Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction shoulders with approved material providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification

-

-

-

... More
Only Shoulder Portion (Earthen)

1398.6

358349

256.22

... More
Only Shoulder Portion (GSB)

699.3

1089201

1557.56

... More
Profile Correction with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

9271.51

2375545

256.22

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

-

-

-

... More
CTSB

3441.87

7053762

2049.4

... More
CTB

2753.5

5969613

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

27534.94

1261375

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

27534.94

420183

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

27534.94

5917258

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

9733.6

40394

4.15

... More
Carriage on Un Surface road

385.49

1923

4.99

... More
Loading & Unloading

96.37

28551

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB )

-

-

-

... More
Carriage on Surface road

3025

12553

4.15

... More
Carriage on Un Surface road

1100

5489

4.99

... More
Loading & Unloading

275

81471

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

3025

12553

4.15

... More
Carriage on Un Surface road

1100

5489

4.99

... More
Loading & Unloading

275

81471

296.26

... More
Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

177545.28

736812

4.15

... More
Carriage on Un Surface road

27314.66

136300

4.99

... More
Loading & Unloading

4405.59

376589

85.48

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

142036.49

589451

4.15

... More
Carriage on Un Surface road

21851.77

109040

4.99

... More
Loading & Unloading

3524.48

301272

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

37395.47

155191

4.15

... More
Carriage on Un Surface road

5753.15

28708

4.99

... More
Loading & Unloading

927.93

79319

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
900mm equilateral triangle

18.67

128887

6904.55

... More
600mm Circular

9.33

58236

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

6

14542

2423.72

... More
Fixing of 200mtr stone

28

19528

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1406.1

309271

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

930

4145372

4457.39

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

699.3

1384914

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

6293.7

6477916

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

5357

22231

4.15

... More
Carriage on Un Surface road

1948

9720

4.99

... More
Loading & Unloading

487

144278

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

7459.07

30955

4.15

... More
Carriage on Un Surface road

2712.39

13534

4.99

... More
Loading & Unloading

368.53

31502

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

29731.79

123386

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

737.76

63063

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

17921.52

74374

4.15

... More
Carriage on Un Surface road

6516.92

32519

4.99

... More
Loading & Unloading

740.56

119970

162

... More
Protection Work

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

1079.23

506440

469.26

... More
Stone Soiling for road works Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

80.34

75780

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

80.34

392818

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

936.11

4245161

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

127.92

163706

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

87.06

118085

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

305.28

393087

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

380

128212

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

1624.15

6740

4.15

... More
Carriage on Un Surface road

590.6

2947

4.99

... More
Loading & Unloading

147.65

43742

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

12557.5

52113

4.15

... More
Carriage on Un Surface road

4566.36

22786

4.99

... More
Loading & Unloading

453.17

38737

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

17884.36

74220

4.15

... More
Carriage on Un Surface road

2751.44

13729

4.99

... More
Loading & Unloading

422.63

36125

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

20649.54

85695

4.15

... More
Carriage on Un Surface road

7508.92

37469

4.99

... More
Loading & Unloading

853.29

138232

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT

-

-

-

... More
1X1X1.5

7

4469034

638433.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.