Watershed Development And Soil Conservation Department Tender
... More
The WDSC has issued a formal invitation for competitive bids for the Watershed Development And Soil Conservation Department project, for Sn_9 Wdsc Tonk in Tonk, Rajasthan, with an estimated contract value of Rs. 1,28,54,000. The bid opening date for this tender is 18-12-2024 and the last date for bid submission is 01-01-2025. Interested bidders for Watershed Development And Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,57,080Document Cost
₹ 1,000Tender Fee
₹ 2,000
Summary
Sn_9 Wdsc Tonk
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_437903_9Bid Award Id
ViewTender No
Nit 24-25 wdsc TONKTender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
As per Bsr Description
-
-
-
... More
lhesaV IykLVj nhokj ij 1%6 vuqikr eS lhesaV es ctjh feykdj tksM+ks dks dwjsnus rFkk 14 fnu rd fu;fer rjkbZ lfgr 25 eh-eh- eksVkbZ ¼dsoy tyjks/kh lajpukvksa ds mi;ksx gsrq½ GKN-2022 BSR Item No-77A)
2047.35
277
567464
... More
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum of highly weathered strata dry or moist, including laying in 20 cm layers ( before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead 250 mtr and lift up 1.50 mtr (excluded charge for compaction and watering),including loading and unloading whenever required comp. in all respect ( Item no-16 ch-v WRD BSR 2022 tonk less 10% C.P. )
11038.04
94
1043094.78
... More
Watering of earth inc. cost of carriage of water (up to 1 Km ) (Item no-28 a ch-v WRD BSR 2022 tonk less 10% C.P. )
15110.76
9
150956.49
... More
Sign Board
23
1600
36800
... More
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। #170(अ)1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। GKN-2022 BSR)
384.59
4090
1573292.31
... More
Compaction of earth or highly weathered strata a. by manually or plain roller , (density 90 % of Proctor) ( Item no-18 a ch-v WRD BSR 2022 tonk less 10% C.P. )
15110.76
21
326392.42
... More
,uhdV gsrq iRFkj dh fpukbZ lhesaV ctjh elkys esa 1% 6 esa #166(अ) GKN-2022 BSR
2237.6
3561
7970308.82
... More
50 मिमी मोटाई में सीमेंट कंक्रीट 1:2:4 मिश्रण जिसमें 1 सीमेंट 2 बजरी 4 पत्थर की या ईंट की 12 मी. नामीय गिट्टी के साथ मिलाकर डालना, कूटना, दबाना तथा तराई आदि सहित। (GKN-2022 BSR Item No-14a)
649.95
406
264367.16
... More
Scrapping of grass and shrubs ( Item no-24 ch-v WRD BSR 2022 tonk less 10% C.P. )
36949
4
156294.27
... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m( Item no. 20 WRD BSR tonk 2022 less 10% C.P.)
405
72
29524.5
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Item no-1&2 ch-v WRD BSR 2022 tonk less 10% C.P. )
-
-
-
... More
Dag belling 5 to 7.5 cm(GKN-2022 BSR Item No-6B)
4759.38
1
8138.54
... More
2a.Soft / Disintegrated rock
201.43
139
28099.49
... More
feV~Vh dk fofHkUu nwjh ds fy, ifjogu lkexzh dks pku] mrkjuk o LVsfdax lfgrA ¼ifjogu dh yEckbZ fudVre :V ls x.kuk dh tkosxh u dh lMd ekxZ ls½ (GKN BSR 2024 Item no. 185 य)
137.03
126
17360.33
... More
1b. Hard / dense soil
1007.05
83
84290.09
... More
Lip cutting and final dressing as per designed section including rehandling and disposal of excavated earth in layers 20cm on embankments etc with cost of dewatering wherever required and complete in all respect (WRD BSR 2022 item no 19) Less CP 10%
762.75
25
19221.3
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements