Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date31 Jan 2024
Closing Date19 Feb 2024
Tender Amount₹ 13,76,87,752 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

18720

55411

2.96

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

-

-

-

... More
Only Shoulder Portion (Earthen)

998.4

255810

256.22

... More
Only Shoulder Portion (GSB)

499.2

958928

1920.93

... More
Profile Correction with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1(CTB), (CTBS), (MSS)

7343.85

1881641

256.22

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

2457

5035375

2049.4

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

1965.6

4261440

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

19656

900441

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

19656

299950

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

19656

4224074

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

9012.28

37400

4.15

... More
Carriage on Un Surface road

275.18

1373

4.99

... More
Loading & Unloading

68.8

20381

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB)

-

-

-

... More
Carriage on Surface road

11032

45782

4.15

... More
Carriage on Un Surface road

788

3932

4.99

... More
Loading & Unloading

197

58363

296.26

... More
Stone Chips For CTSB

-

-

-

... More
Carriage on Surface road

297355.97

1234027

4.15

... More
Carriage on Un Surface road

19498.75

97298

4.99

... More
Loading & Unloading

3144.96

268831

85.48

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

11032

45782

4.15

... More
Carriage on Un Surface road

788

3932

4.99

... More
Loading & Unloading

197

58363

296.26

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

237884.77

987221

4.15

... More
Carriage on Un Surface road

15599

77839

4.99

... More
Loading & Unloading

2515.97

215064

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

134501.78

558182

4.15

... More
Carriage on Un Surface road

4106.93

20493

4.99

... More
Loading & Unloading

662.41

56622

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

13.33

92058

6904.55

... More
ii) 600mm Circular

6.67

41601

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

4

9694

2423.72

... More
Fixing of 200mtr stone

20

13949

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

1005.9

221247

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

96

427909

4457.39

... More
H.S. Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

4992

5138115

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

18032

74832

4.15

... More
Carriage on Un Surface road

1288

6427

4.99

... More
Loading & Unloading

322

95395

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

26334.2

109286

4.15

... More
Carriage on Un Surface road

1726.83

8616

4.99

... More
Loading & Unloading

234.62

20055

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

44367.4

184124

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

469.25

40111

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

67662.57

280799

4.15

... More
Carriage on Un Surface road

4436.89

22140

4.99

... More
Loading & Unloading

504.19

81679

162

... More
Protection Work (Retaining Wall, Breast Wall)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

899.8

422241

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

67.61

63774

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

67.61

330582

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

796.05

3610009

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

105.99

135641

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

76.56

103843

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

258.48

332826

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

315

106281

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

7109.2

29503

4.15

... More
Carriage on Un Surface road

507.8

2533

4.99

... More
Loading & Unloading

126.95

37610

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

59144.24

245448

4.15

... More
Carriage on Un Surface road

3878.31

19352

4.99

... More
Loading & Unloading

368.36

31487

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

35489.41

147281

4.15

... More
Carriage on Un Surface road

2327.17

11612

4.99

... More
Loading & Unloading

352.87

30163

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

97287.91

403744

4.15

... More
Carriage on Un Surface road

6379.54

31833

4.99

... More
Loading & Unloading

724.95

117441

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT (1X1X1.5)

4

2713108

678277.05

... More
RCC SLAB CULVERT (1X2X2)

2

1539255

769627.8

... More
T10-Jhusing 5th Mile to NH10

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.49

43185

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

14649

43361

2.96

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

-

-

-

... More
Only Shoulder Portion (Earthen)

976.6

250224

256.22

... More
Only Shoulder Portion (GSB)

488.3

950959

1947.49

... More
Profile Correction with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

757.79

194161

256.22

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

... More
(CTBS)

2403.35

4925429

2049.4

... More
Cement along with Crushed Rock or combination as per clause 401.2.2 and Table 400-I Grading-I in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

-

-

-

1922.69

4168404

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

19226.81

880780

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

19226.81

293401

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

19226.81

4131842

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

7806.09

32395

4.15

... More
Carriage on Un Surface road

269.18

1343

4.99

... More
Loading & Unloading

67.29

19936

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB )

-

-

-

... More
Carriage on Surface road

9792

40636

4.15

... More
Carriage on Un Surface road

768

3832

4.99

... More
Loading & Unloading

192

56881

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.(Stone Chips)

-

-

-

... More
Carriage on Surface road

314704.47

1306023

4.15

... More
Carriage on Un Surface road

19073

95174

4.99

... More
Loading & Unloading

3076.29

262961

85.48

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

9792

40636

4.15

... More
Carriage on Un Surface road

768

3832

4.99

... More
Loading & Unloading

192

56881

296.26

... More
Stone Chips For CTB

-

-

-

... More
Carriage on Surface road

251764.26

1044821

4.15

... More
Carriage on Un Surface road

15258.44

76139

4.99

... More
Loading & Unloading

2461.04

210369

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

116500.26

483476

4.15

... More
Carriage on Un Surface road

4017.25

20046

4.99

... More
Loading & Unloading

647.94

55386

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

13.33

92058

6904.55

... More
ii) 600mm Circular

6.67

41601

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

4

9694

2423.72

... More
Fixing of 200mtr stone

20

13949

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

984.1

216452

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

82

365505

4457.39

... More
H.S. Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

4883

5025925

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

16065

66669

4.15

... More
Carriage on Un Surface road

1260

6287

4.99

... More
Loading & Unloading

315

93321

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

27870.6

115662

4.15

... More
Carriage on Un Surface road

1689.13

8428

4.99

... More
Loading & Unloading

229.5

19617

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

46955.91

194867

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

459

39235

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

71610.17

297182

4.15

... More
Carriage on Un Surface road

4340.01

21656

4.99

... More
Loading & Unloading

493.18

79895

162

... More
Protection Work (Retaining Wall, Breast Wall)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

564.33

264817

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

44.58

42051

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

44.58

217979

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

514.58

2333588

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

64.08

82007

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

61.86

83905

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

164.46

211763

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

208

70179

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

4192.2

17397

4.15

... More
Carriage on Un Surface road

328.8

1640

4.99

... More
Loading & Unloading

82.2

24352

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

42573.43

176679

4.15

... More
Carriage on Un Surface road

2580.21

12875

4.99

... More
Loading & Unloading

241.02

20602

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

24585.48

102029

4.15

... More
Carriage on Un Surface road

1490.03

7435

4.99

... More
Loading & Unloading

228.43

19525

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

68164.7

282883

4.15

... More
Carriage on Un Surface road

4131.19

20614

4.99

... More
Loading & Unloading

469.45

76051

162

... More
Cross Drainage Work

-

-

-

... More
RCC SLAB CULVERT (1X1X1.5)

7

4771111

681587.39

... More
RCC SLAB CULVERT (1X2X2)

5

3867107

773421.58

... More
T06- DSM to Ghor Sr Sec School

-

-

-

... More
Flexiable Pavement

-

-

-

... More
Construction of Panelled cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

1532.87

12396704

8087.23

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

3962.65

27064

6.83

... More
Carriage on Un Surface road

386.6

3297

8.53

... More
Loading & Unloading

1933

441632

228.47

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Carriage on Surface road

27482.84

114053

4.15

... More
Carriage on Un Surface road

1963.06

9795

4.99

... More
Loading & Unloading

266.72

22799

85.48

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
Carriage on Surface road

52122.62

216308

4.15

... More
Carriage on Un Surface road

3723.04

18577

4.99

... More
Loading & Unloading

505.85

43239

85.48

... More
Flexiable Pavement

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

19162.5

595570

31.08

... More
Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201.1 By Manual Means

0.78

69202

88494.12

... More
Preparation and surface treatment of formation by remocing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1

29197.5

86424

2.96

... More
Below foundation

152.12

312303

2053.01

15.86

22782

1436.47

... More
Removing Pipe

53.34

37609

705.09

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

-

-

-

... More
Construction of hard shoulders with GSB material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

-

-

-

... More
Only Shoulder Portion (Eaarthen)

1557.2

398985

256.22

... More
Only Shoulder Portion (GSB)

778.6

1474964

1894.38

... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

178.84

338781

1894.38

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base

3065.74

6646550

2168.01

... More
Providing and applying primer coat with bitumen emultion (SS-1) on prepared surface of granular base including cleaning or road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical Clause: 502

15328.69

702207

45.81

... More
TACK COAT-

-

-

-

... More
Providing and applying tack coat with bitumen emultion (RS-1) using emultion distributor at the rate of 0.25-0.30 kg/sqm on the prepared granular surface tresated with primer & cleaned with hydraulic broom as per technical specification Clause: 503

15328.69

233915

15.26

... More
Providing, laying of close graded premix surfacing (Mixed seal surfacing) material of 25mm thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm (Type "B") as per table 500.15 of specification 509 of MORD, premixed with bituminous binder 60/70 grade (S-65,VG-30 Bulk) @ 23.75kg per 10sqm area, including cost of all materials (excluding seigniorage) and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 tonnes as per MORD Specification 509 complete for finished item of work in all respects as directed by Engineer-in-charge

15328.69

3294135

214.9

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

6223.45

25827

4.15

... More
Carriage on Un Surface road

214.6

1070

4.99

... More
Loading & Unloading

53.65

15894

296.26

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Carriage on Surface road

12587

52236

4.15

... More
Carriage on Un Surface road

1228

6127

4.99

... More
Loading & Unloading

307

90951

296.26

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading. Stone chips for CTB

-

-

-

... More
Carriage on Surface road

340615.7

1413555

4.15

... More
Carriage on Un Surface road

24329.69

121405

4.99

... More
Loading & Unloading

3924.14

335435

85.48

... More
Stone Chips For MSS

-

-

-

... More
Carriage on Surface road

44838.86

186081

4.15

... More
Carriage on Un Surface road

3202.78

15981

4.99

... More
Loading & Unloading

516.58

44157

85.48

... More
Road Furniture

-

-

-

... More
Informatory Sign board with Logo

1

14388

14388.58

... More
Fixing of citizen board

2

28777

14388.58

... More
Maintenance Information board

1

14388

14388.58

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

20.67

142696

6904.55

... More
ii) 600mm Circular

10.33

64476

6239.87

... More
Fixing of 5th KM stone

1

4182

4182.03

... More
Fixing of Ordinary KM stone

7

16966

2423.72

... More
Fixing of 200mtr stone

31

21620

697.45

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

786.1

172902

219.95

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810).

160

713182

4457.39

... More
H.S. Drain

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge. As per Clause 13.2 of SOR other works

1325

2624069

1980.43

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum concrete along the vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of the Engineer- in - Charge. As per Clause 13.5 of SOR other works. (Including Excavation and Stone Soling)

6461

6650113

1029.27

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

23411

97155

4.15

... More
Carriage on Un Surface road

2284

11397

4.99

... More
Loading & Unloading

571

169164

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

45488.76

188778

4.15

... More
Carriage on Un Surface road

3249.2

16213

4.99

... More
Loading & Unloading

441.47

37736

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

76753.68

318527

4.15

... More
Carriage on Un Surface road

4

19

4.99

... More
Loading & Unloading

884.26

75586

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

104881.52

435258

4.15

... More
Carriage on Un Surface road

7491.54

37382

4.99

... More
Loading & Unloading

851.31

137912

162

... More
Protection Work (Retaining Wall, Breast Wall)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out,construction of shoring and bracing, removal of stumps andother deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches withexcavated suitable material.

976.69

458322

469.26

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

89.89

84793

943.28

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clauses 802, 803, 1202 & 1203 M10 Base

89.89

439538

4889.63

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Coursed Rubble masonry In cement mortar (1:3)

1062.63

4818923

4534.92

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Sandy material

96.69

123739

1279.76

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

169.5

229904

1356.37

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

321

413329

1287.63

... More
Providing weepholes in brick masonry/stone masonry,plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V): 20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

455

153517

337.4

... More
Carriage of Stock Materials (Cement )

-

-

-

... More
Carriage on Surface road

6529.25

27096

4.15

... More
Carriage on Un Surface road

637

3178

4.99

... More
Loading & Unloading

159.25

47179

296.26

... More
Carriage of Non-Stock Materials (Sand )

-

-

-

... More
Carriage on Surface road

75244.42

312264

4.15

... More
Carriage on Un Surface road

5374.6

26819

4.99

... More
Loading & Unloading

475.83

40674

85.48

... More
Carriage of Non-Stock Materials (Stone Chips )

-

-

-

... More
Carriage on Surface road

40957.13

169972

4.15

... More
Carriage on Un Surface road

2925.51

14598

4.99

... More
Loading & Unloading

454.67

38864

85.48

... More
Carriage of Non-Stock Materials (Stone )

-

-

-

... More
Carriage on Surface road

119180.85

494600

4.15

... More
Carriage on Un Surface road

8512.92

42479

4.99

... More
Loading & Unloading

967.38

156715

162

... More
Cross Drainage Work

-

-

-

... More
RC SLAB CULVERT (1X1X1.5)

13

8746983

672844.87

... More
RCC SLAB CULVERT (1X2X2)

1

763236

763236.07



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.