North Western Railway Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 5,58,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Rate Contract For Carrying Out Final Location Survey ( Geotechnical Studies, Design, Preparation Of Drawings)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
NWR-SC-HQ-JP-01R-2024-25-CAO-C-HQ-ENGINEERING/NORTH WESTERN RLYTender No
NWR-SC-HQ-JP-01R-2024-25Tender Authority
North Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transferring the finalized alignment on ground using total station, contractor shall fix up a RCC pillar at every 500m in straight portion of alignment and in curves the RCC pillar should be 2 fixed at every junction points of the straight and curve & junction points of transition and circular curve. In addition to above pillars, contractor shall required to fix the CC mattam at every 100m in straight and at every 20m in curve portion. Alignment pillars shall be fixed at both ends of each major bridge. This item includes all labour, material etc. complete, nothing shall be paid extra on any account.
500
11436
5718475
... More
"Drone Videography on section using UAV/Drone by capturing High resolution videography and delivering the geotagged videos along with a player facility to load & link image/Drawings/other files etc. and linkage to GIS Map like Google, Bhuvan etc. with overlay/sync facility should be available & row, alignment, structure, Chainage & other important details can be incorporated in it.(As per Railway Board Letter No.2015/Track-1/24 (1)/18/1 dated 09.10.2017 & No.2015/Track 1/24 (1)/18/1 Vol -1 dated 19.03.2019).Video playing desktop based application shall 3 be made available without any additional cost having measurement, comparison of two videos simultaneously, zoom in & out video to view any assets/details, facility should also be there. Deliverables Include: - 1. Raw 4k quality geotagged videos. 2. Merged Seamless Geo-tagged Video of at least 1920X1080 format (full HD) resolution with all annotations. 3. Low resolution video for online viewing in 640x480 format (SD). 4. A Desktop player facility to load & link image/Drawings/other files etc. and linkage to GIS Map like Google, Bhuvan etc. with overlay/sync facility should be available. 5. Payment shall be made on the basis of actual length of alignment covered." "Note- Payment schedule 1. On conduction of drone videography satisfactory to construction officers: 40% 2. After submitting all deliverables and found satisfactory to construction officers: 60%
500
4619
2309580
... More
"Geotechnical investigation by boring holes of dia 150 mm taking soil samples (disturbed/undisturbed) at every 1.5 meter conducting standard penetration test carry out necessary 4 test on soil samples in laboratory and providing the detailed report of bore log testing parameter position of water table and calculation of bearing capacity at various depth with appropriate foundation type. The bore log shall be prepared in Auto cad and the soft copy of the report shall also be submitted. Note: The rates include all tools and plants labour and other materials as a complete job & nothing extra shall be paid over and above this item.
10812
1049
11346112.8
... More
Submission of Project Report for Final location survey & detailed estimate with preparation of detailed schedule of quantity for formation work, ballast supply. The report should consist of quantity of earth work, blanket material, ballast, length of retaining walls; length of side 5 drains etc. details quantity of various items of minor, major, important bridges, ROB, RUB, & cost of estimation thereof. The estimate shall be up dated to include items as per the latest practice of Railway & Rly Bd's instructions. The rates adopted for schedule of quantities & detailed estimate should be latest & realistic. Rate analysis should be submitted as per instruction of engineer-incharge. Note: The details of quantities shall be submitted block section wise.
15
66865
1002977.1
... More
Preparation of GAD and submission (including assistance in approval) of final drawings (on tracing paper) to suite 25T/32.5T loading & necessary design to work out proposed foundation of abutment, piers etc. and superstructure as per note 2 below in NS-7. Design calculation shall be submitted by contractor. After approval of drawings on tracing, the drawing will be got scanned and ten copies of white print for each drawing will be submitted by the contractor. Payment schedule : 1. Submission of final tracing including signature of construction officers : 70% 2. Final Approval of drawing by Railway: 30% (a) Important & Major Bridges (ROB/FOB)
-
-
6
... More
Preparation of GAD and submission (including assistance in approval) of final drawings (on tracing paper) for Minor Bridges for 25T/32.5T loading & necessary design to work out proposed foundation of abutment, piers etc. and superstructure as per note 2 below. Design calculation shall be 7 submitted by contractor. After approval of drawings on tracing, the drawings will be got scanned and ten copies of white print for each drawing will be submitted by the contractor. Note:-1) The drawings will be prepared as per provision of Railway Codes/Manuals. 2) For superstructure, Railway RDSO standard drawings shall be used, wherever feasible. Payment schedule : 1. Submission of final tracing including signature of construction officers : 70% 2. Final Approval of drawing by Railway: 30%
577
7659
4419323.78
... More
Preparing (including all alterations till final approval) SIP, Cable Route Plan, LOP, Building Layout Plans & drawings of level crossings etc. Note- 1. Payment of this item shall be made 8 on the basis of actual area of final tracing after approval of Railway. 2. The rate includes various alterations in drawing till its finalization/approval by Railway. 3. Tracing quality as per minimum 100 GSM. 4. The payment under this item includes all Labour (Draftsman etc) & Material (Equipments, Stationery, Cartridge etc) required to prepare/print/alter/submit the drawings. Payment schedule- 1. Submission of final tracing including signature of construction officers : 70% 2. Final Approval of drawing by Railway: 30%
7962
359
2859791.16
... More
Preparation of land plans using plane table/ total station along the proposed alignment for identification and measurement of land to be acquired and properties lying in the proposed land 9 required for superimposition of revenue record. It also include collecting details such as owner of land & property, type of structure, no. of floors, land use pattern such as agriculture, commercial, barren, forest etc., and collection of all necessary revenue. survey maps required for preparation of land acquisition proposals.
500
10704
5352060
... More
NS/10 Preparation and submission of Report on Forest Clearance/permission including the processing of case on PARIVESH Portal for obtaining forest/wild life clearance as per latest Forest Conservation Act and its amendments by performing following activities:
-
-
1826997.15
... More
Preparation of LWR / CWR and Weld Plans: For Continuously Welded Rail (CWR) track for as much length a s possible, for which the Contractor shall prepare the CWR plans for the approval of the Employer in accordance with t h e design principles/provisions contained in I R L WR (Long Welded Rail) Manual based on approved Track Structure. T h e consultant shall submit advance copy of the Weld Plans on white paper for approval of Employer. After the approval o f Employer, the Consultant shall submit drawings in 3 (three) hard coloured copies on Polyester based tracing paper 11 (100 to 150 Microns) and two soft copies on CD. The scope includes required corrections and modifications as suggested by approving authorities of Railways till its final approval. Required follow up with various approving authorities including required explanations on various provisions / facilities in the ESP shall be arranged by consultant. Note: i) The colour scheme to be followed in the drawing shall be as per standard practice of IR. ii) Payment will be done as per Stages given below - Submission of Weld Plans and approval by Dyce (Design) /JP and CE/C : 60% Submission of Weld Plans and approval by Divisional HQ : 15% - Submission of Weld Plans and approval by Zonal H Q : 15% - Submission of Weld Plans in hard & soft copies : 10%
500
216
108425
... More
Design of high bank/deep cutting slope based on slope stability analysis using PLAXIS software as specified by RDSO GE:G-1/Annexure-III of Slope Stability Analysis theoretical guidelines for Railway cuttings / embankment more than 6m in height/depth based on the material available in cutting / embankments including collecting required number of soil samples and conducting required 12 laboratory tests as per RDSO specifications so as to find out soil parameters required in slope stability analysis, soft-ground treatment, working out design slope based on manual method / computer software including furnishing detailed calculations in a report form with contractor's men, material, machinery etc. and as directed by Engineer-in-charge. NOTE: Recommended slopes designs shall be from reputed designers and shall include detailed calculations to be submitted in 3 copies (UNIT:EACH C/S)
48
16353
784960.8
... More
Preparation of BOQ (EPC/Non EPC) including civil, S&T, electrical (including general & OHE) etc., complete and tender document for EPC tender as per specified packages specific to the project in accordance with the model EPC document (Agreement and RFP) published by Railway board and assist in bidding process management .
-
-
13
... More
Conducting photogrammetric survey using stero satellite imagery data as obtained from NRSC and processing the same using suitable GIS software for generation of Digital Elevation Model (DEM) , orthophotos, topomaps etc., to verify the doubling/new line alignment propsed in the PET survey by first identifying 3 alternate viable routes and finalization of most technical and economically alignment in consultation with railways duly adopting latest circular/manuals/code of railways with submission of detailed survey report along with abstract estimate as directed by the Engg-in-charge. The scope of the work includes 1). verifying and re- fixing alignment wherever necessary using wooded pillars duly suggesting 3 alternate viable routes and finalization of most economical one. The work shall be done as per detailed specifications given in the stage-I of the 14 tender document. 2). Submission of reports with definite recommendations. 3). submission of records duly plotting the proposed alignment in toposheets as well as in google earth. 4). All other deliverables as mentioned in stage-I. Note: 1. The various deliverables in this item such as DEM, ORTHO PHOTOS, DSM, TOPOGRAPHICAL MAP to a scale of 1:5000 are purely for the purpose of finalization of alignment. However, the accurate DEM/ORTHO PHOTOS/TOPOGRAPHICAL MAP shall be generated using drone/ LiDAR Survey 2.This item is also applicable for sections where the PET survey has not being done. 3.All special conditions mentioned in the agreement particularly under stage - I are applicable on this item. Payment schedule:- a) 70% payment shall be made on submission of the report. b.30% payment shall be made on approval of the work by the Railways. The contractor will have to submit report as per item within 45 days of the issue of LOA for three alternate routes and start the subsequent works for final location survey after obtaining approval regarding final alignment of the project.
200
4108
821664
... More
Hydrological investigation for Bridges using DEM : Conducting hydrologocal investigation including detailed caluclation for important/ major using Digital Elevation Model (Geological information system) Tasks: i. Marking of all bridge locations on index plan of the alignment. ii. Delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment - area, longest stream, slope iii Calculating design discharge (Q50) for all bridges based on RBF 16 / RBF 2 2 reports for small catchments and synthetic unit hydrograph from flood estimation report for large catchments (greater than 2 5 sq km). iv. Consultant will verify i f there are any dams / water storage structures i n t h e catchment a n d obtain regulated flow 16 discharge from concerned authority for calculation of design discharge. v. Checking of adequacy of proposed linear waterway, vertical clearance, free board and depth o f foundation. Soil investigation report for scour depth calculations will be provided to the consultant. Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges. ii. For each bridge, calculations and catchment plan with longest stream marked o n Survey o f India toposheet should be submitted. For bridges with large catchments, unit hydrograph and calculation of equivalent slope should also be submitted. iii. Catchment plan should be marked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the booklet. iv. The following are required to be submitted as softcopy - calculation spreadsheets, Google Earth KML files o f catchment plans, longest stream, alignment and bridge location. (B) For Major Bridges
100
4610
461066
... More
BORROW AREA: Conducting Survey within 5Km aerial leads from the proposed 17 alignment for prospective borrow areas of soil and blanketing material to assess quantity and quality of materials available for construction of embankment, including collecting required number of soil / ballast samples and conducting required laboratory tests to ascertaining the quality of material as directed by Engineer in charge. The list of established Ballast crushers/quarries and their lead charts for obtaining ballast / blanket material as per railway specifications is required to be submitted along with Survey report in 3 copies
500
1241
620845
... More
Conducting detail engineering construction survey for proposed new BG alignment as directed by engineer in charge. The work shall include fixing of control point using total station/ differential GPS. Traversing the alignment and detail instrumental survey in a width of 100m on both sides of the proposed alignment after identification and approval of most feasible and most economical alignment based on preliminary survey, topo sheet of NRSA, satellite image, field survey and investigations etc. The contractor has to suggest alternative routes with justification which can enable the Railways to finalized best suitable alignment. The item also include design of optimal 18 alignment based on topographical features and terrain considering engineering parameters (like degree of curve, ruling gradient, transition length of curve etc.) level crossings, ROB/RUB/Flyovers, bridge, ecology and habital and taking due care of various provisions of Indian Railway Code for Engineering department and other relevant provisions including schedule of dimensions. The contractor shall also provide the soft and hard copies of satellite image with 1 meter resolution superimposing the alignment of proposed New BG line. Processing the images by developing the cross section of the proposed alignment, with indicating the heights of ground at every 500mts from mean sea level, The alignment including all the proposed stations, bridges, tunnels etc complete coming in this alignment. The images Should be approximately 76 Kms long x 4 Km wide i e 2 Kms on either side of alignment. (Note: This item is applicable only for Detour alignment )
200
17744
3548982
... More
Conducting Traffic Survey as per latest Railway Board's guidelines vide letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022 and as per Chapter 3 of Engineering Code with latest version. The work includes:- 1. Conducting Traffic Demand survey as detailed in Railway Board's 19 guidelines vide letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022 and as per Chapter 3 of Engineering Code with latest version. 2. Calculating data required for calculation of various direct and indirect benefits as detailed in Railway Board's letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022. 3. Calculation of ENPV and EIRR. 4. Submission of detailed report indicating the details of surveys undertaken and sources of various data considerd, for calculating ENPV and EIRR
15
739805
11097086.55
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%