North Central Railway Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

North Central Railway - NCR Tender

Goods
Civil And Construction
Consultancy Services
Civil And Architectural Services
Ireps
Opening Date5 Jul 2024
Closing Date7 Aug 2024
Tender Amount₹ 55,11,998.22 
Notes
Download

Costs

Summary

Final Location Survey Of Mathura-dholpur 4th Line (107 Km).

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for revision/ modification in L-sections/ plans requiring after approval of competent authority and submission of another tracing for approval. Six (06) ammonia/ white copies of each sheet and soft copy in CD/Pen drive to be submitted after final approval by competent authorities of Railways.

35

1447

50654.1

... More
Preparation submission and approval of General map to scale of 25Km to 1cm. Index map to a 5 scale of 2.5Km to1cm and detail Index plan & section in autocad as per para 449, 450 & 451 of Engg. Code with complete details as directed by Engineer in charge to scale of 0.5Km to 1cm. in horizontal and 10m. to 1cm vertical. Note: (1) The above item will be executed only after approval of L-section sheets. 2) The contractor will supply original tracing of approved quality and 6 ferro copies and soft copy on CD in Auto Cad.

15

3134

47010.3

... More
Preparation of ESPs of various stations on Auto CAD as per requirement of Railways showing 6 existing & proposed position of tracks and related structures ( based on concept plans) & submission on one advance copy on white paper and further one copy on tracing after incorporating suggested corrections for approval for stations. Note: The colour scheme to be followed in the drawing shall be as per standard practice of North Central Railway or as per the direction of Engineer in charge.

8

6648

53188.88

... More
Extra for revision/ modification in ESPS requiring after approval of competent authority and submission of another tracing for approval. Six (06) ammonia / white copies of each yard and soft copy in CD/Pen Drive to be submitted after final approval by competent authorities of Railways.

16

1447

23156.16

... More
"Preparation of existing & proposed layout plan along with detailed structural drawings ( If Type 8 plans are not available) good for execution of Station buildings, quarters & structures of the stations en-route on AutoCAD and submission of print on white paper and tracing for approval of Railways. Proposed layout plan for stations should indicate proposed service building like Relay room, equipment room, battery room, ESM cum data- logger room etc. Raiways type plans of buildings and structures shall be used in general."

10

6687

66876.1

... More
"Preparation and submission of existing & proposed layout and detailed working plan of level 9 crossings including goomties as per IRPWM on Auto CAD and submission of print on white paper and tracing for approval. Six ammonia/white copies of each yard and soft copy in CD/Pen drive to be submitted after final approval by Railways."

31

2069

64154.5

... More
Site selection for Major and Important bridges including levelling for profile of stream bed, leveling 10 of 1.5km bed on up stream and down stream side traversing for catchments area of the stream, Collection of hydrological data. Hydrological calulations for deciding water way of bridges and preparation of GAD plan for bridges etc. complete.

4

13994

55978.84

... More
"Preparation and submission of GAD-cum-design, drawing of Minor Bridges indicating details of proposed Bridges to suit 25 Ton loading -2008 including details of sub structure/foundation abutment/ pier wing 11 and return considering waterway of existing bridge. The rate includes preparing general arrangement drawing, detailed structural working drawing, getting the Railways approval and submitting approved drawing on tracing paper of A0/A1 size (as per direction of Engineer in charge) along with six ammonia prints. Submission of design calculation in 3 (three) copies properly binded for each bridge and also on CD /Pen Drive and schedule of quantities for minor bridges as per requirement of Engineer in charge. Cost of all labour, material tools & plants and machinery is included in the rate."

57

5734

326867.64

... More
Conducting feasibility study for construction of LHS/Sub- way/RUB in lieu of level crossings manned and unmanned in the section and preparation of General arrangement drawing cum detailed design drawing for RUB in lieu of level crossing as per 25T loading standard and getting final approval of Railways complete.

5

7774

38873.8

... More
Preparation of land plans using plane Table/Total Station along the proposed alignment for 13 identification & measurement of land to be acquired and properties lying in the proposed land, required for superimposition of revenue record, It also includes collecting details such as owner of land and property, type of structure, number of floors, land use pattern such as agriculture, commercial, barren, forest etc., and collection of all necessary revenue survey maps required for preparation of land acquisition proposals.

81

7777

629938.62

... More
"Site survey & preparation of GADs for proposed ROBs/RUBs in lieu of level xings showing all important features such as existing Railway track, existing structures in the vicnity, site survey upto distance of 500 metres on either side from centre line of level xing and its connectivity to District /State Highway /National 14 Highway, Ground water level HFL as directed by Engineer-in-charge and submission of coloured print on paper for proof checking along with final coloured print on good quality tracing paper and soft copy of GAD. The work also includes showing sites of proposed R0B/RUB and diversion in the GAD as per instruction of Railway officials. The rate includes all expenses of Man and Material including toll tax & Govt taxes as applicable and nothing extra shall be paid. NOTE - Railway reserve the right to increase/ decrease number of copies of GAD as per requirement."

10

14926

149260.2

... More
"""Work of Drone Orthophoto generation as per new railway guidelines for new line /doubling work under Dy. CE/C/AGC. NOTE A- Methology:- Drone will fly on the alignment, preparing a orthophotos which are ortho rectified and geomentrically corrected. B- Delivery:- a- Raw images (jpg formate) (2cm GSD), b- Final 15 scaled and Geopositioned orthophoto tiles in geotiff format for each 500mm of 2 cm resolution and reampled at 5cm GSD. c- Final scaled & Geopositioned orthotiles in jpg & amp sid compressed formate of 2 cm resolution and resampled at 5 cm GSD. d- Final scale and Geopositioned orthormoslac in jpg & amp Sid format for each 5 km. e- Map file comparible to CAD/GIS in shp format duly linked with attfibutes of assets. f- Quality control report for positional Accuracy Assessement Conditions to be placed for at least 5 well defined assests in 1 km length from/google and same to be measured on the orthophoto for co-ordinate comparison. """

107

11145

1192562.08

... More
Conducting hydrological investigation including detailed calculation for minor bridges using DEM (digital elevation model) Geological information system Tasks (i) marking of all bridges locations on index plan of the alignment. (ii) delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment- area longest stream, slope iii Calculating design discharge (Q50) for all bridges based on RBF 16/RBF 22 reports for small catchments and synthetic unit hydrograph from flood estimation report for large catchments (> 25 sq. km) iv consultant will verify if there are any dams/water storage structures in the catchment and obtain regulated flow discharge from concerned authority for calculation of design discharge.v. 16 checking of adequacy of proposed linear waterway, vertical clearance, free board and depth of foundation. Soil investigation report for scour depth calculations will be provided to the consultant. Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges. ii. For each bridges, calculations and catchment plan with longest stream marked on Survey of India toposheet should be submitted. For bridges with large catchment unit hydrograph and calculation of equivalent slope should also be submitted. iii. Catchment plan should be marked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the book let. iv. The following are required to be submitted as soft copy-calculation spreadsheets, Google Earth KML files of catchment plans, longest stream, alignment and bridges location.

57

1744

99423.96

... More
"Conducting hydrological investigation including detailed calculation for major/important bridges using DEM (Digital Elevation Model) Geological information system Tasks( i). marking of all bridges locations on index plan of the alignment. (ii.) Delineating the catchment boundary of bridges from DEM and calculating 17 physiographic parameters of the catchment- area longest stream, slope iii. Calculating design discharge (Q50) for all bridges based on RBF 16/RBF 22 reports for small catchments and synthetic unit hydrograph from flood estimation report for large catchments (> 25 sq. km) iv Consultant will verify if there are any dams/water storage structures in the catchment and obtain regulated flow discharge from concerned authority for calculation of design discharge .v. Checking of adequacy of proposed linear waterway, vertical clearance, free board and depth of foundation. Soil investigation report for scour depth calculations will be provided to the consultant. Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges. ii. For each bridge, calculations and catchment plan with longest stream marked on Survey of India toposheet should be submitted. For bridges with large catchment unit hydrograph and calculation of equivalent slope should also be submitted. iii. Catchment plan should be marked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the book let. iv. The following are required to be submitted as soft copy-calculation spreadsheets, Google Earth KML files of catchment plans, longest stream, alignment and bridges location."

4

4952

19811.56

... More
Conducting traffic survey for double line /new line as per the relevant Chapter 3 of railway 18 Engineering Code and preparation of detailed project report along with ROR , FIRR & EIRR (As per guidelines issued by Railway Board & including network effect) calculations duly complying the conditions involved. The detailed project report along with ROR calculations to be submitted in ten (10) hard copies as well as soft copy.

107

688

73688.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.