The PHED has issued a formal invitation for competitive bids for the Public Health Engineering Department project, for Rectification Of Pipe Line Leakages Allied Work Under Rural Water Supply Scheme Suratgarh ,sub Division Suratgarh in Sri Ganganagar, Rajasthan, with an estimated contract value of Rs. 4,00,000. The bid opening date for this tender is 09-07-2022 and the last date for bid submission is 18-07-2022. Interested bidders for Public Health Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Health Engineering Department - PHED Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date9 Jul 2022
Closing Date18 Jul 2022
Tender Amount₹ 4,00,000
Costs
EMD
₹ 8,000Document Cost
₹ 200Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PHCJA_285673_1Bid Award Id
ViewTender No
EE/PHED/Suratgarh/35/2022-23Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedwater.rajasthan.gov.in/phed
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
--do-- 125mm
1
-
360
... More
--do-- 200 mm to 300 mm
1
-
2368
... More
--do-- Granular courses
1
-
281
... More
--do-- 125 to 165 mm
1
-
529
... More
--do-- 250/280mm
1
-
611
... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 80 mm to 110 mm
1
-
1383
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 50 to 75 mm
1
-
420
... More
--do-- 80/90mm
1
-
262
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
1
-
254
... More
--do-- 100 mm thick.
1
-
326
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 80 mm
1
-
534
... More
--do-- 100 mm
1
-
578
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil 80mm
1
-
296
... More
--do-- 80/90mm
1
-
186
... More
--do-- 140/125 mm
1
-
419
... More
--do-- 400mm
1
-
1442
... More
--do-- 125 mm
1
-
650
... More
--do-- 400mm
1
-
1178
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) In all type Soil 50/63/75mm
1
-
181
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe 50/63/75mm
1
-
255
... More
--do-- 125 mm to 165 mm
1
-
1821
... More
--do-- 80 mm thick.
1
-
292
... More
--do-- 300 mm
1
-
1559
... More
--do-- 200 mm to 300 mm
1
-
2368
... More
--do-- 300 mm dia pipe to 350mm
1
-
1155
... More
--do-- 100mm
1
-
334
... More
--do-- 250 mm
1
-
989
... More
--do-- 300 mm
1
-
1044
... More
--do-- 200/225mm
1
-
640
... More
--do-- 200mm
1
-
656
... More
--do-- 250/280mm
1
-
851
... More
--do-- 200 to 300 mm
1
-
909
... More
--do-- 200 to 300 mm
1
-
963
... More
--do-- 300mm
1
-
1032
... More
--do-- Vertical aligned Bricks
1
-
272
... More
--do-- 150 mm
1
-
774
... More
--do-- 150mm
1
-
432
... More
--do-- 125/140mm
1
-
249
... More
--do-- 100/110mm
1
-
221
... More
--do-- 300/315mm
1
-
729
... More
Dismantling of flexible pavement for pipe line line and chambers by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks per technical specification and scope of work. Bituminous courses
1
-
395
... More
--do-- 225/200 mm
1
-
969
... More
--do-- 200 mm dia pipe to 250mm
1
-
632
... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
1
-
681
... More
--do-- 125 mm
1
-
436
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 80-100 mm
1
-
463
... More
--do-- 200 mm to 300 mm
1
-
2529
... More
--do-- 180/160/150 mm
1
-
436
... More
--do-- 80-110 mm
1
-
445
... More
--do-- 200/225mm
1
-
334
... More
--do-- 125 to 150 mm
1
-
546
... More
--do-- 400mm
1
-
950
... More
--do-- 200 mm
1
-
901
... More
--do-- 110/100 mm
1
-
354
... More
Removing & Re-fixing of Precast concrete interlocking blocks by manual, stacking of serviciable & non serviceable material separately. disposal of dismantled material lead up to 50 mtr. The C.C. interlocking paving blocks be laid on average 25 mm thick bed of coarse sand and the joints to be filled with fine sand. Laying procedure on compacted sub base as defined. Complete job is to be executed as per the directions of Engineer in charge. The rates to be inclusive of fixing of minimum 70 percent reusable precast concrete interlocking block and cost of required new precast concrete interlocking block against damaged, including all lead and lift as per Technical specifications. (Interlocking block manufactured by fully computerized automatic stationery hydraulic vibro pressed machine & full computerized automatic batching plant of class A-1 as per BS:6717-2001. Tensile splitting strength and breaking load as per BS: 6717-2001 Colour: Grey cement natural colour. Variation in Dimension : Less than 1.6 mm Variation in thickness: Less than 3.2 mm) 60 mm thick.
1
-
269
... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:
All kinds of soil
1
-
195
... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil 80 mm dia pipe to 100mm
1
-
327
... More
Add extra lead for Earth,Sand ,line morrum,manure or sludge For 500 M (0.5km)
1
-
25.2
... More
Labour charges for removal of complaint of polluted water supply to the consumers Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
1
-
715
... More
--do-- 150/160/180mm
1
-
249
... More
--do-- 125 mm dia pipe to 150mm
1
-
393
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil 80 mm
1
-
334
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
1
-
92
... More
--do-- 250mm
1
-
1032
... More
--do-- 250 mm
1
-
1261
... More
Pumping out water caused by springs, tidal or river seepage, broken water main or drains and the like with pumping set of following H.P. including P.O.L. / Power consumption etc. Complete. 10 to 19 H.P.
1
-
250
... More
Dismantling of cement concrete pavement for pipe line line and chambers by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks as per technical specification and scope of work.
1
-
718
... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
1
-
1066
... More
Add extra lead for Earth,Sand ,line morrum,manure or sludge For 5Km
1
-
50.6
... More
--do-- 100/110mm
1
-
299
... More
--do-- 350mm
1
-
1277
... More
--do-- 350mm
1
-
1123
... More
--do-- 225/200 mm
1
-
915
... More
--do-- 350mm
1
-
833
... More
--do-- 150 mm
1
-
436
... More
Add extra lead for Earth,Sand ,line morrum,manure or sludge Add for Each 1Km beyond Ist Km (upto 5km)
1
-
3.2
... More
--do-- 90/80 mm
1
-
317
... More
--do-- 125/140mm
1
-
364
... More
--do-- 100 mm
1
-
372
... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 80 mm to 100 mm
1
-
1583
... More
--do-- 125 mm to 150 mm
1
-
1920
... More
--do-- 300 mm
1
-
1097
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil 75 mm
1
-
310
... More
--do-- 150/160/180mm
1
-
381
... More
--do-- 350 mm
1
-
1989
... More
Removing & Re-fixing of Bricks Kharbanja road by manual means for laying of pipe line, stacking of serviceable & unserviceable material separately, disposal of dismantled material lead upto 50 mtr. The Bricks interlocking be laid on average 12 mm thick bed of mud mortar and the joints to be filled with pointing in cement mortar 1:3. Laying procedure on compacted sub base as defined. Complete job is to be executed as per the direction of Engineer in charge. The rates are inclusive of fixing of minimum 70 percent reusable Bricks and cost of required new First class FPS bricks (min. 10.5 Mpa) in place of damaged bricks, all lead and lift as per Technical Specifications and direction of Engineer in Charge. Horizontal aligned Bricks
1
-
245