The PHED has issued a formal invitation for competitive bids for the Public Health Engineering Department project, for Repair Of Pipe Line Leakages And Allied Work At Various Uwss Under Sub Dn Suratgarh in Sri Ganganagar, Rajasthan, with an estimated contract value of Rs. 8,00,000. The bid opening date for this tender is 16-07-2022 and the last date for bid submission is 21-07-2022. Interested bidders for Public Health Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Health Engineering Department - PHED Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date16 Jul 2022
Closing Date21 Jul 2022
Tender Amount₹ 8,00,000
Costs
EMD
₹ 16,000Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PHCJA_286957_1Bid Award Id
ViewTender No
EE/PHED/Suratgarh/36/2022-23Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedwater.rajasthan.gov.in/phed
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
150/160/180mm
-
-
381
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
100 mm
-
-
578
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
300/315mm
-
-
851
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.- Add on above item no. 7 for CC Road
-
-
279.4
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
250/280mm
-
-
611
... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
-
-
715
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.- Add on above item no. 7 for B.T. Road
-
-
266.7
... More
Providing and laying factory made chamfered edge Plastic coated Designer Cement Concrete paver blocks of required strength, thickness & size/shape, made by table vibratory method, to attain superior smooth finish using PU or equivalent moulds, laid in required Grey/Yellow/Red or any other colour & pattern over 50mm thick compacted bed of coarse sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per manufacturer’s specifications & direction of Engineer -in-Charge: 80 mm thick c.c. paver block of M-30 grade with approved color design and pattern.
-
-
565
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
150/160/180mm
-
-
249
... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil
200 mm to 300 mm
-
-
2368
... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil
125 mm to 165 mm
-
-
1821
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
350mm
-
-
1123
... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).In all type Soil
80 mm to 110 mm
-
-
1383
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
350mm
-
-
833
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
300 mm
-
-
1044
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
50 to 75 mm
-
-
420
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
400mm
-
-
1178
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
200 mm
-
-
901
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
125 to 165 mm
-
-
529
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
200 to 300 mm
-
-
909
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
350 to 400 mm
-
-
1260
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
350 mm
-
-
1989
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
100/110mm
-
-
221
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
200/225mm
-
-
334
... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
-
-
681
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
75 mm
-
-
310
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
200/225mm
-
-
640
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
225/200 mm
-
-
915
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
180/160/150 mm
-
-
436
... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
-
-
1066
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
125/140mm
-
-
364
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
-
-
254
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
100/110mm
-
-
299
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
300 mm
-
-
1559
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
125/140mm
-
-
249
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
80 mm
-
-
534
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
80-110 mm
-
-
445
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
50/63/75mm
-
-
181
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
250 mm
-
-
1261
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
110/100 mm
-
-
354
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
300/315mm
-
-
729
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
250 mm
-
-
989
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
140/125 mm
-
-
419
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
250/280mm
-
-
851
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
125 mm
-
-
650
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)In all type Soil
400 mm
-
-
2356
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
80/90mm
-
-
262
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)In all type Soil
400mm
-
-
950
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
90/80 mm
-
-
317
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements