Nuclear Power Corporation Of India Limited Tender
... More
The NPCIL has issued a formal invitation for competitive bids for the Nuclear Power Corporation Of India Limited project, for Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 5 And 6; H in Chittorgarh, Rajasthan, with an estimated contract value of Rs. 2,04,19,986. The bid opening date for this tender is 23-05-2025 and the last date for bid submission is 13-06-2025. Interested bidders for Nuclear Power Corporation Of India Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Nuclear Power Corporation Of India Limited - NPCIL Tender
Machinery and Tools
GEM
Opening Date23 May 2025
Closing Date13 Jun 2025
Tender Amount₹ 2,04,19,986
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2025/B/6227054Tender No
GEM/2025/B/6227054Tender Authority
Nuclear Power Corporation Of India Limited ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
GATC_6740c8cc-3d70-4be1-97ac1747978348416_rrsuser514.pdf
list-of-categories-where-trials-are-allowed_1712126171.pdf
BOQ Items
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of Electrical Hoist Or EOT CraneUp To 5 Ton Capacity For Details Refer BOQ Item Number 4 In SOW And 01 BidQuantit.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of HOT Or EOT Crane Above 5Ton And Up To 30 Ton Capacity For Details Refer BOQ Item Number 5 In SOW And 01Bid Qua.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of EOT Crane With Main HookAnd Auxiliary Hoist Of 75 And 20 Ton Capacity For Details Refer BOQ Item Number 6In SO.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Electrical Hoist OrEOT Crane Up To 5 Ton Capacity For Details Refer BOQ Item Number 7 In SOW And 01B.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of HOT And EOT CraneAbove 5 Ton And Up To 15 Ton Capacity For Details Refer BOQ Item Number 8 In SOWAnd.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of HOT And EOT CraneAbove 15 Ton And Up To 30 Ton Capacity For Details Refer BOQ Item Number 9 InSOW An.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of EOT Crane WithMain Hook And Auxiliary Hoist Of 75 And 5 Ton Capacity For Details Refer BOQ ItemNumbe.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Erection And Dismantling Of Tower Scaffold Of Aluminum Pipe ForDetails Refer BOQ Item Number 11 In SOW And 01 Bid Quantity Is Equal To 2500Meter; As P.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Erection And Dismantling Of Working Platform Of MS Pipe For DetailsRefer BOQ Item Number 12 In SOW And 01 Bid Quantity Is Equal To 3000 Meter; AsPer S.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Installation And Removal Of Cantilever Type Working Platform Using MSGrating For Details Refer BOQ Item Number 13 In SOW And 01 Bid Quantity Is EqualT.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Installation Removal Of Chain Pulley Block To From Monorail Up To 10Ton Capacity For Details Refer BOQ Item Number 14 In SOW And 01 Bid Quantity IsEqu.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Removal And Installation Of Hatch Block Or Chequered Plates Up To 6SQM For Details Refer BOQ Item Number 15 In SOW And 01 Bid Quantity Is Equal To50 N.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Shifting Of Small Materials Of Weight Up To 100 Kg From One ElevationTo Another Elevation By Hand Or Using Departmental Pallet Truck Truck Etc For Deta..( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Loading Unloading Of Heavy Single Material Of Weight 2 To 20 Ton ToAny Four Wheel Vehicle By Using Material Handling Tools Tackles For Details ReferBO.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of Rolling Shutter Of Size Above20 SQM And Up To 25 SQM For Details Refer BOQ Item Number 18 In SOW And 01 BidQua.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Half Yearly Preventive Maintenance Checks Of HOT And EOT Crane Up To20 Ton Capacity For Details Refer BOQ Item Number 19 In SOW And 01 Bid Quantity Is.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Half Yearly Preventive Maintenance Checks Of Electrical Operated CraneWith Main Hook And Auxiliary Hoist Of 75 And 20 Ton Capacity For Details Refer BO.. (1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of HOT And EOT Crane Up To 20Ton Capacity For Details Refer BOQ Item Number 21 In SOW And 01 Bid Quantity IsEqual.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of EOT Crane With Main HookAnd Auxiliary Hoist Of 75 And 20 Ton Capacity For Details Refer BOQ Item Number 22In S.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Along With Supply Of Two NosOf Bearings Of Chain Pulley Block Up To 5 Ton Capacity For Details Refer BOQ ItemNumb.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Along With Supply Of Two NosOf Brake Liners Of Chain Pulley Block Above 5 Ton And Up To 10 Ton Capacity ForDetail.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of HOT And EOT CraneUp To 10 Ton Capacity For Details Refer BOQ Item Number 25 In SOW And 01 BidQuantit.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of HOT And EOT CraneAbove 10 Ton And Up To 20 Ton Capacity For Details Refer BOQ Item Number 26 InScope.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of EOT Crane WithMain Hook And Auxiliary Hoist Of 55 And 20 Ton Capacity For Details Refer BOQ ItemNumb.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Chain Pulley BlockUp To 5 Ton Capacity For Details Refer BOQ Item Number 28 In SOW And 01 QuantityIs.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Chain Pulley BlockAbove 5 Ton And Up To 10 Ton Capacity For Details Refer BOQ Item Number 29 InSOW A.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Sling EyeboltForklift Any Other Lifting Tackles Up To 5 Ton Capacity For Details Refer BOQ ItemNumbe.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Web Sling WireRope Sling Any Other Lifting Tackles Above 5 Ton And Up To 15 Ton Capacity ForDetails .. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Load Testing As Per Station Approved Procedure Of Web Sling Hook AnyOther Lifting Tackles Above 15 Ton Capacity For Details Refer BOQ Item Number 32In.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of Shutter Of Size Above 20 SQMAnd Upto 25 SQM For Details Refer BOQ Item Number 33 In SOW And 01 Bid QuantityIs .. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Annual Preventive Maintenance Checks Of Shutter Of Size Above 70 SQMAnd Up To 120 SQM For Details Refer BOQ Item Number 34 In SOW And 01bidQuantity Is.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Manual Opening And Closing Of Shutter As Per Station Requirements ForDetails Refer BOQ Item Number 35 In Scope Of Work And 01 Bid Quantity Is Equal To ..( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Erection And Dismantling Of Tower Scaffold Of Aluminum Pipe Of JuteRope Size 10 Mm Diameter Suitable For Tieing Of Scaffold For Details Refer BOQ Item.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Erection And Dismantling Of Working Platform Of MS Pipe Along WithSupply Of Jute Rope Of Size 10 Mm Diameter Suitable For Tieing Of Platform ScaffoldF.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Installation And Removal Of Cantilever Type Working Platform Using MSGrating With Supply Of Display Board For Details Refer BOQ Item Number 38 In SOWA.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Installation Removal Of Chain Pulley Block Up To 10 Ton Capacity ForDetails Refer BOQ Item Number 39 In Scope Of Work And 01 Bid Quantity Is Equal To4.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Shifting Of Small Materials Of Weight Up To 100 Kg From One ElevationTo Another Elevation By Hand Or Using Departmental Pallet Truck Crane Etc ForDeta.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Loading And Unloading Of Scrap Metals From One Building To AnotherBuilding In Departmental Truck With Help Of Forklift For Details Refer BOQ ItemNumbe.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Loading Unloading Lifting From One Floor To Another Of Heavy SingleMaterial By Using Forklift Crane Etc For Details Refer BOQ Item Number 42 In SOWAnd.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; PM Checks Of Trolley Of Chain Pulley Block Up To 8 Ton Capacity ForDetails Refer BOQ Item Number 43 In Scope Of Work And 01bid Quantity Is Equal To60 .. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Replacement Of GI Strip Of Thickness Of 1 Mm Suitable ForRolling Shutter Of Length Between 5 Meter To 7 Meter For Details Refer BOQ ItemNum.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Crane And Fork Lift Operation At RRS Unit 5and 6 For Normal Duty For 8Hours In Round The Clock Shift By A Highly Skilled And Qualified Operator 1 Task .. ( 1)
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Crane And Fork Lift Operation At RRS Unit 5 And 6 Beyond Normal DutyHours On Per Hour Basis By A Highly Skilled And Qualified Operator 1 Task 1 HourOv.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Other Material Handling Related Miscellaneous Jobs By A Skilled WorkerFor 8 Hours In Round The Clock Shift 1 Task 8 Hours For Details Refer BOQ Item Nu.. (1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Other Material Handling Related Miscellaneous Jobs By A Skilled WorkerFor Beyond Normal Duty Hours On Per Hour Basis 1 Task 1 Hour Overtime ForDetails.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Other Material Handling Related Miscellaneous Jobs By A Semi SkilledWorker For 8 Hours In Round The Clock Shift 1 Task 8 Hours For Details Refer BOQ It..( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Installation Of Complete Set Of Manually Operated Gear BoxSuitable For Rolling Shutter For Details Refer BOQ Item Number 50 In SOW And 01Qu.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Installation Of One Set Of Special Steel Wire Spring SuitableFor Rolling Shutter For Details Refer BOQ Item Number 51 In SOW And 01 Bid Quan.. (1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Cleaning Of Natural Draft Cooling Induced Draft Cooling Tower BasinOutlet Coarse Fine Screen For Details Refer BOQ Item Number 52 In Scope Of WorkAnd .. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Installation Of Air Diesel Transmission Hydraulic FilterSuitable For Fork Lift Of 3 And 5 Ton Capacity For Details Refer BOQ Item Number 53.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Installation Of Complete Set Of Elastomers And Wiper SealsSuitable For Hydraulic Pallet Truck Up To 5 Ton Capacity For Details Refer BOQ Ite.. (1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Repair Of Winding Including Insulation Of DC Motor Of Battery OperatedPlatform Truck For Details Refer BOQ Item Number 55 In Scope Of Work And 01Quant.. ( 1 )
1
-
-
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 5 And 6; Supply And Installation Of Hydrolic Rubber Hose With End Fittings OfCapacity Up To 200 Kg Per Cm2 Of Hydraulic Pump For Details Refer BOQ ItemNumber 5.. ( 1 )
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements