North Western Railway Tender
... More
The NWR has issued a formal invitation for competitive bids for the North Western Railway project, for Provision Of Rub At Lc No 89a At Km 194/8-9 & Rub At Lc No 89 At Km 187/7-8 In The Section Of Rkb - Jsm Under Aden Jsm. in Jodhpur, Rajasthan, with an estimated contract value of Rs. 17,22,60,409. The bid opening date for this tender is 24-11-2024 and the last date for bid submission is 16-12-2024. Interested bidders for North Western Railway tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 10,11,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
131of2024-25-JODHPUR DIVISION-ENGINEERING/NORTH WESTERN RLYTender No
131of2024-25Tender Authority
North Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Chapter 17 Handling of Materials 5
-
-
313345.08
... More
Chapter 12 Roofing 4
-
-
3313667.5
... More
Removing of existing any type of track for insertion of RCC boxes, laying, linking & lifting of any type of track on newly laid RCC box on either side including cutting of rails,drilling of holes,subsequent through packing to make track fit for 75Kmph & destressing of LWR/CWR of any type of track and picking up of stone ballast (new or retrieved) including loading & leading of ballast from stacks Various activities in volved in this work along with their tentative scope are: (i) Removing ofexisting track - 39.0mtr (ii) Removing ballast from track & keeping it away from site of work. (iii) After insertionof RCC boxes, putting back existing ballast at (ii) above and supplying& putting in track additional quantity of ballast so as to provide minimum ballast cushion of 300mm to 350mm in 2 compacted condition. (iv) Relaying & linking of track - 39.0mtr (v) Lifting of track in stages of 50/75mm for required length to ensure ballast cushion of 300mm to 350mm as per site conditions minimum ballast supply 50.0cum on each LHS. (vi) Cutting of any type of rails - 4 to 8 nos. (vii) Drilling of 31.75mm/26.5mm or similar dia holes in rails of any section- 16 nos (viii) Subsequent through packings to make track fit for 75Kmph50.0mtr either side of LHS (ix) Local de-stressing of LWR/CWR 100.0m on either side of LHS. (x) AT welding of rail joints on any type of rail on single rail/SWP/LWR with Railway prefabricated moulds and railway portions as per IRS specifications T19-2012 ( amended up to date) •Qty. and scope of work shown above at S.No. (i) to (x) are tentative only. The scope of these items may vary as per site conditions & as per direction of Engineer-incharge for completing the work of LHS safely and successfully.The quoted rates are for complete job. Nothing extra shall be paid on any account.
2
68500
137000.38
... More
Chapter 16 Road work
-
-
6474157.8
... More
Chapter 5 Bridge Works -Misc. 4
-
-
4235738.26
... More
Chapter 19 Bridge Related Activities 6
-
-
550470.22
... More
Chapter 5 Reinforced Cement Concrete 2
-
-
548498.5
... More
Additional / Extra Km. Above 1200 Km. Of above NS item (including cost of operation & maintenance of the vehicle)
80000
6
554400
... More
Chapter 3 Bridge Works Superstructure- RCC 3
-
-
1116772.8
... More
Chapter 2 Bridge Works Substructure 2
-
-
126894172.8
... More
Chapter 10 Steel work 3
-
-
24171010
... More
Chapter 23 Rain water Harvesting & Tube wells
-
-
1008517.95
... More
Chapter 21 Miscellaneous Items
-
-
259206
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements