cut pipe - 3m long

3

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
at 5 m deep

24

-

-

... More
at 1.0m deep

6

-

-

... More
Hire charges for diesel pumpset for 5HP

96

-

-

17

-

-

... More
at 3.0m deep

8

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
1.05mx 0.9m

-

-

-

13

-

-

51

-

-

... More
at 1 m deep

317

-

-

... More
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes

-

-

-

185

-

-

... More
at 3.0m deep

6

-

-

... More
at 3 m deep

170.9

-

-

... More
at 1 m deep

121

-

-

... More
at 3.5m deep

16

-

-

... More
at 2.0m deep

15

-

-

... More
Bil No.10A-Strengthening of sewer collection system in Venkatesapuram SPS commanding area (Depot 72) in Area VI

-

-

-

... More
For the points Underground/ Surface Assets along the roads

11

-

-

... More
Non Bus Route

48.64

-

-

... More
160mm dia upto a depth of 1.5m

120

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

52

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
at 3 m deep

10

-

-

... More
at 3.0m deep

5

-

-

... More
at 4.0m deep

2

-

-

... More
at 3.5m deep

4

-

-

... More
450 mm x 300 mm Flange taper

2

-

-

... More
500 mm

17

-

-

... More
at 1.5m deep

100

-

-

2

-

-

... More
at 2.5m deep

16

-

-

... More
Sub Total (excluding GST)

1

-

-

... More
Non Bus Route

-

-

-

... More
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

8.1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
700 mm F/Spi Tail Piece

2

-

-

... More
Non Bus Route

1087.38

-

-

70

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.5 m deep

264.7

-

-

... More
1.05mx 0.9m

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 2.5 m deep

1582

-

-

... More
Bedding

5.2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Road Cutting

-

-

-

... More
160mm dia upto a depth of 1.5m

163

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Bedding

95.29

-

-

... More
Non Bus Route

2

-

-

24

-

-

... More
at 2.5 m deep

36.86

-

-

... More
110mm dia upto a depth of 1.0m

32

-

-

... More
at 2.5 m deep

172

-

-

... More
at 1.5m deep

38

-

-

... More
at 2.0m deep

29.41

-

-

... More
Non Bus Route

2

-

-

... More
at 3 m deep

5

-

-

... More
Non Bus Route

8

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
250mm D/Soc CI 90º Bend

10

-

-

... More
at 2 m deep

184.25

-

-

9

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Jointing the double flanged specials with rubber insertion to the required specifications with M.S bolts and nuts, rubber gasket etc., complete.

-

-

-

... More
at 2.5m deep

9

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 1.5m deep

34.02

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4.5 m deep

14

-

-

1

-

-

... More
at 3.5 m deep

5

-

-

... More
Non Bus Route

-

-

-

1

-

-

... More
Bus Route

31.2

-

-

... More
As per Rate analysis done in Sewer III 23 (1.5 to 2 m) and Sewer III 23 (1.5 to 2 m) NW/Sheet Name-Shoring Rates

-

-

-

... More
at 3.5m deep

3

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Testing of CI pipes with hydraulic testing equipment by filling with water (including cost of water @ Rs.60/KL) and testing to recommended pressure in convenient streches and attending the bursts if any occurred during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete.

-

-

-

... More
Hire charges for diesel pumpset for 5HP

2400

-

-

... More
at 4 m deep

39

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

4

-

-

... More
Brick Machine holes

-

-

-

... More
Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 5.5m deep

1

-

-

... More
As per Rate analysis done in Dismantling Sheet

-

-

-

... More
110mm dia upto a depth of 1.0m

480

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.0m deep

4

-

-

... More
at 2.0m deep

2.27

-

-

... More
at 3.0m deep

3.4

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
7.5 Hp

1960

-

-

... More
Bus Route

-

-

-

... More
Bus Route

130

-

-

... More
Backfill Envelope (Sidefill)

376.86

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Bus Route

-

-

-

... More
at 3.0m deep

1

-

-

... More
160mm dia upto a depth of 1.5m

38

-

-

... More
at 3.5 m deep

13

-

-

... More
Construction of RCC Driving Pit (2.0 mx 3.0 m x 3.0 m)

1

-

-

... More
Bus Route

-

-

-

... More
at 4 m deep

122

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Non Bus Route

-

-

-

... More
at 5m deep

3

-

-

... More
at 2.5 m deep

29.9

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 angle for outer frame supports, 25 x 25 x 3 angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

2000

-

-

... More
at 2 m deep

149

-

-

... More
Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

56

-

-

... More
Bus Route

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Delivery Main 2

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 3.5m deep

3.96

-

-

... More
at 4.5m deep

2

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

51

-

-

... More
Bed Block for Duckfoot Bend

0.03

-

-

... More
at 2.0m deep

7.07

-

-

... More
Bus Route

317.2

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
For manholes of pipes upto 1200 mm dia

10

-

-

... More
160mm dia upto a depth of 1.5m

52.8

-

-

... More
Non Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

2.32

-

-

... More
at 2.5m deep

4

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5m deep

117

-

-

... More
350mm x 300 mm D/S taper

2

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all

-

-

-

... More
at 3.5 m deep

30

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Non Bus Route

4084

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Road Cutting

-

-

-

... More
at 1.5m deep

225

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

24

-

-

... More
As per Rate analysis done in Anchor Block Rates for DWC 23.xlsx

-

-

-

... More
Using 7.5HP Diesel pumpset

400

-

-

... More
110mm dia upto a depth of 1.0m

1005

-

-

5

-

-

... More
at 4.0m deep

4

-

-

15

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
250 mm dia

2.38

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Inspection chamber

811

-

-

... More
at 3.5 m deep

49

-

-

... More
at 2.5m deep

23

-

-

... More
Bus Route

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Supply, conveying and fixing CI D/F pipes as per IS:1537 and CI SS/DF specials as per IS 1538

-

-

-

... More
Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 2.5 m deep

87

-

-

... More
at 2.0m deep

16

-

-

... More
Bus Route

0.34

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,s

-

-

-

... More
at 2 m deep

852.1

-

-

... More
250mm D/F 90o Bend

1

-

-

... More
For Rising Main

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2.0m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

1162

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
at 3 m deep

111.34

-

-

... More
Concrete Road

3135.9

-

-

... More
Non Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
60 x 60 x 150cm

21

-

-

... More
For manholes of pipes upto 1200 mm dia

10

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

91

-

-

... More
500 mm Non Return valve

2

-

-

... More
Bus Route

336.2

-

-

... More
Non Bus Route

-

-

-

... More
Cement concrete 1:2:4 using 20 gauge hard broken stone jelly & SRC for plain concrete works including laying raing curing, etc., complete.

-

-

-

... More
Bus Route

312.81

-

-

... More
Non Bus Route

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

340

-

-

... More
Asphalt Road

494.17

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5 m deep

40

-

-

... More
at 2.5m deep

10

-

-

... More
at 1.5 m deep

10

-

-

... More
at 2.5 m deep

203

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
For the points Underground/ Surface Assets along the roads

41

-

-

... More
at 2.5m deep

2

-

-

... More
110mm dia upto a depth of 1.0m

317

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
250mm D/F C.I cut pipe - 1.5m long

1

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
150mm X 100mm Flange Taper

1

-

-

... More
Bus Route

401.26

-

-

... More
1.05mx 0.9m

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Non Bus Route

2

-

-

... More
at 3.5 m deep

47.96

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Non Bus Route

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
For the points Underground/ Surface Assets along the roads

105

-

-

... More
at 2.5 m deep

15

-

-

... More
Non Bus Route

1788.66

-

-

... More
For Non Bus Route : Data for CS/rate-CI For Bus Route :Data for CS BR/rate-CI

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5 m deep

151

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
Non Bus Route

661.04

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Bus Route

-

-

-

3

-

-

... More
Non Bus Route

-

-

-

... More
Above 2.5m

-

-

-

... More
at 1.5m deep

46

-

-

... More
As per Rate analysis done in Data for CS.xlsx /Sheet Name-Labour

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
100mm D/F 90o Bend

1

-

-

... More
Cutting Asphaltic Road

-

-

-

... More
at 4 m deep

130

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

16

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 3.5m deep

15.84

-

-

... More
at 3.5 m deep

42

-

-

... More
1.05mx 0.9m

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5 m deep

233.98

-

-

... More
250mm D/Soc CI 90º Bend

6

-

-

... More
Hire charges for diesel pumpset for 5HP

80

-

-

... More
Inspection chamber

1198

-

-

... More
450 mm

34

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

240

-

-

... More
Bedding

24.74

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bill No.9-Strengthening of sewer collection system in Kolathur SPS, Villivakkam sector A SPS, GKM colony 24A SPS and Dimmaswamy Dargha SPS commanding Area (Depot 64, 65 and 69), Area-VI

-

-

-

... More
at 3.0m deep

18

-

-

... More
600mm dia MS pipe with 12.5mm thickness

33

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Road Cutting

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
250mm F/Spi Tail Piece

1

-

-

42

-

-

... More
at 3.0m deep

2

-

-

... More
Non Bus Route

-

-

-

35

-

-

... More
Non Bus Route

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
at 4 m deep

94.04

-

-

... More
600mm dia CI pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

9

-

-

269

-

-

... More
at 5.5m deep

1

-

-

... More
1.05mx 0.9m

-

-

-

... More
Asphalt Road

700

-

-

... More
at 2.0m deep

10

-

-

... More
at 1.5 m deep

181.2

-

-

... More
at 3.5 m deep

22

-

-

... More
at 4.0m deep

5

-

-

... More
160mm dia upto a depth of 1.5m

699

-

-

... More
at 3.0m deep

2

-

-

... More
110mm dia upto a depth of 1.0m

1108

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
300mm dia CI pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5 m deep

60

-

-

... More
Bus Route

-

-

-

... More
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)

-

-

-

... More
Non Bus Route

990

-

-

... More
For manholes of pipes upto 1200 mm dia

20

-

-

... More
Non Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Concrete Road

4756.8

-

-

... More
Bus Route

10

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
110mm dia upto a depth of 1.0m

346

-

-

... More
For 100mm valve connection downstream

-

-

-

... More
at 2.5m deep

3

-

-

... More
Backfill Envelope (Sidefill)

45.63

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
at 2.5m deep

5

-

-

883

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Bus Route

316

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

4

-

-

... More
For manholes of pipes upto 1200 mm dia

17

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
at 2m deep

19

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
700mm D/Soc CI 45º Bend

6

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
80mmSluicevalve

1

-

-

... More
250mm D/Soc CI 45º Bend

2

-

-

... More
at 2 m deep

28

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 1.5m deep

12

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Concrete Road

464

-

-

... More
Concrete Road

313

-

-

... More
Non Bus Route

2

-

-

... More
Non Bus Route

617.14

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
at 3.5 m deep

5

-

-

... More
Bus Route

-

-

-

... More
at 1.5m deep

3

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

21

-

-

... More
Non Bus Route

750

-

-

125

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 3.0m deep

23

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
at 2.5 m deep

100

-

-

... More
Non Bus Route

-

-

-

... More
400 mm D/F 90o Bend

2

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 4.0m deep

5

-

-

... More
Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

5140

-

-

... More
at 4 m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5 m deep

5

-

-

... More
at 6 m deep

36

-

-

... More
Bill No.3C-Strengthening of Sewer Collection System in Wall Tax Road SPS commanding Area (Depot 54), Area-V

-

-

-

... More
at 2.0m deep

7

-

-

... More
for 7.5 Hp

600

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Bus Route

1

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

3

-

-

... More
Bus Route

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

2

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 3.0m deep

19

-

-

69

-

-

... More
Non Bus Route

153.03

-

-

... More
Hire charges for diesel pumpset for 5HP

1280

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 3.0m deep

15

-

-

... More
Backfill Envelope (Sidefill)

432.82

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Bedding

70.32

-

-

... More
60 x 60 x 105cm

898

-

-

... More
Non Bus Route

528.4

-

-

... More
Bill No.-5C-Strengthening of Sewer Collection System in Kathpada SPS commanding Area, Area-V

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio w

-

-

-

... More
Non Bus Route

-

-

-

... More
at 3 m deep

182

-

-

... More
Road Cutting

-

-

-

... More
Cutting Asphaltic Road - Non Bus Route

952

-

-

... More
at 5 m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5 m deep

47

-

-

... More
at 5m deep

9

-

-

... More
at 3.0m deep

2

-

-

... More
at 4.0m deep

6

-

-

... More
at 1.5m deep

15

-

-

... More
For the points Underground/ Surface Assets along the roads

47

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

30

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

5

-

-

... More
Bus Route

19.64

-

-

3

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
160mm dia upto a depth of 1.5m

87

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.0m deep

70

-

-

... More
at 4.0m deep

6

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

2

-

-

... More
at 3.5m deep

3

-

-

... More
160mm dia upto a depth of 1.5m

13

-

-

... More
Non Bus Route

2

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Construction of RCC Receiving Pit (2.0 mx 3.0 m x 3.0 m)

1

-

-

... More
Non Bus Route

-

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Backfill Envelope (Sidefill)

598.12

-

-

... More
1.05mx 0.9m

-

-

-

16

-

-

... More
at 1.5m deep

4

-

-

... More
at 2.5m deep

1

-

-

... More
Asphalt Road

1370

-

-

... More
Non Bus Route

-

-

-

... More
Asphalt Road

506.32

-

-

7

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Non Bus Route

1212.09

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

4

-

-

... More
for the Point underground / surface assets along the roads

462

-

-

... More
Bus Route

69.15

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

44

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
300mm dia CI pipe

1

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

34

-

-

... More
at 3.5 m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
Bill No.4B-Strengthening of sewer collection system in Law College SPS Commanding Area (DEPOT 57,59 & 60), AREA - V

-

-

-

... More
at 1.0m deep

35

-

-

... More
Bus Route

-

-

-

... More
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm

-

-

-

... More
Bus Route

90.72

-

-

... More
at 2.0m deep

3

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Specials for 80 mm Air valve-100mm x 80mm D/F Taper

2

-

-

... More
Construction of for Air valve chamber including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

... More
at 2 m deep

5

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Backfill Envelope (Sidefill)

270.92

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Bus Route

-

-

-

... More
500mm dia CI pipe

-

-

-

... More
at 2.0m deep

34

-

-

... More
for the Point underground / surface assets along the roads

1017

-

-

... More
1.05mx 0.9m

-

-

-

... More
Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
250mm D/Soc CI 45º Bend

3

-

-

... More
at 1.5m deep

2

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

3590

-

-

... More
150mm D/F C.I cut pipe - 0.5m long

1

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc (2m to 5m)

-

-

-

... More
at 2.0m deep

4

-

-

110

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.0m deep

2

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 1.0m deep

1

-

-

... More
at 3.5m deep

1

-

-

... More
at 1.5m deep

12

-

-

38

-

-

... More
Bedding

93.66

-

-

340

-

-

... More
Wet mix 100mm with M20 grade

1340

-

-

... More
250mm dia

15

-

-

... More
at 2.5 m deep

62.42

-

-

... More
Non Bus Route

-

-

-

... More
at 3 m deep

210

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
at 1.0m deep

2

-

-

... More
Asphalt Road

85

-

-

... More
at 2.5m deep

11

-

-

... More
at 4 m deep

29.79

-

-

... More
at 4.5 m deep

5

-

-

... More
Non Bus Route

237.24

-

-

... More
at 2.5m deep

18

-

-

... More
Non Bus Route

-

-

-

... More
500mm dia CI pipe

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For manholes of pipes upto 1200 mm dia

82

-

-

... More
Non Bus Route

-

-

-

... More
150mm dia Pressure Gauge and Vaccum guage including all accessories as per specification (For Suction and Delivery to be mounted on wall on Teak Wood Board)

1

-

-

... More
For end concrete

111.88

-

-

... More
Concrete Road

97.9

-

-

... More
Provinding testing of corrogate design stainless steel expansion bellows with flanges 15mm axial movement, 300 mm overall length with tie roads, nuts etc.PN-1.6

-

-

-

... More
Supply Laying & Jointing 450 mm dia CI S/S pipes (A class) with EDPM rubber gaskets including earth work excavation in hard stiff clay, black cotton, hard red earth, shales, murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning includng refilling the trenches, disposal of surplus earth etc; complete at an average depth of 1.5m

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 4.5 m deep

30

-

-

... More
For Non Bus Route : Data for CS/rate-CI For Bus Route :Data for CS BR/rate-CI

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
1.05mx 0.9m

-

-

-

278

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Concrete Road

783

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 4.5 m deep

112

-

-

... More
at 1.0m deep

34

-

-

... More
Asphalt Road

2565

-

-

... More
at 1.5 m deep

51

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Bil No.9C-Strengthening of sewer collection system in collection system in Villivakkam Sector-A SPS, Area-VI

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 2.0m deep

10

-

-

... More
at 3.0m deep

4

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

1

-

-

... More
Non Bus Route

-

-

-

... More
at 1.5 m deep

2473.1

-

-

... More
Bedding

91.43

-

-

... More
Backfill Envelope (Sidefill)

4131.92

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Backfill Envelope (Sidefill)

366.73

-

-

... More
Bus Route

2.04

-

-

... More
Bus Route

-

-

-

... More
7.5 Hp

384

-

-

... More
Non Bus Route

-

-

-

... More
at 4 m deep

202

-

-

... More
at 4 m deep

56

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

1

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
at 1 m deep

717.4

-

-

... More
For manholes of pipes upto 1200 mm dia

75

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
700 mm

1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Concrete Road

2465.23

-

-

... More
250mm Diameter Dismantle Joint

1

-

-

5

-

-

... More
Road Cutting

-

-

-

... More
at 2.5 m deep

5

-

-

... More
160mm dia upto a depth of 1.5m

330

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
State Highways/ National Highways

822.6

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 2.5 m deep

10

-

-

... More
at 4.5 m deep

159

-

-

... More
Bus Route

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 5.5 m deep

5

-

-

... More
at 2.5 m deep

45

-

-

... More
Non Bus Route

-

-

-

... More
State Highways/ National Highways

140.64

-

-

... More
Non Bus Route

-

-

-

... More
RM drop specials at grit well

-

-

-

... More
Bus Route

-

-

-

... More
at 2.0m deep

25

-

-

... More
Bus Route

-

-

-

... More
Hire charges for diesel pumpset for 5HP

2400

-

-

... More
Non Bus Route

30

-

-

... More
Bill No.5B-Strengthening of Sewer Collection System in Bojaraja Nagar SPS commanding Area (Depot-53), Area-V

-

-

-

... More
at 4.0m deep

4.53

-

-

... More
450mm D/Soc CI 45o Bend

2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

10

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 1.5 m deep

771

-

-

... More
Bil No.10C-Strengthening of sewer collection system in Decastor road SPS commanding area (Depot 73) in Area VI

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
at 4 m deep

83

-

-

... More
Asphalt Road

240

-

-

... More
at 2.5 m deep

20.9

-

-

... More
at 2.5m deep

2

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

80.6

-

-

... More
700mm dia CI pipe

1

-

-

... More
Electromagnetic Flow Meter conforming to ISO 17025 Standard shall be a velocity sensing Electromagnetic type, microprocessor based signal converter, sealed housing, flanged tube meter for 1.0 Mpa working pressure, manufactured to highest standard available for mag-meters, equipped with minimum six digit digital totalizers, reading in units of kiloliters and shall be accurate within 0.5% of Measured value, shall operate within a range of 0.3m/sec to 4 m/sec and be constructed as follows:Meter tube (Sensor) shall be fabricated from stainless steel tube and use class PN10 flat face carbon street flanges in accordance with IS 1538. These flanges shall be welded to the flow tube. The internal and external of the meter tube shall be blasted to near white and lined with hard rubber /Polyurethane/PTFE preferably by SBR or EPDM. Meter tube shall have a constant nominal inside diameter offering no obstruction to the flow. The accuracy should be inclusive of linearity, hysteresis, repeatability, temperature and pressure effects. Coil Housing shall be fabricated from stainless steel/SS304/Die cast Aluminium/Carbon Steel with Anticorrosive paint for corrosion resistance and welded to the tube providing a completely sealed environment for all coils, electrode connections and wiring harness capable of submerged or buried operation. Signal Converter shall be pulsed DC coilexcitation type with auto zeroing. The signal converter shall be remotely mounted away from the meter. The converter shall indicate direction of flow and provide a flow rate indication and a total of flow volume for both forward and reverse directions. The converter shall provide an isolated 4-20 mA output into minimum 500-ohm load and a frequency output of a maximum of 0-10 KHZ and a scaled pulse output. The microprocessor based signal converter shall have a self-diagnostic test mode and a backlit display that continuously displays “Rate of Flow” and “Total Volume.”Converter shall be supplied with a programmable low flow drop out and empty pipe zero return. The signal converter housing should be die-cast aluminium with glass window. The converter cum transmitter should be fully programmable form the front facia. The programming should be user friendly, self- prompting menu driven. Flow meter test calibration certificate should be provided with life cycle test certificate from FCRI/NABL accredited lab.

-

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
at 5m deep

3

-

-

35

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Bus Route

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
60 x 60 x 105cm

593

-

-

... More
Backfill Envelope (Sidefill)

61.94

-

-

... More
Temporary bypassing of sewer including Plugging the mouth ofpipe/s inside sewer manhole using suitable plugging system andinstallation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per theinstructions of Engineer-in-Charge and keeping the manhole freefrom seepage and removal of bypass by deplugging the mouth ofpipe inside sewer manhole and removal of by pass system andmaking the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications anddirections of the Engineer.

-

-

-

... More
Backfill Envelope (Sidefill)

207.49

-

-

... More
Jointing the double flanged specials with rubber insertion to the required specifications with M.S bolts and nuts, rubber gasket etc., complete.

-

-

-

70

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Bus Route

-

-

-

... More
160mm dia upto a depth of 1.5m

249

-

-

... More
Non Bus Route

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 4.5 m deep

30

-

-

... More
at 1.5 m deep

45

-

-

... More
60 x 60 x 105cm

776

-

-

21

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.

-

-

-

... More
at 4.5m deep

2

-

-

... More
at 2.5m deep

4

-

-

... More
1.05mx 0.9m

-

-

-

... More
Supply, laying and jointing CI S/S pipes LA-class with EDPM rubber gaskets including earth work excavation in hard stiff clay,black cotton, hard red earth,shales,murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning including disposal of surpulus earth, refilling the trenches etc, complete at an average depth of 2.0m. for night work

-

-

-

... More
Bus Route

-

-

-

29

-

-

... More
For Non Bus Route : Data for CS/rate-CI For Bus Route :Data for CS BR/rate-CI

-

-

-

... More
Non Bus Route

-

-

-

... More
600mm OD/ID DWC PE or PP pipe

-

-

-

... More
Bedding

146.84

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

7

-

-

... More
160mm dia upto a depth of 1.5m

119

-

-

... More
Bedding

41.69

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 4.5m deep

1

-

-

... More
1.05mx 0.9m

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Asphalt Road

352.8

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

-

-

-

... More
State Highways/ National Highways

12

-

-

... More
at 5m deep

4

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Non Bus Route

-

-

-

... More
450mm D/Soc CI 22.5o Bend

3

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

183

-

-

34

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
110mm dia upto a depth of 1.0m

608

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 2.5 m deep

22

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
For end concrete

322.78

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

211

-

-

... More
Concrete Road

481.67

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 2 m deep

138

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Non Bus Route

2731.89

-

-

... More
110mm dia upto a depth of 1.0m

53

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5m deep

10

-

-

... More
Non Bus Route

-

-

-

... More
at 2 m deep

10

-

-

... More
at 2 m deep

80.22

-

-

... More
100mm D/F C.I cut pipe - 0.5m long

1

-

-

... More
at 3.0m deep

1

-

-

... More
600mm dia CI pipe

2

-

-

... More
at 1 m deep

96.44

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

4

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Asphalt Road

2019

-

-

... More
at 3 m deep

89.28

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
at 1.5 m deep

22

-

-

... More
Backfill Envelope (Sidefill)

1663.12

-

-

... More
250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 3.5 m deep

360

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Bill No.5D-Strengthening of Sewer Collection System in Chetty Thottam SPS commanding Area (Depot 52), Area-V

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
at 3 m deep

71

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Backfill Envelope (Sidefill)

523.96

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
at 3.0m deep

10

-

-

... More
160mm dia upto a depth of 1.5m

1201

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
State Highways/ National Highways

171

-

-

... More
at 1.5m deep

12

-

-

... More
Backfill Envelope (Sidefill)

10.68

-

-

... More
Bedding

168.71

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
Non Bus Route

2

-

-

... More
Non Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Using 5HP Diesel pumpset

3040

-

-

... More
100mm D/F C.I cut pipe - 1m long

1

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
at 1.5m deep

26

-

-

... More
Non Bus Route

-

-

-

... More
at 4.5 m deep

83

-

-

... More
Non Bus Route

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 4.0m deep

2

-

-

... More
Bus Route

74.2

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
for 5 Hp

1800

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 4.5m deep

1

-

-

50

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
358/300mm OD/ID DWC PE or PP pipe

-

-

-

... More
Construction of chamber for valves including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

... More
at 1.5m deep

10

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
597/500mm OD/ID DWC PE or PP pipe

-

-

-

... More
250mm F/Spi Tail Piece

1

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
at 2.0m deep

12

-

-

... More
60 x 60 x 105cm

315

-

-

... More
Concrete Road

192.38

-

-

... More
Non Bus Route

489.87

-

-

... More
100mm DN Sluice valve

1

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
at 2.5 m deep

5

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
at 2 m deep

40

-

-

... More
100mm D/F 90oDuck Foot Bend

1

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
Backfill Envelope (Sidefill)

717.44

-

-

... More
at 3 m deep

122

-

-

... More
Bill No.4D-Strengthening of sewer collection system in Borderthotam SPS Commanding Area (DEPOT 63), AREA - V

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

16.18

-

-

... More
at 1.5m deep

8

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I.cover with frame including stacking of useful materialincluding bricks duly cleaned from mortar near the siteand disposal of unserviceable materials into railwaydumps within 50m lead including all excavation, refillingwatering and ramming etc. complete

-

-

-

... More
at 1.5m deep

13

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)

-

-

-

... More
For Non Bus Route : Data for CS/rate-CIFor Bus Route :Data for CS BR/rate-CI

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Non Bus Route

-

-

-

... More
at 2.0m deep

19

-

-

... More
For end concrete

1550.42

-

-

735

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

14

-

-

... More
250mm D/F C.I cut pipe - 0.5m long

1

-

-

... More
at 1.5 m deep

1259

-

-

... More
Bedding

14.33

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.

-

-

-

... More
Bil No.10-Strengthening of sewer collection system in Venkatesapuram SPS Commanding area (Depot-72), Area-VI

-

-

-

... More
700 mm Diameter

2680

-

-

... More
at 2.5 m deep

71

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
250mm DN Sluice valve

1

-

-

... More
Non Bus Route

-

-

-

... More
5 KM TO 15 KM

13.71

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 1.5m deep

2

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Bus Route

-

-

-

... More
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.

-

-

-

... More
110mm dia upto a depth of 1.0m

1735

-

-

... More
Bus Route

3.06

-

-

... More
at 3.0m deep

8

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 2 m deep

49

-

-

... More
at 1.0m deep

5

-

-

... More
at 2.5m deep

20

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
at 1.5m deep

14

-

-

... More
Non Bus Route

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

11

-

-

... More
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.

-

-

-

... More
at 4.5 m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
at 3.5m deep

7

-

-

... More
Non Bus Route

-

-

-

... More
Road Cutting

-

-

-

... More
at 3.5m deep

1

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
400 mm dia

0.57

-

-

... More
Cutting C.I Pipes

-

-

-

... More
Non Bus Route

-

-

-

... More
Cast-Insitu RCC Machine Holes

-

-

-

... More
at 2.5 m deep

83.26

-

-

... More
60 x 60 x 105cm

149

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Road Cutting

-

-

-

... More
Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of sluice valve chamber including providing and fixing L.S. cover and frame of size 60 x 60cm

-

-

-

8

-

-

... More
at 2.5 m deep

240

-

-

... More
Bus Route

1172.55

-

-

... More
Non Bus Route

215.63

-

-

... More
at 4.0m deep

7

-

-

... More
at 4.5m deep

6

-

-

... More
Non Bus Route

304.92

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

136.68

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5mFor Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
For the points Underground/ Surface Assets along the roads

22

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
at 2.5m deep

5

-

-

... More
1.05mx 0.9m

-

-

-

... More
Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and raing to consolidation, etc. at any depth. including jointing of CI specials with molten lead and yarn, Double Flanged specials with rubber insertion with M.S bolts and Nuts

-

-

-

... More
Concrete Road

768

-

-

... More
Precast circular RCC Machine Holes

-

-

-

... More
Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.

-

-

-

... More
at 1.5 m deep

713.67

-

-

... More
700mm D/Soc CI 90º Bend

7

-

-

... More
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the DI pumping main including the cost of shuttering, compaction, curing etc. complete.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 1.0m deep

5

-

-

... More
at 4.5 m deep

5

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

47

-

-

... More
For end concrete

1081.58

-

-

... More
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for

-

-

-

... More
Backfill Envelope (Sidefill)

26

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5 m deep

30

-

-

... More
Asphalt Road

274

-

-

... More
Bus Route

-

-

-

... More
Cutting DWC Pipes

-

-

-

... More
Non Bus Route

-

-

-

... More
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.

-

-

-

... More
Non Bus Route

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

2

-

-

... More
at 1.5 m deep

240.78

-

-

4

-

-

... More
at 2.0m deep

9

-

-

... More
at 1.5 m deep

445.03

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).

-

-

-

... More
at 1.5m deep

12

-

-

... More
Bill No 3D: Strengthening of Sewer Collection System in Malaiyappan Street SPS commanding Area (Depot 55), Area-V

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
at 1.5m deep

11

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying

-

-

-

... More
For manholes of pipes upto 1200 mm dia

3

-

-

... More
160mm dia upto a depth of 1.5m

3504

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

50

-

-

... More
at 2.0m deep

39

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
at 3.5 m deep

40.5

-

-

... More
at 3.0m deep

5.31

-

-

... More
Asphalt Road

80

-

-

... More
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)

-

-

-

... More
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all

-

-

-

... More
Bedding

91.34

-

-

... More
Non Bus Route

-

-

-

... More
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)

-

-

-

... More
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.

-

-

-

... More
480/400mm OD/ID DWC PE or PP pipe

-

-

-

... More
For manholes of pipes upto 1200 mm dia

8

-

-

... More
Non Bus Route

-

-

-

... More
For manholes of pipes upto 1200 mm dia

24

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Bedding

570.39

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

528

-

-

... More
for 7.5 Hp

890

-

-

... More
Non Bus Route

-

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
at 2.5 m deep

415.2

-

-

... More
at 3.5m deep

1

-

-

... More
Non Bus Route

-

-

-

... More
at 2.5m deep

3

-

-

... More
100 mm

4

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Non Bus Route

880.8

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.

-

-

-

... More
Road Cutting

-

-

-

... More
Non Bus Route

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
Using 5HP Diesel pumpset

1520

-

-

... More
Bill No.5-Strengtening of sewer collection system in Tondaiyarpet B SPS, Tondaiyarpet C SPS, Royapuram SPS, Stanley Hospital SPS, Cemetry Road SPS, Muthamil Nagar SPS Chetty Thottam SPS, Bhoojarajan Nagar SPS, Katpada SPS commanding area( epot-49,50,51,52 and 53), RAea-V

-

-

-

... More
at 3.0m deep

5

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
Bus Route

596

-

-

... More
Non Bus Route

-

-

-

... More
Bus Route

-

-

-

... More
110mm dia upto a depth of 1.0m

2034

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

-

-

-

... More
Bill No.8-Supplying and relaying of 200mm dia CI pumping main from VOC Nagar SPS to Purasaivakkam Pumping station in Depot-72,Area-VI

-

-

-

... More
500mm dia CI pipe

7

-

-

... More
160mm dia upto a depth of 1.5m

30

-

-

... More
For Non Bus Route : Data for CS/DWC Pipe-4.5m For Bus Route :Data for CS BR/DWC Pipe-4.5m

-

-

-

... More
Non Bus Route

-

-

-

... More
Non Bus Route

1764.59

-

-

... More
Upto 2.5m

-

-

-

... More
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole

-

-

-

... More
Bus Route

-

-

-

... More
160mm dia upto a depth of 1.5m

507

-

-

... More
at 3.5 m deep

168

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
100mm D/F C.I cut pipe - 1.5m long

1

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online c

-

-

-

... More
Non Bus Route

441.35

-

-

... More
110mm dia upto a depth of 1.0m

3360

-

-

... More
150mm D/F 90o Bend

1

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.

-

-

-

... More
Bus Route

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.