Water Resources Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 5,21,940Document Cost
₹ 5,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRDAS_340382_7Bid Award Id
ViewTender No
03/2023-24 PHLC I BanswaraTender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite and other hard rock requiring nominal blasting
2626
842946
321
... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km)
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
23589
5808791
246.25
... More
Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect
1683
47124
28
... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads and lifts
598
459862
769
... More
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead and lifts 23 cm thickness ( 5 % thickness tolerance)
473
690107
1459
... More
Dry boulder filling in required profile with filling of voids etc. complete including all lead and lifts, and well finished surface
109
117720
1080
... More
Supplying and laying aggregate in layers and profile as specified including all leads and lifts. This item is to be used only for laying filter / inverted filter River gravel 20 to 40 mm size
166
162680
980
... More
Supplying and laying sand of grade as per design requirement in required profile including all lead and lifts.
This item is to be used only for laying filter / inverted filter
315
544320
1728
... More
Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour
1075
24725
23
... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
707
3937990
5570
... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm
100
606100
6061
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:4
7.8.1 Add extra over item code 7.1.1 to 7.7.3 for Masonry work in superstructure
1883
8177869
4343
... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm
152
72960
480
... More
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness: 20 mm
2207
686377
311
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
220
48400
220
... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km
5.28.2.1 Watering of earth including cost of carriage of water when source of water is
Beyond 1 Km but up to 5 Km extra per Km
23589
375065
15.9
... More
(ii)Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. at least 98% of Standard Proctor s density
23589
967149
41
... More
Threading / turfing of grass on slopes of bunds etc. in rows 15 cm centre to centre in each direction including Ploughing, levelling, breaking of clods, and removal of stones etc. if required including maintenance for 30 days or more till the grass develops fully with all leads and lifts complete.
3225
241875
75