Rural Management And Development Department Tender

... More
The Rural Management And Development Department has issued a formal invitation for competitive bids for Repair And Maintenance Of Rural Connectivity Roads Including Initial Rectification, Periodic Renewal, Emergency Maintenance And 5 Year in North District, Sikkim, with an estimated contract value of Rs. 19,25,60,080. The bid opening date for this tender is 14-03-2025 and the last date for bid submission is 20-03-2025. Interested bidders for Rural Management And Development Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Management And Development Department Tender

Works
Road Construction
Eprocure
Opening Date14 Mar 2025
Closing Date20 Mar 2025
Tender Amount₹ 19,25,60,080 
Notes
Download

Costs

Summary

Repair And Maintenance Of Rural Connectivity Roads Including Initial Rectification, Periodic Renewal, Emergency Maintenance And 5 Year

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

249.84

2125

531117.37

... More
b) Haulage ( Surface road)

62919.99

4

261117.96

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

15750

15

240345

... More
Loading & Unloading

39.82

162

6450.84

-

-

-

... More
Haulage

18021.7

4

74790.06

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects

452.93

10210

4624762.82

... More
LEAD -34KM

-

-

-

... More
Backfilling behind wing wall all complete.

4.32

1356

5860.08

... More
a) Loading and unloading

239.68

85

20487.85

... More
Carriage on Surface road

2935.32

4

12181.58

... More
Carriage of Non- stock materials by mechanical means(Sand):

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Ordinay Soil)

-

-

-

... More
Carriage of stock materials to the work site within 120 km, all complete

-

-

-

... More
a) Loading and unloading

5.17

296

1531.66

... More
Carriage on Surface road

2626.41

4

10899.6

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

-

-

-

... More
Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete. 1:3:6 mix. (1 cement, 3 coarse sand, 6 stone aggregate of 20mm & down size)

248.24

4883

1212188.6

... More
b) Haulage ( Surface road) (30 KM)

9558.12

4

39666.2

... More
Lead=40Km

-

-

-

... More
Carriage of stone /stone dust:

-

-

-

... More
WBM III

-

-

-

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

21

337

7085.4

... More
Haulage

7113.92

4

29522.77

... More
Carriage on Surface road

9802.65

4

40681

... More
Ordinary Kilometer Stone (Precast)

4

2464

9858.68

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

-

-

-

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:Manual means

25.6

1076

27546.11

... More
Loading & unloading

338.87

162

54896.94

... More
Carriage of stone /stone dust:

-

-

-

... More
loading & unloading

23.86

162

3865.32

... More
LEAD -26KM

98.41

162

15942.42

... More
loading & unloading

84.5

85

7223.06

-

-

-

... More
Carraige for Non-Stock materials including Loading and Unloading.(STONE)

165.67

162

26838.54

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
Carriage on unSurface gravel road

1421.2

4

7091.79

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

258.16

2125

548804.27

... More
Carriage of stone

-

-

-

... More
b) Haulage ( Surface road)

6511.2

4

27021.48

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

134.66

2125

286264.27

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

118.33

469

55526.36

... More
Loading/Unloading

2.57

85

219.68

... More
Carriage on Surface road

13016.95

4

54020.34

... More
Loading & Unloading

32.67

296

9678.81

... More
Loading & Unloading

255.07

162

41321.34

... More
Loading & Unloading

12397.81

4

51450.91

... More
Haulage

852.73

4

3538.83

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

240

500

120000

... More
Fixing of 200mtr stone

12

565

6786.36

... More
Haulage

69417.81

4

288083.91

... More
Carriage on Surface road

3910.72

4

16229.49

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects

288.75

10210

2948391.6

... More
haulage

3221.52

4

13369.31

... More
Scarifying the existing bituminous road surface by mechanical means to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

2295

10

23018.85

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

8

337

2699.2

... More
Carraige for Stock materials including Loading and Unloading(Cement )

7.5

296

2221.95

... More
POST RENEWAL

-

-

-

... More
Carriage on Surface road

-

-

-

-

-

-

... More
Providing & laying hand packed stone soling in building works with clean hard selected stones all complete. Details for 10cum (manual means).

7.35

1076

7908.75

... More
Loading & Unloading

132.37

162

21443.54

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

-

-

-

... More
loading & unloading

36.08

85

3084.12

... More
A) (i) COST ESTIMATE FOR INITIAL REHABILITATION WORK(SLIP CLEARENCE)

-

-

-

... More
c) Haulage ( Surface road) (40 KM)

37537.82

4

155781.95

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

9100.88

56

512834.59

... More
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lenstype reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation withM15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cmbelow ground level as per approved drawing)

-

-

-

... More
Loading & Unloading

90.95

162

14733.9

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

63.49

2151

136628.2

... More
Haulage

59858.73

4

248413.73

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

239.2

2221

531303.86

22.63

1356

30690.81

... More
Earthwork in excavation for structures as per drawing and technical specificationsClause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material in ordinary soil.

219.96

469

103218.43

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

100

500

50000

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

44.78

469

21013.46

... More
SPWD ROAD TO REY MONASTERY

-

-

-

... More
Lead=40Km

-

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 etc all complete.Cement mortar 1:3

46.84

4871

228177.2

... More
Maintenance board

1

13742

13742.19

... More
Carriage on Surface road

2529.54

4

10497.59

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

27

1356

36625.5

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

736.56

2125

1565801.34

... More
Plastering with cement mortar of 15mm thick in 1:4 mix i/c curing, compaction etc all complete.

19.05

192

3667.7

... More
Stone Masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202 and 1204 Crushed Rubble Masonry in cement mortar (1:4)

100.88

4039

407495.68

... More
Providing and laying standard "V" shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand , 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 slean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm includung curing, compacting , as per the direction of the Engineer-in-charge As per Clause 13.5 of SOR other works.

1220

1021

1246681.4

... More
Haulage

7557.64

4

31364.21

... More
Maintenance of Earhen shoulder (stripping of excess soil). Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903

473.85

24

11509.82

... More
haulage

475.77

4

1974.45

... More
LEAD -36KM

-

-

-

... More
Loading & Unloading

174.58

162

28281.96

... More
Haulage

246.69

4

1023.76

... More
Throwing of spoils

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

437.06

10210

4462792.74

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

221.48

2221

491954.45

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a liftupto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

7218.75

31

224358.75

... More
b) Haulage ( Surface road)

9466.88

4

39287.53

... More
a) Loading and unloading

63.24

85

5405.76

... More
b) Haulage ( Surface road)

64114.4

4

266074.76

... More
b) Haulage ( Surface road) (50KM)

1925.12

85

165252.3

... More
200 m stone (precast)

14

565

7917.42

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

2090.38

39

83071.7

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:Manual means

17.22

1076

18529.06

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

48.09

1356

65239.17

... More
LEAD -120KM

-

-

-

... More
Loading & Unloading

21.63

296

6408.1

... More
UPPER SYARI TO MIDDLE SYARI

-

-

-

... More
Loading & Unloading

135.51

162

21952.62

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

4650

10

46639.5

... More
Carriage of Stock Materials (Lead 10 km)

-

-

-

... More
Lead-6km

-

-

-

... More
Loading & Unloading

208.27

162

33739.74

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects

486.28

10210

4965359.49

... More
Maintenance of Earthen shoulder (filling with fresh selected soil),Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

2685.15

51

138070.41

... More
b) Haulage ( Surface road)

34080.75

4

141435.11

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)

14954.63

15

228207.65

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

7218.75

56

406776.56

... More
Loading/Unloading

47.04

85

4020.98

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
A) (i) COST ESTIMATE FOR INITIAL REHABILITATION WORK(SLIP CLEARENCE)

-

-

-

... More
Loading & Unloading

27.9

162

4519.8

... More
loading & unloading

11.11

296

3291.42

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

354.38

10210

3618531.65

... More
Carriage of Non-Stock Materials: Stone

-

-

-

... More
Carriage of Non-Stock Materials (Sand) including loading and unloading

41.36

85

3535.45

... More
INITIAL REHABILITATION (PART-A):PROTECTIVE WORKS

-

-

-

... More
Stone aggregates

-

-

-

... More
protective works

-

-

-

... More
haulage

-

-

-

... More
Carriage of sand

-

-

-

... More
SPWD Road to Ahalay School

-

-

-

... More
Haulage

16699.76

4

69304

... More
Haulage

19681.64

4

81678.81

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 by Granular material

16.2

1356

21975.3

... More
Carriage on Surface road

8969.42

4

37223.09

... More
Earthwork in excavation in all kinds of soils in foundation trenches i/c dressing of all sides, watering and ramming i/c disposal of excavated earth upto 30m lead and lift up to 1.5m, disposed earht to be leveled and neatly dressed as per the direction of engineer - in- charge all complete.

81.29

469

38146.15

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

2

916

1832.4

... More
Carriage on Surface road

3141.52

4

13037.31

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

72.45

469

33997.89

... More
Loading & Unloading

27.26

85

2330.18

... More
Stone masonry in 1:5 cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

204.53

4043

827084.55

... More
Restrotation of rain cuts with soil,moorum gravel or mixture of these ,clearing the loose soil,benching of 300mm width laying fresh material in layers not exceeding 250mm

80.1

445

35650.11

... More
Loading & Unloading

406.65

162

65877.3

... More
A) Initial Rehabilitation

-

-

-

... More
HILL SIDE DRAIN

-

-

-

... More
PROTECTIVE WORK , SLIP CLEAREANCE AND RESTORATION RAIN CUTS

-

-

-

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

24

337

8097.6

... More
Loading & Unloading

721.64

162

116905.68

... More
TOTAL OF PROTECTIVE WORK

421.17

39

16737.4

... More
Stone Dust

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D-80 A-12,180 HP and disposal of the same on the valley.

94.38

445

42003.48

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

15750

56

887512.5

... More
Loading/ Unloading

101.1

51

5184.41

... More
HILL SIDE DRAINGE WORK

-

-

-

... More
Carriage on Surface road

-

-

-

... More
B) i)Cost Estimate for Post Renewal Work

-

-

-

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Boulder Apron (GI Wire)

-

-

-

... More
TOTAL COST FOR INITIAL REHABILITATION (PART-A)

-

-

-

... More
TOTAL OF PAVEMENT WORKS

-

-

-

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

3

3517

10553.64

... More
Cement

-

-

-

... More
Loading&Unloading

36

85

3077.28

... More
Carriage of stonechips

-

-

-

... More
a) Loading and unloading

162.78

162

26370.36

... More
Haulage

7143.15

4

29644.07

... More
Loading & Unloading

1293.13

162

209487.06

... More
haulage

145.85

4

605.28

... More
Carriage of stone dust

-

-

-

... More
Haulage

29336.93

4

121748.26

... More
a) Loading and unloading

98.38

85

8409.52

... More
Loading & Unloading

5.42

296

1605.73

... More
Carriage of stoneCHIPS

-

-

-

... More
CONSTRUCTION OF 4 m SPAN CULVERT at RD 0.749 Km and 3.18 Km

2

1118899

2237799.4

... More
haulage

2981.23

4

12372.1

... More
Carriage of Stock Materials (Lead 100 Km)

-

-

-

... More
Carriage of Non-Stock Materials (Sand) including loading and unloading

54.05

85

4620.19

... More
Stone masonry work in cement mortar in foundation complete as per drawing andtechnical specifications Clauses 702, 704, 1202 & 1203. Random Rubble Masonry In cement mortar 1:4

250.2

4039

1010660.38

... More
Loading/ Unloading

44.09

314

13865.42

... More
b) Haulage ( Surface road) (30KM)

1114.35

4

4624.55

... More
Carriage of stone /stone dust:

-

-

-

... More
Carriage of stone from river bed within 45 km radius to the work site, all complete

-

-

-

... More
a) Loading and unloading

1113.41

85

95174.29

... More
Loading & Unloading

116.03

85

9918.24

... More
loading & unloading

511.87

162

82922.94

... More
Haulage

23712.48

4

98406.79

... More
Ordinary Kilometer Stone (Precast)

3

2464

7394.01

... More
Carraige for Stock materials including Loading and Unloading(Cement )

8.49

296

2515.25

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

2295

2

6793.2

... More
Loading/ Unloading

68.05

30

2104.11

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

580.18

39

23056.35

... More
Carriage of Stock Materials

-

-

-

... More
PAVEMENT AND SIDE DRAIN

-

-

-

... More
Haulage

24154.73

4

100242.13

... More
Carriage on Surface road

141.66

2221

314650.94

... More
PAVEMENT WORK

-

-

-

... More
a) Loading and unloading

31.86

296

9438.84

... More
Carriage of Non-Stock Materials (Sand) including loading and unloading

16.45

85

1406.15

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

163.05

39

6479.61

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

202

500

101000

... More
Haulage

148.56

4

616.52

... More
protective works

-

-

-

... More
Carriage of Stock Materials:

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil), Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

268.38

24

6518.95

... More
PWD Road to Namok

-

-

-

... More
loading & unloading

10046.39

4

41692.52

... More
Maintenance of Earthen shoulder (filling with fresh selected soil). Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

3900

51

200538

... More
Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

14

2206

30890.58

... More
LEAD -40 KM

-

-

-

... More
Carriage of stone chips from Rangpo

-

-

-

... More
Haulage

18.63

4

77.31

... More
Carriage of non-stock material stone lead= 20km

98.6

162

15973.2

... More
Providing weepholes in stone masonry with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

88

337

29691.2

... More
Loading&Unloading

3.71

296

1099.12

-

-

-

... More
Haulage

24613.88

4

102147.6

... More
haulage

8632.38

4

35824.38

... More
Carriage of Stone (Lead 20Km)

-

-

-

... More
Haulage

1098.17

4

4557.41

... More
Haulage

7410.5

4

30753.58

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

2625

51

134977.5

... More
Stone aggregates

-

-

-

... More
Loading & Unloading

59.53

314

18720.99

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side

82.34

39

3272.19

... More
Carriage of Non-Stock Materials: Stone Chips

-

-

-

... More
a) Loading and unloading

45.02

314

14157.89

... More
Haulage

21470.87

4

89104.11

... More
Stone Dust

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By manual means. For Grading III Material

641.89

2221

1425749.59

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By manual means. For Grading II Material

194.32

2151

418155.26

... More
KALUK TO BOOM

-

-

-

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
WBM III

-

-

-

... More
b) Haulage ( Surface road)

2388

4

9910.2

... More
RD 2000 to 2100

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

241

500

120500

... More
Haulage

7213.8

4

29937.27

... More
Haulage

143586.46

4

595883.81

... More
b) Haulage ( Surface road) (50 KM)

1910.23

4

7927.45

... More
Carriage on Surface road

5110.6

4

21208.99

... More
Carraige for Non-Stock materials including Loading and Unloading.(STONE)

414.18

162

67097.16

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

36

1356

48834

... More
Carriage of Stone (Lead 10 Km)

-

-

-

... More
HILL SIDE DRAIN

-

-

-

... More
a) Loading and unloading

55.85

314

17563.71

... More
RENEWAL (PART-B):Pavement & Surfacing Work

1520.82

51

78200.56

... More
Loading & Unloading

168.14

162

27238.68

-

-

-

... More
Carriage of sand lead= 34km

-

-

-

... More
Loading & Unloading

1501.81

85

128374.72

... More
b) Haulage ( Surface road)

689.28

4

2860.51

... More
maintenance informatory board

1

13742

13742.19

... More
Tack Coat:Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.)Granular Surface Treated with Primer

15450

15

235767

... More
Haulage

2984.85

4

12387.13

... More
lead = 25kms

238

162

38556

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

4650

2

13764

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
lead = 20kms

228.33

162

36989.46

... More
200M stone (Precast)

20

565

11310.6

... More
Carriage on Surface road

3913.76

4

16242.1

... More
Carriage of Stock Materials:

-

-

-

... More
Loading/ Unloading

71.98

314

22636.27

... More
Loading & Unloading

429.24

162

69536.88

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By manual means. For Grading III Material

526.25

2221

1168890.71

... More
b) Haulage ( Surface road)

32437.58

4

134615.96

... More
Maintainace of Earthern Shoulder (Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903)

3645

51

187425.9

... More
Loading & Unloading

94.43

162

15297.66

... More
b) Haulage ( Surface road)

3601.95

4

14948.09

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

-

-

-

... More
Slip clearance i/c breaking ,removing and throwing of spoils of mixed slip boulders within a lead of 30m and lift 1.5m complete.

1004.71

39

39927.18

... More
Carriage of stock material

-

-

-

... More
Stone masonry work in cement mortar in foundation complete as per drawing andtechnical specifications Clauses 702, 704, 1202 & 1203. Random Rubble Masonry In cement mortar 1:4

13.67

4039

55213.69

... More
Carriage on Surface road

746.41

4

3097.6

... More
a) Loading and unloading

190.32

162

30831.84

... More
Loading & unloading

53.98

314

16976.61

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

210.64

1356

285734.01

... More
Carriage of Stone Chips (120Km)

-

-

-

... More
Haulage

2771.52

4

11501.81

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

15097.5

56

850744.13

... More
loading & unloading

2149.14

4

8918.93

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonry In cement mortar 1:4

361.99

4039

1462226.03

... More
Stone aggregates

-

-

-

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarifiedmaterial with a lift upto 3 m and leads upto 1000 m as per Technical SpecificationClause 301.4.

9880

31

307070.4

... More
loading & unloading

13090.19

4

54324.29

... More
Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete. 1:3:6 mix. (1 cement, 3 coarse sand, 6 stone aggregate of 20mm & down size)

271.35

4883

1325064.46

... More
Loading/ Unloading

714.32

85

61060.07

... More
Cost of Haulage for Non-Stock materials (Sand)

-

-

-

... More
Carriage of stone dust

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading (Bitumen/Emulsion)

-

-

-

... More
Throwing of spoils obtained from slip clearence work 40% of v.i no3.2

-

-

-

... More
Haulage

8637.3

4

35844.8

... More
Carriage of Sand. (Lead 40Km)

-

-

-

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

8617.61

15

131504.73

... More
Loading/ Unloading

398.55

51

20437.64

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By manual means. For Grading II Material

291.77

2151

627854.26

... More
Loading & Unloading

54.52

85

4660.37

... More
a) Loading and unloading

434.73

162

70426.26

... More
Water Bound Macadam Base (Grading-III): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) Using Screening Type-B (11.2mm Agg.)

229.5

2221

509758.52

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

14.35

469

6733.88

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

5625

31

174825

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

13781.25

15

210301.88

... More
Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

4

1591

6367.6

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Cost of haulage

863.98

4

3585.52

... More
Haulage

3385.47

4

14049.7

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
Upper Gelling to Middle Gelling(Baiguney Gelling)

-

-

-

... More
PAVEMENT AND SIDE DRAIN

-

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

318.35

4

1321.15

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

197

500

98500

... More
Ordinery Rock (Manual Means )

280.8

469

131768.21

... More
Tack Coat: Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.) Granular Surface Treated with Primer

6952.5

15

106095.15

... More
lead = 23kms

-

-

-

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)

7218.75

15

110158.13

... More
B (i) COST ESTIMATE FOR POST RENEWAL WORK

-

-

-

... More
Haulage

187.74

4

779.12

... More
Loading/Unloading

65.3

162

10578.6

... More
B).POST REHABILITATION

-

-

-

... More
Carriage of stoneCHIPS

-

-

-

... More
b) Haulage

284.5

4

1180.68

... More
c) Haulage ( Surface road) (20 KM)

10036.5

4

41651.48

... More
Carraige for Stock materials including Loading and Unloading

28.42

296

8419.71

... More
TOTAL COST FOR INITIAL REHABILITATION (PART-A)

-

-

-

... More
Loading & Unloading

554.82

162

89880.84

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

4

916

3664.8

... More
b) Haulage ( Surface road) (50KM)

3978.08

4

16509.03

... More
Haulage (within 3km radius)

4259.89

4

17678.54

... More
Loading & Unloading

47.58

85

4067.14

... More
Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

4245

2

12565.2

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Random Rubble Masonry In cement mortar 1:4

166.74

4039

673531.22

... More
Carriage on Surface road

326.65

4

1355.6

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

312.86

10210

3194601.44

... More
RESHI KUTTUTAR TO AGRIGAON

-

-

-

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Loading&Unloading

27.69

162

4485.78

... More
Haulage

5645.65

4

23429.45

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means. (low porosity)

15450

45

707764.5

... More
Haulage

349.26

4

1449.43

... More
Carriage of Stone Chips (10Km)

-

-

-

... More
Carriage of stone /stone dust from Rangpo:

-

-

-

... More
Haulage

3380.24

4

14028

... More
Back Filling

-

-

-

-

-

-

... More
a) Loading and unloading

78.54

85

6713.6

... More
Providing and Laying RCC M25 in 1:1.2 mix i/c curing, compacting & centering including formwork etc all complete.

4.19

11773

49332.98

... More
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

33

34

1137.84

-

-

-

... More
Providing and laying Random Rubble Stone Masnory in CM 1:4 with clean hard selected stone as per the direction of Enginner in Charge all complete.

201.34

4039

813294.81

... More
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

33

34

1137.84

... More
haulage

54420.7

4

225845.91

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

463.5

10210

4732742.88

... More
Restrotation of rain cuts with soil,moorum gravel or mixture of these ,clearing the loose soil,benching of 300mm width laying fresh material in layers not exceeding 250mm

547.25

445

243564.56

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

213.81

10210

2183149.96

... More
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side)

604.35

39

24016.87

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

162.42

2221

360766.6

... More
Loading/ Unloading

365.98

162

59288.76

... More
Carriage of Stock Materials (Lead 10 Km)

-

-

-

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

11812.5

56

665634.38

... More
LEAD -113KM

-

-

-

... More
Maintenance of Earhen shoulder (stripping of excess soil). Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903

138

500

69000

... More
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lenstype reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation withM15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cmbelow ground level as per approved drawing)

-

-

-

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
Loading & Unloading

242.39

162

39267.18

... More
Maintainace of Earthern Shoulder (filling with fresh soil)(Making up loss ofmaterials/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment)

9990

51

513685.8

... More
Pelling Darap SPWD road 8th Km to Sangyang

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side

375.45

39

14920.38

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

11

337

3711.4

... More
Loading & unloading

525.89

162

85194.18

... More
A) (i) COST ESTIMATE FOR INITIAL REHABILITATION WORK(SLIP CLEARENCE)

-

-

-

... More
TOTAL OF PAVEMENT WORKS

-

-

-

... More
Haulage

20246.86

4

84024.47

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

8617.61

56

485602.32

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. Low Porosity

21262.5

45

974035.13

... More
Carriage of Sand. (Lead 50 Km)

-

-

-

... More
b) Haulage ( Surface road)

7260.86

4

30132.57

... More
haulage

36617.9

4

151964.29

... More
haulage

282.87

4

1173.89

48.17

469

22604.25

... More
Cost of haulage

14467.14

4

60038.63

... More
Ordinery Rock (Manual Means )

206.19

469

96756.72

... More
Carriage of Non-Stock Materials: Sand

-

-

-

... More
Carriage on Surface road

-

-

-

... More
b) Haulage ( Surface road)

9182.25

4

38106.34

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

3.53

916

3234.19

... More
Carriage of Stone Chips (120Km)

-

-

-

... More
PWD road to L/Lingdum

-

-

-

... More
Penlong To Thami Dara

-

-

-

... More
a) Loading and unloading

116.15

162

18816.3

... More
b) Haulage ( Surface road)

65818.37

4

273146.24

... More
Carriage on Surface road

47135.55

4

195612.53

... More
Haulage (within 5km radius)

237.87

4

987.16

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 by granular material

14.4

1356

19533.6

... More
loading & unloading

11.93

85

1019.78

... More
Carriage of Stock Materials (Lead 120 Km)

-

-

-

... More
b) Haulage ( Surface road) (40KM)

7822.17

4

32462.01

... More
Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical specifications Clause 1902: Manual means

47.25

445

21029.56

... More
Haulage

5290.35

4

21954.95

... More
Carriage of stock material lead= 10km

19.15

296

5673.38

... More
Cost of haulage

-

-

-

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

3000

51

154260

... More
Loading & Unloading

525.89

162

85194.18

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

319

500

159500

... More
LOWER LINGTM TO SUBANEYDARA,

-

-

-

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonry In cement mortar 1:4

91.83

4039

370931.45

... More
b) Haulage ( Surface road) (40 KM)

8221.4

4

34118.81

... More
b) Haulage ( Surface road) (50KM)

3199.76

4

13279

... More
Stone Masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202 and 1204 Crushed Rubble Masonry in cement mortar (1:4)

89.08

4039

359810.45

... More
b) Haulage

51.68

4

214.47

... More
Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

4

1591

6367.6

... More
Carriage on Surface road

2356.14

4

9777.98

... More
Loading&Unloading

183.58

162

29739.96

-

-

-

... More
Carriage of Sand. (Lead 40Km)

-

-

-

... More
Fixing of road cautionary Sign Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle post 75mmm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mm x 450mm x 600mm ,600mm below ground level as per drawings and Technical specification clause 801 (900mm)

18

6866

123596.46

... More
Haulage

6477.98

4

26883.62

... More
Throwing of spoils obtained from slip clearance

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
RD 800 to 900

-

-

-

... More
Loading & Unloading

59.7

296

17686.72

... More
Loading & Unloading

1934.89

4

8029.79

... More
Carriage of Non-Stock Materials (Stone )

88.95

162

14409.9

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

8977.5

56

505882.13

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

413.44

10210

4221560.7

... More
Carriage on Surface road

1480.5

4

6144.08

... More
b) Haulage ( Surface road) (50KM)

676.8

4

2808.72

... More
WBM II

-

-

-

... More
Carriage of Stock Materials: Cement and GI wire

-

-

-

... More
Carriage of Non-Stock materials.(Sand) Lead 40km

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

373.87

10210

3817541.71

... More
loading & unloading

1549.91

4

6432.13

... More
Carriage of stock material lead= 34km

-

-

-

... More
Loading & Unloading

5569.71

4

23114.3

... More
Carraige for Non-Stock materials including Loading and Unloading (STONE CHIPS)

672.14

162

108886.68

... More
Carriage on Surface road

2773.8

4

11511.27

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

11812.5

56

665634.38

... More
Carraige of Stock materials (Bitumen/Emulsion) including loading and unloading

69

314

21699.12

... More
Loading & Unloading

19.91

85

1701.91

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

54

2125

114794.82

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

7126.88

56

401599.41

... More
Loading/ Unloading

459.21

51

23548.29

... More
Carriage of Sand. (Lead 10 Km)

-

-

-

... More
Carriage of sand

-

-

-

... More
Premix (Haulage)

7989.5

4

33156.43

... More
Construction of 2m X 2m Cross Drain

-

-

-

... More
Carriage on Surface road

12262

4

50887.3

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

230

500

115000

... More
Haulage

2939.92

4

12200.67

... More
SLIP CLEARANCE WORKS

-

-

-

... More
lead = 5kms

168.47

85

14400.82

... More
Carriage on Surface road

34003.66

4

141115.19

... More
Restrotation of rain cuts with soil,moorum gravel or mixture of these ,clearing the loose soil,benching of 300mm width laying fresh material in layers not exceeding 250mm

227.25

445

101142.16

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

11812.5

15

180258.75

... More
Carriage of sand from river within 34 km radius to work site (Sand)

-

-

-

... More
b) Haulage ( Surface road) (40 KM)

5390.9

4

22372.24

... More
Informatory Sign Board with Logo

1

13742

13742.19

... More
WBM III

-

-

-

... More
a) Loading and unloading

300.35

85

25673.92

... More
Loading&Unloading

80.84

162

13096.08

... More
B (i) COST ESTIMATE FOR POST RENEWAL WORK

-

-

-

... More
Carriage on Surface road

1257.53

4

5218.75

... More
Providing and fixing 'Logo' of PMGSY Project

-

-

-

... More
a) Loading and unloading

1200.51

85

102619.59

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a liftupto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

16500

31

512820

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

5697

51

292939.74

... More
Carriage of sand lead= 26km

26.87

85

2296.85

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth

2.28

469

1069.91

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
Carriage of Non-Stock Materials (Stone )

80.91

162

13107.42

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
haulage

6380.1

4

26477.42

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting.

580

1021

592684.6

... More
Hill side drain clearance( Removal of earth from chocked hill side drain and disposing it on valley side manually)

280

500

140000

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular material)

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By manual means. For Grading II Material

-

-

-

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

972.56

31

30227.24

... More
Carriage on Surface road

424.47

4

1761.55

... More
Carriage of stone chips

-

-

-

... More
Citizen Informatory Board

1

13742

13742.19

... More
Carriage on Surface road

3699.14

4

15351.43

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

159.47

2221

354207.2

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
Carriage of stone chips lead= 36km

-

-

-

... More
Loading/Unloading

12.48

162

2021.76

... More
Haulage

69417.81

4

288083.91

... More
loading & unloading

107.23

4

445

... More
SLIP CLEARANCE

-

-

-

... More
Tack Coat (Loading&Unloading)

66.58

314

20938.08

... More
lead = 36kms

19.49

162

3157.38

... More
b) Haulage ( Surface road)

110227.56

4

457444.37

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

159.47

10210

1628316.27

... More
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

3

1591

4775.7

... More
Carriage on Surface road

125707.98

4

521688.12

... More
lead = 5kms

84.76

85

7245.28

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

16500

56

929775

... More
NH31A to Tumlabong

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

1150

1021

1175150.5

... More
Loading/ Unloading

17.26

30

533.68

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

-

-

-

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

3750

51

192825

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D-80 A-12,180 HP and disposal of the same on the valley.

1554

39

61755.96

... More
b) Haulage ( Surface road) (20 KM)

2376

4

9860.4

... More
Carriage on Surface road

-

-

-

... More
PAVEMENT WORK

-

-

-

... More
Lead=40Km

-

-

-

... More
Loading & Unloading

33.92

296

10049.14

... More
ROAD SIGNAGES

-

-

-

... More
Carriage of stock materials (Cement & Steel) Lead 40 km

-

-

-

... More
Loading & Unloading

191.54

4

794.89

... More
Haulage

141.85

4

588.68

... More
Throwing of spoils from slip clerance lead-5 km

-

-

-

... More
Loading & Unloading

5629.22

4

23361.26

... More
Loading & Unloading

31.02

314

9755.17

... More
Carriage on Surface road

5264.63

4

21848.21

... More
SURFACE RENEWAL WORKS

-

-

-

... More
Haulage

2596.47

4

10775.35

... More
Loading & Unloading

18.73

296

5548.95

... More
Supply, bending and placing in position steel reinforcement in all R.C.C works i/c cost of binding wire all complete.

5.03

9100

45774.46

... More
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)

-

-

-

... More
Loading/Unloading

3.57

162

578.34

... More
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915

41.4

34

1427.47

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
Carriage on Surface road

8111.18

4

33661.4

... More
a) Loading and unloading

106.28

85

9084.81

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

8977.5

15

136996.65

... More
Back Filling (Haulage)

38378.61

4

159271.23

119.34

461

55092.12

... More
TOTAL OF PROTECTIVE WORK

211.91

39

8421.3

... More
Carriage on Surface road

-

-

-

... More
loading & unloading

1087.27

4

4512.17

... More
b) Haulage ( Surface road) (40KM)

7241.04

4

30050.32

... More
Loading & Unloading

20.27

85

1732.68

... More
LEAD -110KM

-

-

-

... More
a) Loading and unloading

37.6

85

3214.05

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

375.05

2221

833042.87

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

1150

1021

1175150.5

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

97.45

2221

216459.96

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading (Bitumen/Emulsion)

-

-

-

... More
Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.All kinds of soil.

225.62

469

105971.46

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

12

337

4048.8

... More
a) Loading and unloading

38.5

4

159.78

... More
Carriage of stock material within 10km radius to work site lead= 10km CEMENT

10.72

296

3175.88

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

4

916

3664.8

... More
Haulage

9632.07

4

39973.09

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Providing weepholes in masonry works with 100mm dia AC pipe all complete.

32

337

10796.8

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

7126.88

15

108756.11

... More
Loading & Unloading

70.97

85

6066.52

... More
LEAD -34KM

-

-

-

... More
Loading&Unloading

189.77

162

30742.74

... More
B (i) COST ESTIMATE FOR POST RENEWAL WORK

-

-

-

... More
RENEWAL (PART-B):Pavement & Surfacing Work

-

-

-

... More
iii) Road Furniture

-

-

-

... More
ROAD FURNITURE

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

403.2

10210

4117026.82

... More
Carriage of Stone

-

-

-

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

650

51

33423

... More
Carriage on Surface road

4390.9

4

18222.24

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness (MSS) composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Bitumen (S-65)

-

-

-

... More
Loading&Unloading

243.99

162

39526.38

... More
Carriage of Non-Stock Materials: Stone Chips

-

-

-

... More
RCR FROM RABONG. TO UPPER DEYTHANG

-

-

-

... More
B) Post Renewal

-

-

-

... More
Carraige for Stock materials including Loading and Unloading(Cement )

6.37

296

1887.18

... More
Carriage of stone

-

-

-

... More
a) Loading and unloading

667.44

85

57052.77

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

12.06

1076

12976.8

... More
Reinforced cement concrete M15 grade 200 m stone (precast) stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

6

565

3393.18

... More
SLIP CLEARANCE

-

-

-

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

44.28

1356

60065.82

... More
a) Loading and unloading

29.88

296

8851.51

-

-

-

... More
Haulage

2446.69

4

10153.76

-

-

-

... More
Haulage (within 3km radius)

3431.23

4

14239.6

... More
TOTAL OF DRAINAGE WORKS

-

-

-

... More
Carriage of Non stock material

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

404.58

10210

4131098.69

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing as per drawing Clause 1701 and Annexure 1700.1

1

13742

13742.19

... More
Carriage of Stone (Lead 20 Km)

-

-

-

... More
b) Haulage (2 KM)

1434.91

4

5954.88

... More
Maintenance of Earthen shoulder (filling with fresh selected soil). Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

2925

51

150403.5

... More
Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

3

2206

6619.41

... More
Carriage of Stock Materials (Lead 120 Km)

-

-

-

... More
a) Loading and unloading

86.95

85

7432.49

... More
Within 5Km radius

-

-

-

... More
LEAD -34KM

-

-

-

... More
Throwing of spoils obtained from slip clearence work 20% of v.i no3.2

-

-

-

... More
Carraige for Non-Stock materials including Loading and Unloading.(STONE)

118.34

162

19171.08

... More
200 m stone (precast)

17

565

9614.01

... More
Tack Coat:Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.)Granular Surface Treated with Primer

10080

15

153820.8

... More
Carriage on Surface road

377.75

4

1567.66

... More
NAMCHI PHONG TO BIKMAT

-

-

-

-

-

-

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

24

337

8097.6

... More
Carriage on Surface road

73935.48

4

306832.24

... More
Carriage on unSurface gravel road

565.25

4

2820.6

... More
Loading&Unloading

31.35

85

2679.8

... More
Carriage of stone /stone dust :

-

-

-

... More
RENEWAL WORKS (PART B)

-

-

-

... More
Carriage on Surface road

45559.34

4

189071.26

... More
Throwing of spoils, Loading and unloading.

621.6

85

53134.37

... More
Lead=40Km

-

-

-

... More
Carriage of stonechips

-

-

-

... More
Loading & Unloading

45.83

85

3917.55

... More
Loading & Unloading

14.33

296

4245.41

-

-

-

... More
Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.All kinds of soil.

622.44

469

292353.84

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502 Low porosity

19451.25

45

891061.76

... More
Loading & Unloading

301.19

162

48792.78

... More
Loading & Unloading

836.15

85

71474.1

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a liftupto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

16500

31

512820

... More
Carriage of Non-Stock materials.(Stone) Lead 40 km

-

-

-

... More
Lead=30 Km

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

60

500

30000

... More
loading & unloading

645.35

4

2678.2

... More
Carriage of Non-Stock Materials: Sand

-

-

-

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

5118.75

15

78112.13

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing as per drawing Clause 1701 and Annexure 1700.1

1

13742

13742.19

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

13781.25

56

776573.44

... More
Throwing of spoils obtained from slip clearence work Lead 10 Km

-

-

-

... More
Loading/ Unloading

78.41

30

2424.44

... More
Haulage

221.19

4

917.94

... More
Carriage of Non-Stock materials.(Stone Chips) Lead 40 km

-

-

-

... More
200M stone (Precast)

22

565

12441.66

... More
Throwing of spoils obtained from slip clearence work

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

-

-

-

... More
a) Loading and unloading

450.52

85

38510.45

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

8617.61

31

267835.32

... More
Carriage on Surface road

1555.4

4

6454.91

... More
Loading/ Unloading

239.52

162

38802.24

... More
Haulage

5155.04

4

21393.42

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

77.34

2221

171793.62

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

354.38

10210

3618480.6

... More
RD 800 to 900

-

-

-

... More
Providing, laying, spreading and compacting stone aggregate of specific size to WBM specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100kN static roller in stages to proper grade and camber applying and brooming, crusable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405, Aggregated (0.109 cum) (A) Manual Means .(WBM-III).

-

-

-

... More
Carriage on Surface road

18223.73

4

75628.48

... More
Carriage of stone dust

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

182.81

2221

406057.64

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

172

500

86000

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects) Using Bitumen 60/70 grade

159.47

10210

1628316.27

... More
LEAD -105KM

18.43

314

5795.87

... More
Carriage on Surface road

25900.56

4

107487.32

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)

11812.5

15

180258.75

... More
Loading/ Unloading

6.26

296

1854.59

... More
WBM GRADE- II-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering andcompacting to the required density grading 2 as per Technical Specification Clause 405.

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness (MSS) composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Bitumen (S-65)

8977.5

236

2118690

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

3587.27

39

142558.11

... More
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914

2700

3

10557

... More
haulage

184.31

4

764.89

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage of Non-Stock Materials: Stone

-

-

-

... More
Loading & Unloading

116.67

85

9972.95

... More
Loading & Unloading

788.84

162

127792.08

... More
Carriage of Non-Stock Materials (Stone) including loading and unloading

35.35

162

5726.7

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

4617

31

143496.36

... More
a) Loading and unloading

29.8

296

8828.55

... More
Carriage on Surface road

339.16

4

1407.51

... More
Carriage of sand from river within 36 km radius to work site (Sand)

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

43.44

1356

58926.36

... More
TOTAL COST FOR INITIAL REHABILITATION (PART-A)

-

-

-

... More
Haulage

7050.75

4

29260.61

... More
Carraige of Stock materials (Bitumen/Emulsion) including loading and unloading

40.5

314

12736.44

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

7875

31

244755

... More
Loading/ Unloading

26.43

85

2259.24

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

472.5

10210

4824640.8

... More
Carriage on unSurface gravel road

1857.25

4

9267.68

... More
PAVEMENT AND SIDE DRAIN

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

880

1021

899245.6

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

62

500

31000

... More
SURFACE DRAINAGE WORKS

-

-

-

... More
haulage

7280.21

4

30212.87

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

316

500

158000

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

8

3517

28143.04

... More
loading & unloading

779.82

4

3236.25

... More
Carriage of Non-Stock Materials (Sand )

26.18

85

2237.87

... More
b) Haulage ( Surface road)

1963.4

4

8148.11

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Carriage of Stone Chips (120Km)

-

-

-

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

947.95

2221

2105565.04

... More
Carriage of Stock Material

-

-

-

... More
Water Bound Macadam Base (Grading-III):Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) Using Screening Type-B (11.2mm Agg.)

230.34

2221

511632.63

... More
b) Haulage ( Surface road) (50KM)

26.46

4

132.04

... More
PAVEMENT WORK

-

-

-

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Carriage of non-stock material stone lead= 25km

-

-

-

... More
Maintenance board

1

13742

13742.19

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

264

337

89073.6

... More
Carriage of Stock Materials Cement and GI wire (Lead 30 Km)

-

-

-

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

240

337

80976

... More
Chewang to Phamtam

-

-

-

... More
Haulage

10559.86

4

43823.42

... More
PRADHAN GAON TO ARITAR

-

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

11

337

3711.4

... More
Carriage of stone chips lead= 26km

53.33

162

8639.46

... More
Haulage

3654.47

4

15166.05

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

819.2

1021

837115.9

... More
Tack Coat Loading&Unloading

24.29

314

7638.72

... More
Loading/Unloading

0.93

296

275.52

... More
Maintainace of Earthern Shoulder (filling with fresh soil)(Making up loss ofmaterials/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment)

3307.5

51

170071.65

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:4)

283.53

4043

1146547.12

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete

36

39

1430.64

... More
RD 2000 to 2100

-

-

-

... More
UPPER SAMSING TO CHANGEY TOKCHI

-

-

-

... More
lead = 36kms

9.74

85

832.58

... More
haulage

-

-

-

... More
Premix Haulage

2914.8

4

12096.42

... More
Carriage of Non-Stock Materials (Stone) including loading and unloading

116.15

162

18816.3

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

2

3517

7035.76

... More
b) Haulage ( Surface road) (30KM)

896.33

4

3719.75

... More
ii) Pavement & Surfacing Work

-

-

-

... More
Loading & Unloading

32.32

314

10163.99

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

457

500

228500

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

3000

51

154260

... More
Carriage on Surface road

3560.25

4

14775.04

... More
Haulage

8866.46

4

36795.81

... More
lead = 26kms

26.86

162

4351.32

... More
Water Bound Macadam (GRADE III) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

168.33

2221

373885.38

... More
Kaluk SPWD Road to Tadong Juabari

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D-80 A-12,180 HP and disposal of the same on the valley.

1929.3

39

76670.38

... More
Cost of Haulage for Stock materials

-

-

-

... More
b) Haulage ( Surface road)

5402.92

4

22422.12

... More
loading & unloading

1285.51

4

5334.87

... More
Carriage of Stone Chips (120Km)

-

-

-

... More
Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911

16

2206

35303.52

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

14954.63

56

842693.4

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

5315.63

15

81116.44

... More
Loading & unloading

32.57

314

10242.61

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

696

39

27659.04

... More
Loading & Unloading

73.89

314

23236.04

... More
a) Loading and unloading

582.86

162

94423.32

... More
b) Haulage (2 KM)

1434.91

4

5954.88

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

5118.75

236

1208025

... More
b) Haulage ( Surface road) (40 KM)

10221.2

4

42417.98

... More
Throwing of spoils all complete

-

-

-

... More
haulage

1570.59

4

6517.95

... More
Carriage on Surface road

3652.05

4

15156.01

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

120

500

60000

... More
Carriage of Stone chips (Lead 40Km)

-

-

-

... More
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

3.53

1591

5619.41

... More
PAVEMENT AND SIDE DRAIN

-

-

-

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.

5315.63

45

243509.01

... More
haulage

1411.97

4

5859.68

... More
Carriage of Cements/steel/Bitumen Emulsion

-

-

-

... More
haulage

4042.16

4

16774.96

... More
Throwing of spoils

-

-

-

... More
Carriage of Sand. (Lead 40 Km)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

59.7

469

28014.82

... More
LEAD -36KM

-

-

-

... More
SURFACE DRAINAGE WORKS

-

-

-

... More
haulage

777.42

4

3226.29

... More
HILL SIDE DRAINGE WORK

-

-

-

... More
Restrotation of rain cuts with soil,moorum gravel or mixture of these ,clearing the loose soil,benching of 300mm width laying fresh material in layers not exceeding 250mm

229.75

445

102254.83

... More
Haulage

15814.28

4

65629.26

... More
Providing and fixing 'Logo' of PMGSY Project

-

-

-

... More
Haulage

40410.47

4

167703.45

... More
Lead=60 Km

-

-

-

... More
WBM II

-

-

-

... More
Loading & Unloading

229.64

85

19629.2

... More
Lead=40Km

-

-

-

... More
Carriage of stone chips lead= 34km

-

-

-

... More
b) Loading and unloading (spoils)

273.36

106

29159.31

... More
Carriage of Stone chips (Lead 40Km)

-

-

-

... More
Carriage on Surface road

80803.8

4

335335.77

... More
TOTAL OF PROTECTIVE WORK

-

-

-

... More
INITIAL REHABILITATION (PART-A):PROTECTIVE WORKS

121.28

469

56909.51

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By manual means. For Grading II Material

134.37

2151

289143.41

... More
Loading & unloading

317.29

162

51400.98

... More
Throwing of spoils within 5 km radius

-

-

-

... More
lead = 26kms

13.43

85

1148

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

281.25

2221

624704.06

... More
Loading/ Unloading

146.71

162

23767.02

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

8977.5

31

279020.7

... More
Loading & Unloading

67.59

314

21255.7

... More
Carriage of stock materials to the work site within 120 km, all complete

-

-

-

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

8

3517

28143.04

... More
Loading & Unloading

429.34

162

69553.08

... More
d) Haulage of Spoils (Kacha road 5KM)

2514.95

4

10437.04

... More
Hill Side Drain

-

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

150.82

4871

734731.7

... More
Tack Coat: Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.) Granular Surface Treated with Primer

10428.75

15

159142.73

... More
Carriage of Stone (Lead 10Km)

-

-

-

... More
a) Loading and unloading

38.2

296

11317.13

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth

15.07

469

7071.75

... More
Loading&Unloading

11.64

296

3448.47

... More
Carriage on Surface road

3840.8

4

15939.32

... More
WBM III

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

566.84

2125

1205005.48

... More
Carriage of Non- stock materials by mechanical means(Sand):

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

138

500

69000

... More
Haulage

613.84

4

2547.44

... More
Carriage on Surface road

32106.91

4

133243.68

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

14568.75

56

820949.06

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading (Bitumen/Emulsion)

-

-

-

... More
Haulage

24232.51

4

100564.92

... More
Water Bound Macadam Base (Grading-III): Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) Using Screening Type-B (11.2mm Agg.)

159.79

2221

354919.37

... More
haulage

2389.61

4

9916.88

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

10080

56

568008

... More
Carriage on Surface road

4228.94

4

17550.1

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
WBM GRADE- II-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering andcompacting to the required density grading 2 as per Technical Specification Clause 405.

108.28

2151

233009.34

... More
a) Loading and unloading

49.09

85

4195.79

-

-

-

... More
haulage

932.22

4

3868.71

... More
a) Loading and unloading

54.05

85

4620.19

... More
INITIAL REHABILITATION WORKS

-

-

-

... More
a) Loading and unloading

108.1

85

9240.39

... More
haulage

795.4

4

3300.91

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means. (low porosity)

13485.94

45

617790.8

92.29

469

43308.01

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

108.28

2221

240511.06

... More
Providing, laying, spreading and compacting stone aggregate of specific size to WBM specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100kN static roller in stages to proper grade and camber applying and brooming, crusable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405, Aggregated (0.109 cum) (A) Manual Means .(WBM-III).

280.61

2221

623282.51

... More
Maintenance of road signs by way of cleaning and repainting of mandatory /requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

1.35

1591

2149.07

... More
Cost of haulage

77780.74

4

322790.07

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

73.81

4062

299845.74

... More
NSH to Lingdok

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

19451.25

15

296826.08

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

208.58

10210

2129734.3

... More
b) Haulage ( Surface road) (40 KM)

6702.2

4

27814.13

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

235.24

2151

506205.22

... More
Haulage

12910.48

4

53578.49

... More
Haulage

113795.62

4

472251.82

... More
Loading/ Unloading

28.42

296

8419.71

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

538.95

2221

1197099.57

... More
lead = 34kms

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil) ,Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

1986.63

51

102152.51

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

195

1021

199264.65

... More
Carriage of Non-Stock Materials (Sand )

34.91

85

2984.11

... More
Ordinary Kilometer stone (Precast)

5

2464

12323.35

... More
Carriage of stone dust

-

-

-

... More
Loading & Unloading

5.54

296

1641.28

... More
Carriage of stone

-

-

-

... More
Carriage of Stock Materials:

-

-

-

... More
Loading & Unloading

824.59

162

133583.58

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

3587.27

39

142558.11

... More
Carraige for Non-Stock materials including Loading and Unloading (STONE CHIPS)

428.51

162

69417.81

... More
Loading & Unloading

146.43

162

23721.66

... More
SPWD Road to Salghari School

-

-

-

... More
RD 2000 to 2100

-

-

-

... More
Carriage on Surface road

23854.19

4

98994.89

... More
Ordinery Rock (Manual Means )

227.71

469

106855.19

... More
a) Loading and unloading

17.23

296

5104.56

... More
Haulage

26304.18

4

109162.35

... More
a) Loading and unloading

417.38

162

67614.75

... More
haulage

1067.53

4

4430.25

... More
Loading & Unloading

680.21

162

110194.02

... More
Carriage of Stock Materials Cement and GI wire (Lead 30 Km)

-

-

-

... More
Carriage of Stock Material

-

-

-

... More
Carriage of Stock Materials (Lead 50 km)

-

-

-

... More
Carriage of Non-Stock Materials (Stone) including loading and unloading

88.88

162

14398.56

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

35

337

11809

... More
Loading & Unloading

883.87

162

143186.94

... More
Carriage on Surface road

3722.4

4

15447.96

... More
Haulage

324

4

1344.6

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

16

337

5398.4

... More
Carriage on Surface road

374.78

4

1555.34

... More
A) (i) Cost Estimate for Initial Rehabilitation Work

-

-

-

... More
Loading & Unloading

58.58

162

9489.96

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing as per drawing Clause 1701 and Annexure 1700.1

1

13742

13742.19

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness (MSS) composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Bitumen (S-65)

8617.61

236

2033755.96

... More
Haulage

22044.96

4

91486.58

... More
Loading & Unloading

40.53

162

6565.86

... More
Carriage of Stock Materials

-

-

-

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

1063.13

31

33041.93

... More
Cost of haulage

2730.59

4

11331.95

... More
Throwing of spoils within 5 km radius

-

-

-

... More
Carraige for Stock materials including Loading and Unloading

11.31

296

3349.22

... More
haulage

143.28

4

594.61

... More
iii) Granular Surface Treated with Primer

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

101.76

4062

413389.82

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Lead=120 Km

-

-

-

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

5200

51

267384

... More
Carriage of Stone Chips (120Km)

-

-

-

... More
Hill side drain clearance( Removal of earth from chocked hill side drain and disposing it on valley side manually)

156

500

78000

... More
a) Loading and unloading

228.1

162

36952.2

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

21262.5

15

324465.75

... More
lead = 5kms

-

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Carriage of Stock Materials (Lead 120 Km)

-

-

-

... More
RESTORATION RAIN CUTS AND VEGETATION CLEARANCE

-

-

-

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil), Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

1790.1

51

92046.94

... More
Backfilling behind abutment,Wing Wall and Return Wall complete as per drawings & technical specification clause andy material

15

1356

20347.5

... More
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910

2

1591

3183.8

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)

15097.5

15

230387.85

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

153.53

4871

747933.68

... More
Tack Coat: Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.) Granular Surface Treated with Primer

13485.94

15

205795.41

... More
loading & unloading

91.61

4

380.18

... More
Carriage on Surface road

-

-

-

... More
Carriage of Cements/steel/Bitumen Emulsion

-

-

-

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

124.03

2221

275494.49

... More
Carriage of Non Stock Material

-

-

-

... More
a) Loading and unloading

717.45

85

61327.63

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

11.36

1076

12223.59

... More
LEAD -26KM

138.21

162

22390.02

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

171.28

2151

368578.41

... More
Carriage of Stock Materials: Cement

-

-

-

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

281.25

10210

2871810

... More
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Technical Specification Clause 202.

90.05

461

41570.68

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

3.6

1356

4883.4

... More
Carraige of Stock materials (Bitumen/Emulsion) including loading and unloading

75.41

314

23713.36

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects

531.56

10210

5427720.9

... More
Stone Masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202 and 1204 Crushed Rubble Masonry in cement mortar (1:4)

75.66

4039

305633.12

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing as per drawing Clause 1701 and Annexure 1700.1

1

13742

13742.19

... More
Carriage of Non Stock Material

-

-

-

... More
Carriage of stone from river bed within 40 km radius to the work site, all complete

-

-

-

... More
a) Loading and unloading

57.99

314

18236.7

... More
Carriage of Non-Stock Materials (Sand )

30.82

85

2634.49

... More
a) Loading and unloading

37.15

296

11006.06

... More
Carriage on Surface road

3412.57

4

14162.17

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 by granular material

10.8

1356

14650.2

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing as per drawing Clause 1701 and Annexure 1700.1

1

13742

13742.19

... More
Carriage of Sand.(Lead 10Km)

-

-

-

... More
b) Haulage ( Surface road) (30 KM)

8938.97

4

37096.73

... More
Carriage of Stock Materials (Lead 130 Km)

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

364.33

2221

809241.64

... More
Carriage of Stone (Lead 40Km)

-

-

-

... More
Haulage

562

4

2332.3

... More
b) Haulage ( Surface road)

6958.36

4

28877.19

... More
Prime coat

-

-

-

... More
Apron Wall (Loading&Unloading)

436.12

162

70651.44

... More
INITIAL REHABILITATION (PART-A):PROTECTIVE WORKS

105.3

469

49413.08

... More
loading & unloading

1082.64

4

4492.96

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage of Stock Materials (Lead 120 Km)

-

-

-

... More
maintenance informatory board

1

13742

13742.19

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

136

500

68000

... More
Loading & Unloading

25.72

296

7619.81

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

4245

10

42577.35

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonry In cement mortar 1:4

417.08

4039

1684757.12

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

36.75

469

17245.31

... More
Haulgae

3344.61

4

13880.13

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

9100.88

15

138879.43

... More
Loading & Unloading

439.36

85

37556.49

... More
a) Loading and unloading

426.57

162

69104.34

... More
B) POST RENEWAL

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete

26.43

39

1050.33

... More
Prime coat (MEDIUM POROSITY) (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

5315.63

56

299535.47

... More
SLIP CLEARANCE WORKS

-

-

-

... More
HILL SIDE DRAINGE WORK

-

-

-

... More
Loading&Unloading

221.55

162

35891.1

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)

16500

15

251790

... More
Loading & Unloading

23.1

314

7264.49

... More
b) Haulage ( Surface road)

8004.33

4

33217.97

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.

175.95

2098

369260.99

... More
b) Haulage ( Surface road)

118850.52

4

493229.66

... More
Carriage of Stone

-

-

-

... More
TOTAL OF DRAINAGE WORKS

-

-

-

... More
a) Loading and unloading

59.7

85

5103.16

... More
Carriage of sand lead= 36km

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

453

500

226500

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

5118.75

31

159090.75

... More
a) Loading and unloading

1654.78

162

268074.36

... More
GI Wire

-

-

-

... More
Providing & laying hand packed stone soling in building works with clean hard selected stones all complete. Details for 10cum (manual means).

4.12

1076

4430.51

... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

750

51

38565

... More
Loading & Unloading

4338.22

4

18003.61

... More
a) Loading and unloading

344.25

85

29426.49

... More
lead = 34kms

-

-

-

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Carriage of Stone (Lead 50 Km)

-

-

-

... More
Carriage of Stock Materials (Lead 30 km)

-

-

-

... More
b) Haulage ( Surface road) (20 KM)

82.74

4

343.37

... More
INITIAL REHABILITATION WORKS (PART A)

-

-

-

... More
SURFACE RENEWAL WORKS

-

-

-

... More
Loading & Unloading

232.68

162

37694.16

... More
loading & unloading

7.61

85

650.08

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
RENEWAL (PART-B):Pavement & Surfacing Work

-

-

-

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

130.13

2125

276634.26

... More
ROAD FURNITURE

-

-

-

... More
Carriage of Stone (Lead 10 Km)

-

-

-

... More
Restrotation of rain cuts with soil,moorum gravel or mixture of these ,clearing the loose soil,benching of 300mm width laying fresh material in layers not exceeding 250mm

545

445

242563.15

... More
LEAD -40KM

-

-

-

... More
Carriage of Stone (Lead 40Km)

-

-

-

... More
Lead=120 Km

-

-

-

... More
INITIAL REHABILITATION WORKS

-

-

-

... More
Providing and laying Random Rubble Stone Masnory in CM 1:4 with clean hard selected stone as per the direction of Enginner in Charge all complete.

227

4039

916946.07

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means. (low porosity)

6952.5

45

318494.03

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth

16.43

469

7709.94

... More
Carriage of Non-Stock Materials: Stone

-

-

-

... More
haulage

-

-

-

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

1.05

1076

1129.82

... More
B) Post Renewal

-

-

-

... More
Throwing of spoils all complete

-

-

-

... More
a) Loading and unloading

43.48

85

3716.24

... More
a) Loading and unloading

30.02

314

9440.69

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

14954.63

31

464789.9

... More
Loading & Unloading

233.34

162

37801.08

... More
CONSTRUCTION OF 4 m SPAN CULVERT

1

1118899

1118899.7

... More
Tack Coat:Tack coat (Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor at required of 0.25 to .3 kg/sqm rate on the prepared bituminous/granular surface cleaned with mechanical broom.)Granular Surface Treated with Primer

9375

15

143062.5

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

14568.75

15

222319.13

... More
haulage

-

-

-

... More
Loading/Unloading

219.15

162

35502.3

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Ordinay Soil)

67.28

469

31571.81

... More
haulage

3995

4

16579.25

... More
Haulage

3908.38

4

16219.78

... More
Water Bound Macadam (GRADE III)Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

265.78

2221

590342.56

... More
Haulage

19496.4

4

80910.06

... More
Water Bound Macadam (Grade-III)

-

-

-

... More
a) Loading and unloading

53.2

314

16730.34

... More
a) Loading and unloading

582.59

85

49800.01

... More
Providing and Laying plum concrete in 1:2:4 mix i/c curing , compacting etc all complete.

57.75

4062

234603.6

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

16.2

1356

21975.3

... More
Loading/ Unloading

1450.37

162

234959.94

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

925

1021

945229.75

... More
Gurung gaon to Assingthang Tourist Village

-

-

-

... More
Carriage of Non-Stock Materials (Stone )

66.71

162

10807.02

... More
b) Haulage ( Surface road)

5320

4

22078

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

3840

51

197452.8

... More
b) Haulage ( Surface road)

23728.72

4

98474.19

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

108

2125

229589.64

... More
Melli Phong to Bikmat

-

-

-

... More
b) Haulage

1138.32

4

4724.03

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

925

1021

945229.75

... More
a) Loading and unloading

717.45

85

61327.63

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

12654

31

393286.32

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

90.39

4062

367200.34

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Carriage of stone /stone dust

-

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:4)

306.28

4043

1238544.25

... More
loading & unloading

71.6

162

11598.39

... More
Loading & Unloading

14.59

296

4322.43

... More
Carriage of stock material within 34km radius to work site lead= 34km CEMENT

-

-

-

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:Manual means

7.35

1076

7908.75

... More
Haulage

310.75

4

1289.61

... More
Providing and laying semi dense bituminous concrete with 40-60 TPH TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects

495

10210

5054385.6

... More
Providing, laying, spreading and compacting stone aggregate of specific size to WBM specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100kN static roller in stages to proper grade and camber applying and brooming, crusable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405, Aggregated (0.109 cum) (A) Manual Means .(WBM-III).

280.55

2221

623142.3

... More
Loading & unloading

613.54

162

99393.48

... More
Cost of Haulage for Non-Stock materials (Stone Chips)

-

-

-

... More
Informatory Sign Board with Logo

1

13742

13742.19

... More
Carriage of Stone

-

-

-

... More
Hill side drain clearance( Removal of earth from chocked hill side drain and disposing it on valley side manually)

150

500

75000

... More
TOTAL OF DRAINAGE WORKS

-

-

-

... More
ii) Drainage Work

-

-

-

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.

5315.63

15

81116.44

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading (Bitumen/Emulsion)

-

-

-

... More
loading & unloading

15.09

162

2444.58

... More
haulage

-

-

-

... More
haulage

1542.91

4

6403.08

... More
PROTECTIVE WORK , SLIP CLEAREANCE AND RESTORATION RAIN CUTS

-

-

-

... More
Loading & unloading

149.1

162

24154.2

... More
Lead=40Km

-

-

-

... More
Carriage of non-stock material stone lead= 23km

-

-

-

... More
Loading & unloading

62.98

314

19805.95

... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means. (low porosity)

10428.75

45

477741.04

... More
ROAD FURNITURE

-

-

-

... More
Carriage of Stock Material

-

-

-

... More
Providing and laying standard "V" shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand , 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 slean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm includung curing, compacting , as per the direction of the Engineer-in-charge As per Clause 13.5 of SOR other works.

1175

1021

1200697.25

... More
Carriage of Non- Stock Materials:mechanical means

-

-

-

... More
a) Loading and unloading

28.45

296

8428.6

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

11.99

1076

12901.48

... More
Loading & Unloading

53.17

314

16720.9

-

-

-

... More
Loading/ Unloading

24.67

296

7308.73

... More
Fixing of Ordinary KM stone

4

2464

9858.68

... More
a) Loading and unloading

93.43

162

15134.85

... More
Loading/ Unloading

705.08

85

60270.24

... More
Prime coat

-

-

-

... More
Loading/Unloading

17.05

296

5051.23

... More
haulage

31311.69

4

129943.51

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

81

2125

172192.23

... More
Haulage

1518.28

4

6300.86

... More
RD 800 to 900

-

-

-

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

2

3517

7035.76

... More
Loading & Unloading

333.37

162

54005.94

... More
b) Haulage ( Surface road)

48656.38

4

201923.98

... More
600 cm Equilateral Triangle

32

4789

153265.28

... More
c) Haulage

4187.04

4

17376.22

... More
PAVEMENT AND SIDE DRAIN

-

-

-

... More
Ordinary Kilometer stone (Precast)

6

2464

14788.02

... More
b) Haulage ( Surface road) (50KM)

7225.94

4

29987.65

... More
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side)

612.27

39

24331.61

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

72

2125

153059.76

... More
Carriage on Surface road

63504.44

4

263543.43

... More
Loading & Unloading

127.53

85

10901.26

... More
Providing and Laying Handpacked stone soling with clean hard selected stone all complete.

2.7

1076

2905.25

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

350

1021

357654.5

-

-

-

... More
Maintainace of Earthern Shoulder, Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

10800

51

555336

... More
Loading & Unloading

1428.5

162

231417

... More
a) Loading and unloading

1323.01

296

391954.94

... More
a) Loading and unloading

108

162

17496

... More
loading & unloading

642.6

4

2666.79

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 etc all complete. PCC M20

2.7

5530

14931.54

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
LEAD -26KM

216.74

162

35111.88

... More
Carriage of Stone (Lead 40 Km)

-

-

-

... More
Loading/ Unloading

97.83

85

8362.51

... More
Throwing of spoils from slip clerance lead-5 km

-

-

-

... More
Providing & laying hand packed stone soling in building works with clean hard selected stones all complete. Details for 10cum (manual means).

5.49

1076

5907.35

... More
TOTAL OF PAVEMENT WORKS

-

-

-

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908

3

3517

10553.64

... More
Loading & Unloading

741.05

85

63344.95

... More
Citizen Informatory Board

1

13742

13742.19

... More
M. Chongrang Mangsabong 7th Km SPWD road to Bhirkuna

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

800

1021

817496

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

233.1

469

109384.51

... More
Carriage on Surface road

13525.5

4

56130.83

... More
haulage

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil). Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

3900

51

200538

... More
Maintenance of Earhen shoulder (stripping of excess soil). Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903

315.9

24

7673.21

... More
RD 800 to 900

-

-

-

... More
Carriage of stock material within 11 km radius to work site lead= 11km CEMENT

8.33

296

2467.82

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404.

308.31

2098

647040.95

... More
b) Haulage ( Surface road)

72083.52

4

299146.61

... More
WBM GRADE- II-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering andcompacting to the required density grading 2 as per Technical Specification

150.61

2151

324094.81

... More
Carriage on Surface road

4864.5

4

20187.68

... More
Haulage

2006.3

4

8326.15

... More
Carriage of Stock Materials (Lead 50 Km)

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By manual means. For Grading II Material

318.94

2151

686318.42

... More
Carriage of sand from river within 26km radius to work site (Sand)

-

-

-

... More
Carriage of stock material lead= 11km

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Throwing of spoils within 5 km radius

-

-

-

... More
a) Loading and unloading

430.31

162

69710.63

... More
PROTECTIVE WORK , SLIP CLEAREANCE, RESTORATION RAIN CUTS AND CONSTRUCTION OF CD

-

-

-

... More
Slip clearance i/c breaking, removing and throwing of spoils of mixed slip with boulders within a lead of 30m and lift of 1.5m complete.

211.26

39

8395.27

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

9.45

1076

10168.39

... More
LOWER THEKABONG TO UPPER THEKABONG

-

-

-

... More
Loading & Unloading

54.61

296

16178.76

... More
PAVEMENT RENEWAL

-

-

-

... More
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.

10560

31

328204.8

... More
Carriage on Surface road

15578.53

4

64650.9

... More
LEAD -36KM

-

-

-

... More
Haulage

664.91

4

2759.38

... More
Haulage

1800.07

4

7470.29

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Carriage of Sand. (Lead 40 Km)

-

-

-

... More
Throwing of spoils all complete

-

-

-

... More
Haulage

11182.75

4

46408.41

... More
Ordinery Rock (Manual Means )

113.24

469

53139

... More
Carriage of stone dust

-

-

-

... More
Cost of haulage

9660.31

4

40090.29

... More
Carraige for Non-Stock materials including Loading and Unloading (STONE CHIPS)

734.58

162

119001.96

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

-

-

-

... More
Loading & Unloading

7.2

296

2133.07

... More
Carriage on Surface road

5118.75

56

288441.56

... More
WBM GRADE- II-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering andcompacting to the required density grading 2 as per Technical Specification Clause 405.

-

-

-

... More
a) Loading and unloading

66.7

314

20975.82

... More
i) PROTECTIVE WORK

-

-

-

... More
Haulage

648.82

4

2692.6

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular material)

32.57

1356

44181.21

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

60.51

469

28394.92

... More
Haulage

5223.52

4

21677.61

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Carriage of Sand. (Lead 50Km)

-

-

-

... More
Haulage

10470.52

4

43452.66

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Description Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical

106.5

445

47399.96

... More
c) Haulage ( Surface road) (40 KM)

38256.32

4

158763.73

... More
Carriage of Non Stock Material

-

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Hill Side Drain

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D-80 A-12,180 HP and disposal of the same on the valley.

152.5

445

67873.18

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
Loading & unloading

257.54

162

41721.48

... More
Carriage of stone /stone dust

-

-

-

... More
INITIAL REHABILITATION

-

-

-

... More
Carriage of stone

-

-

-

... More
Hill Side Drain

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

580

500

290000

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

-

-

-

... More
Consumption of Cements/steel/Bitumen Emulsion

-

-

-

... More
Throwing of spoils, Loading and unloading.

771.72

85

65966.63

... More
Loading & Unloading

279.7

85

23908.76

... More
haulage

40493.72

4

168048.94

... More
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

3

916

2748.6

... More
Carriage of Stock Materials (Lead 30 km)

-

-

-

... More
600 mm Equilateral Triangle

24

4789

114948.96

... More
a) Loading and unloading

598.35

162

96932.7

... More
PROTECTION WALL(BREAST WALL & RETAINING WALL)

-

-

-

... More
SURFACE DRAINAGE WORKS

689

1021

704068.43

... More
Carraige for Stock materials including Loading and Unloading

37.15

296

11006.06

... More
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects)

289.41

10210

2955092.49

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

100

500

50000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.