If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 5,92,000Document Cost
₹ 5,900Tender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RRVPN_321679_1Bid Award Id
ViewTender No
NIT-18/2022-23 SE (Civil) RRVPN AjmerTender Authority
Rajasthan Rajya Vidyut Prasaran Nigam Limited ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates.FOUNDATION 132kV tower type BT6 (Foundation padestal Constructed and other balance work as per above item to be done)
3
86373
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates.FOUNDATION 132kV tower type BT7 (Foundation padestal Constructed and other balance work as per above item to be done)
3
86373
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates. FOUNDATION 132 kV CT support structures (AO5
14
428911
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to beincluded in quoted rates.FOUNDATION 132 kV CVT support structures (AO5)
15
459548
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplusearth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to beincluded in quoted rates. FOUNDATION 132 kV Lightning Arrestor (AO5)
9
275729
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates.FOUNDATION 132 kV Isolator (BO1)
12
549432
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations asper technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates. FOUNDATION PI Structure
18
149792
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates. FOUNDATION 33 kV structure Y type with stub (Foundation padestal Constructed and other balance work as per above item to be done)
16
152775
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates. FOUNDATION33 kV structure Z type (Foundation padestal Constructed and other balance work as per above item to be done)
14
138995
-
... More
Supply of all labour, material and construction of RCC footings and pedestals of any section/size including the cost of excavation in all types of soil/rock, back filling with available approved earth or borrowed/new earth, disposal of surplus earth/rock to the places directed, concrete (RCC M20 Grade and Lean concrete 1:4:8), reinforcement steel,form work ,grouting , underpinning, foundation strengthening in expansive / B.C soil, dewatering if required, curing, sundries including mechanism, MK, UPVC PIPE etc required for proper operation of equipments and transformer and other items not mentioned herein but required for the completion of the work for the following station towers and equipments support structures including finishing with12 mm thick plaster in CM 1:4 and applying two coats of white/somke grey weather proof painting coat on all exposed surface (top and sides) of foundations as per technical specification, approved drawings and directions of the Engineer- in-charge of work. Note: Top level of foundation shall be decided by the owner. Work shall be got executed as per approved drawing with minimum depth of excavation as 600 mm from Natural Ground Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra cost on account of minimum depth criteria shall deemed to be included in quoted rates. FOUNDATION 33 kV CT/PT structure
7
194704
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates. FOUNDATION 33 kV CT/PT structure (Foundation padestal Constructed and other balance work as per above item to be done)
2
15576
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates. FOUNDATION 33 kV structure X-15 type
12
333779
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates. FOUNDATION 33 kV structure X-15 type (Foundation padestal Constructed and other balance work as per above item to be done)
9
70093
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates.FOUNDATION 145 kV SF6 Circuit Breaker
5
277840
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates.FOUNDATION 36 kV Vacuum Circuit Breaker
8
216129
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates. FOUNDATION MK
8
66568
-
... More
Supply of all labour, material and construction of RCC footings
and pedestals of any section/size including the cost of
excavation in all types of soil/rock, back filling with available
approved earth or borrowed/new earth, disposal of surplus
earth/rock to the places directed, concrete (RCC M20 Grade
and Lean concrete 1:4:8), reinforcement steel,form work
,grouting , underpinning, foundation strengthening in expansive /
B.C soil, dewatering if required, curing, sundries including
mechanism, MK, UPVC PIPE etc required for proper operation
of equipments and transformer and other items not mentioned
herein but required for the completion of the work for the
following station towers and equipments support structures
including finishing with12 mm thick plaster in CM 1:4 and
applying two coats of white/somke grey weather proof painting
coat on all exposed surface (top and sides) of foundations as
per technical specification, approved drawings and directions of
the Engineer- in-charge of work.
Note: Top level of foundation shall be decided by the owner.
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural Ground
Level. Extra depth if any shall be filled with PCC 1:3:6. Any extra
cost on account of minimum depth criteria shall deemed to be
included in quoted rates.FOUNDATION Isolator handle mechanism
37
307879
-
... More
FOUNDATION FOR 20/25 MVA, 132/33 kV TRANSFORMER
including all associated works, rail tracks , jacking pads, anchor
block, RCC, PCC, Misc. Structural Steel including M.S. grating,
gravel filling, supports system and other items not mentioned
herein but required for the completion of work as per technical specification and approved drawings.
1
978423
-
... More
FOUNDATION FOR 20/25 MVA, 132/33 kV TRANSFORMER
including all associated works, rail tracks , jacking pads, anchor
block, RCC, PCC, Misc. Structural Steel including M.S. grating,
gravel filling, supports system and other items not mentioned
herein but required for the completion of work as per technical specification and approved drawings. ( Note Transformer raft and beam casted other balance to be done as per above item )
1
816197
-
... More
Nitrogen injection fire prevention and extinguishing system for
20/25 MVA transformer as per technical specification
2
574660
-
... More
FOUNDATION FOR 33/0.415 kV, 250 kVA, LT three phase
station transformer Supply of labour, material equipments and construction of
station Transformer’s foundation with RR stone masonry in CM
1:6 0f size 1.5m x 1.5m with top of foundation at 1.5m above
other foundation and depth of excavation minimum 600 mm
below NGL with 2 nos MS Channels 150X 75 embeded in 200
mm thick CC M 20 on top of masonry, outer plaster 20 mm thick
CM 1:4 and applying white weather proof painting coat on
exposed surface (top and sides) of foundation and other items
not mentioned herein but required for the completion of work as
per technical specification. balance work
1
13910
-
... More
CABLE TRENCH Construction of cable trenches of required size and depths with stone masonry/brick masonry walls, precast ferro cement
covers, water stops, stone/brick (fly ash bricks) including the
supply of labour, material, cement, reinforcement steel, steel
angles, flats for cable racks with holes for fixing battens and
providing P.C.C.(1:4:8) below cable trenches, 20 mm thick
cement plaster 1:6 inside completly and out side minimum 300
mm depth, 40mm thick CC flooring 1:2:4 with glass strips in
joints and 150 mm thick RCC M20 band on top of masonry with
supply and fixing Ferro-cement covers light duty from outer to
outer width of cable trench, designed for class 'B' loading with
adequate steel reinforcement of required thickness, M S Plate
rim, lifting hook, additive and admixtures like plasticizer ,
shrinkage resistance compound, abrasion resistant, Suitable
size angle shall be provided at the corner and junctions of
trench for support of covers. 100 mm dia UPVC shall also be
provided at 3000 mm c/c on both side of cable trench wall so to
entrap the rainy water. a gentle slope of 1 in 500 shall be
provided in the flooring til disposal point as per technical
specification and approved drawings. (payment shall be made
as per actual length). Note:1.Top level of trench shall be decided by the owner, Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural
Ground Level. Extra depth if any on account of diffrence in
level or slope shall be attained by stone/brick masonry. Any
extra cost on account of minimum depth criteria shall
deemed to be included in quoted rates. Type A Cable trench
110
896658
-
... More
CABLE TRENCH Construction of cable trenches of required size and depths with stone masonry/brick masonry walls, precast ferro cement
covers, water stops, stone/brick (fly ash bricks) including the
supply of labour, material, cement, reinforcement steel, steel
angles, flats for cable racks with holes for fixing battens and
providing P.C.C.(1:4:8) below cable trenches, 20 mm thick
cement plaster 1:6 inside completly and out side minimum 300
mm depth, 40mm thick CC flooring 1:2:4 with glass strips in
joints and 150 mm thick RCC M20 band on top of masonry with
supply and fixing Ferro-cement covers light duty from outer to
outer width of cable trench, designed for class 'B' loading with
adequate steel reinforcement of required thickness, M S Plate
rim, lifting hook, additive and admixtures like plasticizer ,
shrinkage resistance compound, abrasion resistant, Suitable
size angle shall be provided at the corner and junctions of
trench for support of covers. 100 mm dia UPVC shall also be
provided at 3000 mm c/c on both side of cable trench wall so to
entrap the rainy water. a gentle slope of 1 in 500 shall be
provided in the flooring til disposal point as per technical
specification and approved drawings. (payment shall be made
as per actual length). Note:1.Top level of trench shall be decided by the owner, Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural
Ground Level. Extra depth if any on account of diffrence in
level or slope shall be attained by stone/brick masonry. Any
extra cost on account of minimum depth criteria shall
deemed to be included in quoted rates. Type A Cable trench (Masonary work and some plaster done remaining work to be done as per item)
110
251064
-
... More
CABLE TRENCH Construction of cable trenches of required size and depths with
stone masonry/brick masonry walls, precast ferro cement
covers, water stops, stone/brick (fly ash bricks) including the
supply of labour, material, cement, reinforcement steel, steel
angles, flats for cable racks with holes for fixing battens and
providing P.C.C.(1:4:8) below cable trenches, 20 mm thick
cement plaster 1:6 inside completly and out side minimum 300
mm depth, 40mm thick CC flooring 1:2:4 with glass strips in
joints and 150 mm thick RCC M20 band on top of masonry with
supply and fixing Ferro-cement covers light duty from outer to
outer width of cable trench, designed for class 'B' loading with
adequate steel reinforcement of required thickness, M S Plate
rim, lifting hook, additive and admixtures like plasticizer ,
shrinkage resistance compound, abrasion resistant, Suitable
size angle shall be provided at the corner and junctions of
trench for support of covers. 100 mm dia UPVC shall also be
provided at 3000 mm c/c on both side of cable trench wall so to
entrap the rainy water. a gentle slope of 1 in 500 shall be
provided in the flooring til disposal point as per technical
specification and approved drawings. (payment shall be made
as per actual length).
Note:1.Top level of trench shall be decided by the owner,
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural
Ground Level. Extra depth if any on account of diffrence in
level or slope shall be attained by stone/brick masonry. Any
extra cost on account of minimum depth criteria shall
deemed to be included in quoted rates.Type C Cable trench
120
655437
-
... More
CABLE TRENCH Construction of cable trenches of required size and depths with
stone masonry/brick masonry walls, precast ferro cement
covers, water stops, stone/brick (fly ash bricks) including the
supply of labour, material, cement, reinforcement steel, steel
angles, flats for cable racks with holes for fixing battens and
providing P.C.C.(1:4:8) below cable trenches, 20 mm thick
cement plaster 1:6 inside completly and out side minimum 300
mm depth, 40mm thick CC flooring 1:2:4 with glass strips in
joints and 150 mm thick RCC M20 band on top of masonry with
supply and fixing Ferro-cement covers light duty from outer to
outer width of cable trench, designed for class 'B' loading with
adequate steel reinforcement of required thickness, M S Plate
rim, lifting hook, additive and admixtures like plasticizer ,
shrinkage resistance compound, abrasion resistant, Suitable
size angle shall be provided at the corner and junctions of
trench for support of covers. 100 mm dia UPVC shall also be
provided at 3000 mm c/c on both side of cable trench wall so to
entrap the rainy water. a gentle slope of 1 in 500 shall be
provided in the flooring til disposal point as per technical
specification and approved drawings. (payment shall be made
as per actual length).
Note:1.Top level of trench shall be decided by the owner,
Work shall be got executed as per approved drawing with
minimum depth of excavation as 600 mm from Natural
Ground Level. Extra depth if any on account of diffrence in
level or slope shall be attained by stone/brick masonry. Any
extra cost on account of minimum depth criteria shall
deemed to be included in quoted rates. Type D Cable trench
50
42716
-
... More
Construction of RCC sump having capacity 10000 Liters with
provision of automatic dewatering mud pump with disposal
arrangement upto outside RVPN premises as directed by
Engineeer In-charge with provision of a stand by pump.
1
228840
-
... More
CABLE TRENCH CROSSING Construction of cable trenches crossing in Road of required
depths with stone/brick (fly ash bricks) including the supply of
labour, material, cement, reinforcement steel, steel angles, flats
for cable racks with holes for fixing battens and providing
P.C.C.(1:4:8) below cable trenches, 20 mm thick cement plaster
1:6 inside complete , 40mm thick CC flooring 1:2:4 with glass
strips in joints and 450 mm thick RCC M20 band on top of
masonry with provision of 150 mm thick RCC paitam on both
side with supply and fixing reinforced Ferro-cement heavy duty
covers in required size , suitable for class 'AA loading ,having
thickness75 mm to 150 mm withanticorosive bitumen painted M
S Plate rim, lifting hook, additvive and admixures like plasticizer
, shrinkage resistance compound, abrasion resistant, as per
approved drawings, specification and direction of engineer
incharge
Note 1. Masonry section at road crossing should be capble to
cater 'AA' class loading and additional cost on account of thicker
wall section is deemed to be included in quoted rates.Road crossing for 'A' type cable trenches
16
253482
-
... More
CABLE TRENCH CROSSING Construction of cable trenches crossing in Road of required depths with stone/brick (fly ash bricks) including the supply of labour, material, cement, reinforcement steel, steel angles, flats for cable racks with holes for fixing battens and providing P.C.C.(1:4:8) below cable trenches, 20 mm thick cement plaster 1:6 inside complete , 40mm thick CC flooring 1:2:4 with glass strips in joints and 450 mm thick RCC M20 band on top of
masonry with provision of 150 mm thick RCC paitam on both
side with supply and fixing reinforced Ferro-cement heavy duty
covers in required size , suitable for class 'AA loading ,having
thickness75 mm to 150 mm withanticorosive bitumen painted M
S Plate rim, lifting hook, additvive and admixures like plasticizer
, shrinkage resistance compound, abrasion resistant, as per
approved drawings, specification and direction of engineer
incharge Note 1. Masonry section at road crossing should be capble to cater 'AA' class loading and additional cost on account of thicker
wall section is deemed to be included in quoted rates.Road crossing for 'C' type cable trenches
20
283554
-
... More
Grading of yard to attain the required finished ground level by
means of Earth work in cutting /filling in all type of soil/rock
including disposal of surplus excavated unuseful soil /rock or
filling the ground with approved noncohessive soil with
compation in layers so as to attain proctor density 90% with all
lead lift & cost of soil. All level difference stone /brick masonry
walls of required section with coping plaster, painting & weep
holes shall deemed to be inclueded in quoted rate of this item.(some qty Balance work to be done as per above item)
8500
1819000
-
... More
ANTI WEED TREATMENT AND BASE LAYER OF
INTERLOCKING TILES Providing and laying 60 mm thick M 30 interlocking tile Category
A Denated units to key into each otheron four faces zig zag
shape as per IRC SP 63:2004 specification
8500
4513500
-
... More
JELLY SPREADING (Gravelling) Providing and laying 100mm thick layer of granite/basalt/trap
jelly(gravel) of 40mm single size shall be spread over the entire
switchyard area as per drawing and directions of engineer
incharge of the work. The whole switchyard area (excluding
buildings pathway road, drainages, cable trenches, equipments/
structures plinths etc.) shall be covered with jelly spreading. The
jelly used shall be free from dirt, organic materials and flakes
8500
1073210
-
... More
Supply & Fixing Barricades to confine Jelly (gravel), which
include Supply and fixing cement concrete solid blocks of size
60x(20+25)/2x30 cms (l, b, h) jointed with CM 1:4, made from
precast M-20 concrete and laid over 100 mm thick base of PCC
1:4:8 including necessary curing etc. complete. The top of
concrete block shall be 100 mm above gravel top with provision
of suitable openings for drainage of rain water. The exposed
surface of barricades shall be applied with two coat of water proof cement paint.
800
188800
-
... More
Raod Work Construction of unreinforced, dowel jointed plain cement cocrete
pavement in 150 mm thickness over and including subbase of
150 mm thick quarrry rubbish and 100 thick PCC 1:4:8 with M
30 grade cement concrete laid in approved side form work(steel
channels , laying and fixing 125 micron thick polythene film
wedged, steel plates including leveling the form work as per
drawing, spreading using shovels, rakes, compacted using
niddle, plate and screed vibrator finished in continuous
operation including provision of expansion and contraction and
construction joint, applying debonding strips, primer, sealant,
dowel bars at expansion & construction joints only, curing etc
complete including dewatering process with all equipments.
work also includes provding and fixing precast cement concrete
solid blocks on outer edges of both side shoulder of size
60x(20+25)/2x30 cms (l, b, h) jointed with CM 1:4, made from
precast M-20 concrete and laid over 100 mm thick base of PCC
1:4:8 including necessary curing etc. complete. The concrete
block top shall be 100 mm above road top, with provision of
suitable openings for drainage of rain water. The exposed
surface of concrete blocks shall be applied with two coat of
enamel paint, painted black and yellow alternately, and
Providing and laying 60 mm thick M 30 interlocking tile Category
A Denated units to key into each other on four faces zig zag
shape over 100 mm PCC 1:4:8, complete as per IRC SP
63:2004specification o shoulders as per approved drawing,
specification and direction of engineer incharge. (payment shall
be made as per actual length) 4.0 Mtr. Wide Road with shoulders of 1.0 m on both side of CC road
155
1169645
-
... More
Raod Work Construction of unreinforced, dowel jointed plain cement cocrete
pavement in 150 mm thickness over and including subbase of
150 mm thick quarrry rubbish and 100 thick PCC 1:4:8 with M
30 grade cement concrete laid in approved side form work(steel
channels , laying and fixing 125 micron thick polythene film
wedged, steel plates including leveling the form work as per
drawing, spreading using shovels, rakes, compacted using
niddle, plate and screed vibrator finished in continuous
operation including provision of expansion and contraction and
construction joint, applying debonding strips, primer, sealant,
dowel bars at expansion & construction joints only, curing etc
complete including dewatering process with all equipments.
work also includes provding and fixing precast cement concrete
solid blocks on outer edges of both side shoulder of size
60x(20+25)/2x30 cms (l, b, h) jointed with CM 1:4, made from
precast M-20 concrete and laid over 100 mm thick base of PCC
1:4:8 including necessary curing etc. complete. The concrete
block top shall be 100 mm above road top, with provision of
suitable openings for drainage of rain water. The exposed
surface of concrete blocks shall be applied with two coat of
enamel paint, painted black and yellow alternately, and
Providing and laying 60 mm thick M 30 interlocking tile Category
A Denated units to key into each other on four faces zig zag
shape over 100 mm PCC 1:4:8, complete as per IRC SP
63:2004specification o shoulders as per approved drawing,
specification and direction of engineer incharge. (payment shall
be made as per actual length) 3.0 Mtr. Wide Road. with shoulders of 0.50 m on both side of CC road
575
2922978
-
... More
CONTROL ROOM BUILDING Construction of control room building as per drawing and
specification including internal electricafication, 15 lit storage
geyser earthing, sanitary system including septic tank, soakage
pit and rain water harvesting system as per drawing approved
by owner / GWD etc., water supply system including making
connection with distribution system, false ceiling (In Hall and
PLCC room) fans,water cooler of cooling capacity 80 lit/hour
and storage capacity of 12 lit, RO system withpurification
capacity of 25 lit/hour and duty cycle of 170-250 lit/day with PVC
tank of 200 lit capacity, internal cable trenches covered with 6
mm thick MS chequred plates, plinth protection works with
chequred tiles etc. (plinth area approximately 480 sqm, with out
roof projections, plinth protection and porch) ( Balance Work ) Lintel level masonry & column including lintel of control room building completed.Balance work as per above item & drawings of control room building to be done.Plinth protection also to be provided. (Note-Roof slab casted excluding stair head and other balance work including development work of control room to be done as per above item)
1
6238104
-
... More
WATER SUPPLY :-Supply and installation of water supply
system with construction of GLR, tube well to the required depth
with submersible pump(2 nos), subersible cable, pump room
with pump and one stand bye pump for the sub-station, required
electrifcations cables from control room and panels, providing
and laying GI pipe line from tube well to GLR and from GLR to
control room, yard, guard room, for plantation etc including
making connection , landscaping & plantation as per
specification approved drawings and directions of engineer
incharge
Note: Tubewell shall be constructed as per fisibility report
received from hydrogeologist/ collector ( Only GLR constructed and balance work to be done as per item )
1
975327
-
... More
Construction of internal fencing with welded mesh of size
25x25x2.1mm of 1.5m height framed in angle iron box of
40x40x5 placed at every 3000 mm, top and bottom angle
section of 40x40x5, 5 rows of barbed wire in 600 mm height or
railing in length near control rrom in 600 mm height above
fencing, MS flat of size 40x5 mm shall also be welded along the
edges of panels of welded mesh and in center of each panel.
Bottom masonry wall of 380mm width in height of 450 mm
above finished ground level and 50 mm thick precasr CC1:2:4
coping, plastering etc complete. Box of angle shall be grouted in
CC M20 in stone masonry in a depth of 450 mm, with
gate/wicket gate 5.0m/1.2 m wide 2.40 m height made from MS
pipe of 50 mm dia, MS hold fast hinges and MS channes box
fabricated out of 100x50x5 mm channels duly embeded in RCC
columns, with RCC M2O pillars of size .06mx0.6 m and 2.70 m
height on gate sides including enamel paint on gates and
weateher proof paint on plastered surface as per approved
specifications and drawings and directions of engineer incharge.
Gate shall be provided with gate light, required wiring, fixtures
and other required accessories.
Note: Gate and gate pillar shall be measured along with
running meter length of fencing for paymnets at the quoted
rates.
50
238950
-
... More
Construction of internal fencing with welded mesh of size
25x25x2.1mm of 1.5m height framed in angle iron box of
40x40x5 placed at every 3000 mm, top and bottom angle
section of 40x40x5, 5 rows of barbed wire in 600 mm height or
railing in length near control rrom in 600 mm height above
fencing, MS flat of size 40x5 mm shall also be welded along the
edges of panels of welded mesh and in center of each panel.
Bottom masonry wall of 380mm width in height of 450 mm
above finished ground level and 50 mm thick precasr CC1:2:4
coping, plastering etc complete. Box of angle shall be grouted in
CC M20 in stone masonry in a depth of 450 mm, with
gate/wicket gate 5.0m/1.2 m wide 2.40 m height made from MS
pipe of 50 mm dia, MS hold fast hinges and MS channes box
fabricated out of 100x50x5 mm channels duly embeded in RCC
columns, with RCC M2O pillars of size .06mx0.6 m and 2.70 m
height on gate sides including enamel paint on gates and
weateher proof paint on plastered surface as per approved
specifications and drawings and directions of engineer incharge.
Gate shall be provided with gate light, required wiring, fixtures
and other required accessories.
Note: Gate and gate pillar shall be measured along with
running meter length of fencing for paymnets at the quoted
rates.(Balance work -Masonry and plaster work completed other balance work to be done as per item)
65
162500
-
... More
Providing and fixing cow catcher made of R.S. joist angles,
channels MS round bars, MS flats etc including cutting welding
and fabrication with priming coat of red oxide (as per design).
The work includes construction of RR stone masonry wall of
required section up to 90 cm below cow catcher, RCC bed plate
of 20 cm thickness,cement plaster, PCC 1:4::8 in 15 cm
thickness etc. complete as per approved design and
specification
1