Uranium Corporation Of India Limited Tender
... More
The UCIL has issued a formal invitation for competitive bids for the Uranium Corporation Of India Limited project, for BOQ Title: Development of 200m 8 degree Decline Phase V in Sikar, Rajasthan, with an estimated contract value of Rs. 7,12,15,442. The bid opening date for this tender is 01-03-2024 and the last date for bid submission is 05-04-2024. Interested bidders for Uranium Corporation Of India Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Uranium Corporation Of India Limited - UCIL Tender
Opening Date1 Mar 2024
Closing Date5 Apr 2024
Tender Amount₹ 7,12,15,442
Costs
EMD
₹ 7,12,155Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
BOQ Title: Development of 200m 8 degree Decline Phase V
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2024/B/4712873Bid Award Id
ViewTender No
GEM/2024/B/4712873Tender Authority
Uranium Corporation Of India Limited ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of Drifts , DEVELOPMENT OF 8 DEGREE ACCESS DECLINE and other RELATED EXCAVTION at ROHIL PROJECT Excavation of Drifts 4.5 m into 4.5 mcomplete in all respect without RCC arching with RCC drain X-Cuts 4.5 m into 4.5 m in 1 isto 200 gradient at Rohil Uranium Mine in hard or soft or weathered rock formations including all materials explosive detonators compressed air Electric power industrial water and drinking water all equipment like LHD LPDT and Jumbo etc all labour plant tools tackles all activities whatsoever for face preparation drilling blasting ventilation supporting rock bolting chain link supporting where required scaling of loose rocks mucking dewatering illumination housekeeping etc transportation of all materials from surface to underground and vice versa and all incidental miscellaneous works like manhole formation incidental stripping if required loading bay as per design temporary sump excavation for electrical equipment installation First aid and tool room fitting or laying or installation or charging or connection or disconnection or maintenance or repair of 1 inch 2 inch 4 inch 6 inch pipes fittings valves fans ventilation ducts and switch gears joint boxes electric cable illumination cross drain wherever required and making with RCC lining white washing and hauling up of excavated muck from working front to the void stopes below ground or any other place as per the direction of the Engineer in charge in the underground Size 4.5 x 4.5 m finished
25
-
-
... More
Structural steel work , Structural steel work welded in built up sections trusses and framed work including cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete Including cost of steel
10
-
-
... More
Drilling of ventilation BH , Drilling of ventilation Boreholes Upto a maximum depth of 50 m 200.0 mm finished dia with casing
250
-
-
... More
Excavation of Decline , DEVELOPMENT OF 8 DEGREE ACCESS DECLINE and other RELATED EXCAVTION at ROHIL PROJECT Excavation of Decline 5.5 m into 4.5 m Complete in all respect without RCC arching at 1 in 8 gradient with RCC drain at Rohil Uranium Mine in hard or soft or weathered rock formations including all materials explosive detonators compressed air Electric power industrial water and drinking water all equipment like LHD LPDT and Jumbo etc all labour plant tools tackles all activities whatsoever for face preparation drilling blasting ventilation supporting rock bolting chain link supporting where required mucking scaling of loose rocks dewatering illumination housekeeping etc transportation of all materials from surface to underground and vice versa and all incidental miscellaneous works like manhole formation incidental stripping if required loading bay as per design temporary sump excavation for electrical equipment installation fitting or laying or installation or charging or connection or disconnection or maintenance or repair of 1 inch 2 inch 4 inch 6 inch pipes fittings reducer valves fans ventilation ducts and switch gears MCCB Pannels starter joint boxes Gate End Box electric cable illumination white washing and hauling up of excavated muck from working front to the void stopes below ground or any other place as per the direction of the Engineer in charge
200
-
-
... More
Shotcrete of side walls roofs , Shotcrete of side walls roofs of varying thickness from half inch to 2 inch at different heights on surface and in underground including cost of all equipment tools and tackles materials reinforcement steel fibre etc No materials will be provided by the company
175
-
-
... More
RCC 1 2 4 , Providing transmitting by pipe or any other suitable means placing of RCC 1 Cement 2 coarse sand 4 graded stone aggregate 20 mm nominal size in underground including providing fixingand removal of steel shutters or ply shutters vibrating if concrete as directed inclusive of all labour materials incidental charges etc complete and also as per drawing and direction of Engineer in charge including the cost of reinforcement steel and cement reinforcement steel at the rate 100 Kg per M3 RCC 1 cement 2 coarse Sand 4 Graded stone aggregate 20 mm nominal size
100
-
-
Evaluation Notes How It Works ?
Potential Partner