Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date19 May 2021
Closing Date1 Jul 2021
Tender Amount₹ 1,69,26,924 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with material obtained from Roadway cutting

-

-

-

... More
Construction of Embankment with approved material deposite at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical specification Clause 301.5

180

-

114.8

... More
Compacting Original Ground.

-

-

-

... More
(ii) Compacting original ground supporting subgrade.

-

-

-

... More
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers for subgrade construction as per Technical Specification Clause 303.5.2.

300

-

40.63

... More
Granular Sub-Base with well graded material (Table 400.1)

-

-

-

... More
(A) By Mix in Place Method.

-

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix-in-place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per technical specification clause 401.

-

-

-

... More
(i) For Grading I Material.

37.5

-

1353.68

... More
Water Bound Macadam with Crushable Screenings

-

-

-

... More
(2) WBM Grading 2

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

-

-

-

... More
(A) By manual means.

22.5

-

1992.51

... More
(3) WBM Grading 3

-

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

-

-

-

... More
(A) By manual means.

22.5

-

2061.95

... More
Prime Coat

-

-

-

... More
(i) Low porosity

-

-

-

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.

231.25

-

36.08

... More
Tack Coat

-

-

-

... More
(iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer and cleaned with Hydraulic broom as per Technical Specification Clause 503.

231.25

-

12.28

... More
20mm thick Open-Graded Premix Carpet

-

-

-

... More
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2

-

-

-

... More
By Manual Means

231.25

-

138.88

... More
Seal Coat

-

-

-

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
Type B(ii) Bitumen (S-65)

231.25

-

43.26

... More
Construction of earthen shoulder.

-

-

-

... More
Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compavted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1.

22.69

-

224.53

... More
Loading and unloading of Lime, Aggregates, Stone boulder,Brick Aggregates etc. by manual means

-

-

-

... More
i) Loading of aggregates

105.72

-

86.92

... More
ii) Loading of sand

15.76

-

43.46

... More
Loading and unloading of Lime, Aggregates, Stone boulder,Brick Aggregates etc. by Mechanical means

-

-

-

... More
iii) Unloading of aggregates

105.72

-

43.46

... More
iii) Unloading of sand

15.76

-

28.14

... More
Loading and unloading of Bitumen drums by manual means including a lead upto 30m

-

-

-

... More
i) Loading of Bitumen drums by manual means including a lead upto 30m

1.04

-

131.73

... More
ii) Unloading of Bitumen drums by manual means including a lead upto 30m

1.04

-

117.82

... More
Haulage excluding Loading and Unloading

-

-

-

... More
Haulage of materials by tipper excluding cost of loading, unloading and stacking

-

-

-

... More
Case-I : Surfaced road

-

-

-

... More
a) Sand lead distance 50 Km

1450

-

4.16

... More
b) Aggregates ad distance 50 Km

9200

-

4.16

... More
c) Bitumen ad distance 120 Km

124.45

-

4.16

... More
Case-III : Katcha Track

-

-

-

... More
a) Sand lead distance 15 Km

435

-

5

... More
b) Aggregates lead distance 15 Km

2760

-

5

... More
c) Bitumen lead distance 0.0 Km

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps ,Dewatering,Shoring and shuttering and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Ordinary soil

-

-

-

... More
Upto 3 m depth

774.89

-

282.69

... More
3 m to 6 m depth

234.6

-

335.69

... More
Ordinary rock

516.59

-

353.36

... More
Hard rock (requiring blasting)

156.4

-

625.68

... More
Hard rock (blasting prohibited)

-

-

-

... More
Filling annular space around footing in rock as per technical specification Clause 1203.4.3.

-

-

-

... More
P.C.C grade M 15 (Nominal mix 1:2.5:5)

18.34

-

4408.54

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

-

-

-

... More
P.C.C grade M 15

-

-

-

... More
Nominal mix (1:2.5:5)

15.94

-

4408.54

... More
R.C.C. grade M 30

82.96

-

6863.97

... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

13.27

-

71587.68

... More
Sub Structure

-

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

-

-

-

... More
For height upto 5 m

-

-

-

... More
R.C.C. grade M30

52.09

-

6863.97

... More
For height 5 to 10 m

39.07

-

6863.97

... More
For height above 10 m

39.07

-

6863.97

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

20.84

-

71587.68

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

156

-

331.67

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
Granular material

260.83

-

1118.55

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

43.09

-

1044.7

... More
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel complete including all accessories as per drawing and Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of MoRTH Specifications.

428

-

393

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1

-

-

-

... More
Super Structure

-

-

-

... More
Providing Bailey Bridge Complete Set as per Bailey Bridge Speecification

20

-

408382

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211

-

-

-

... More
Nominal mix (1:2.5:5)

3.83

-

4341.32

... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

12.18

-

5735.36

... More
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawing and approved specifications to be installed by manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer’s instructions for installlation and as per technical specifications Clause 1207.2.5

13

-

12095.88

... More
Filler Joint

-

-

-

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications

11.6

-

6449.43

... More
River Bank Protection Work

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

-

-

-

... More
For 2 m height of Gabion toe wall for Length of 20 m on both side of abutment wall

-

-

-

... More
Loading of stone aggregates

-

-

-

... More
M15 grade concrete

30.49

-

86.92

... More
M25 grade concrete

10.96

-

86.92

... More
M30 grade concrete

235.37

-

86.92

... More
Bituminous Macadam

9.65

-

86.92

... More
Premix carpet

4.6

-

86.92

... More
Seal coat

1.02

-

86.92

... More
Unloading of stone aggregates

-

-

-

... More
M15 grade concrete

30.49

-

43.46

... More
M25 grade concrete

10.96

-

43.46

... More
M30 grade concrete

235.37

-

43.46

... More
Bituminous Macadam

9.65

-

43.46

... More
Premix carpet

4.6

-

43.46

... More
Seal coat

-

-

-

... More
Loading of sand

-

-

-

... More
M15 grade concrete

18.29

-

43.46

... More
M25 grade concrete

5.48

-

43.46

... More
M30 grade concrete

117.69

-

43.46

... More
Bituminous Macadam

2.41

-

43.46

... More
Seal coat

1.02

-

43.46

... More
Unloading of sand

-

-

-

... More
M15 grade concrete

18.29

-

28.14

... More
M25 grade concrete

5.48

-

28.14

... More
M30 grade concrete

117.69

-

28.14

... More
Bituminous Macadam

2.41

-

28.14

... More
Seal coat

-

-

-

... More
Loading of cement and stacking

-

-

-

... More
M15 grade concrete

10.48

-

113.28

... More
M25 grade concrete

4.92

-

113.28

... More
M30 grade concrete

112.45

-

113.28

... More
Unloading of cement and stacking

-

-

-

... More
M15 grade concrete

12.2

-

113.28

... More
M25 grade concrete

7.43

-

113.28

... More
M30 grade concrete

185.68

-

113.28

... More
Loading steel and stacking

42.16

-

123.81

... More
Unloading steel and stacking

42.16

-

123.81

... More
Loading Bitumen Drums and stacking

-

-

-

... More
Bituminous Macadam

0.61

-

131.73

... More
Premix carpet

0.25

-

131.73

... More
Seal coat

0.12

-

131.73

... More
Unloading Bitumen Drums and stacking

-

-

-

... More
Bituminous Macadam

0.61

-

117.82

... More
Premix carpet

0.25

-

117.82

... More
Seal coat

0.12

-

117.82

... More
Cost of Haulage Excluding Loading and Unloading

-

-

-

... More
Surfaced Road

-

-

-

... More
a) Cement lead distance 125 Km

8310.64

-

4.16

... More
b) Stone Aggregates lead distance 50 Km

14604.9

-

4.16

... More
c) Sand lead distance 650 Km

7244.75

-

4.16

... More
d) Steel lead distance 125 Km

2740.35

-

4.16

... More
e) Bitumen lead distance 125 Km

117.44

-

4.16

... More
Unsurface road

-

-

-

... More
a) Cement lead distance 0.0 Km

-

-

-

... More
b) Stone Aggregates lead distance 15 Km

1081.88

-

5

... More
c) Sand lead distance 15 Km

656.18

-

5

... More
d) Steel lead distance 0.0 Km

-

-

-

... More
e) Bitumen lead distance 0.0 Km

-

-

-

... More
GST 12% on Civil Works

1

-

763020

... More
Labour Cess 1%

1

-

71215

... More
GST on Steel parts 18%

1

-

1470175

... More
Labour Cess 1%

1

-

96378



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.