Jodhpur Vidyut Vitran Nigam Limited Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 45,617Document Cost
₹ 2,950Tender Fee
₹ 590
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_JdVVN_473619_1Tender No
TNJDZ-36Tender Authority
Jodhpur Vidyut Vitran Nigam Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
-
-
-
... More
9 Mtr/ 1.2mx0.6mx1.50 m deep
100
-
-
... More
(C)Stay set/Depth of pit
-
-
-
... More
6'x 5/8" -0.75x0.5x1.35 m
200
-
-
... More
Excavation of pit in Hard Soil
-
-
-
... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit
-
-
-
... More
9 Mtr/ 1.2mx0.6mx1.50 m deep
125
-
-
... More
(C)Stay set/Depth of pit
-
-
-
... More
6'x 5/8" -0.75x0.5x1.35 m
200
-
-
... More
Excavation of pit in ordinary rock which does not require blasting/murrad (In Jodhpur Discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
-
-
-
... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
-
-
-
... More
9 Mtr/ 1.2mx0.6mx1.50 m deep
200
-
-
... More
(C)Stay set/Depth of pit
-
-
-
... More
6'x 5/8" -0.75x0.5x1.35 m
325
-
-
... More
Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.
-
-
-
... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit
-
-
-
... More
9 Mtr/ 1.2mx0.6mx1.50 m deep
175
-
-
... More
(C)Stay set/Depth of pit
-
-
-
... More
6'x 5/8" -0.75x0.5x1.35 m
175
-
-
... More
Safe carriage of PCC poles including loading / un-loading
-
-
-
... More
c) 9 Mtr.long 200 Kg. PCC pole
-
-
-
... More
within 10 Kms.
600
-
-
... More
Above 10 Km. & upto 30 Km. add for each Km. or part thereof
475
-
-
... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site
-
-
-
... More
Within 10 Kms.
44.1
-
-
... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
31.66
-
-
... More
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.
-
-
-
... More
Within 10 Kms.
8.12
-
-
... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
8.12
-
-
... More
Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading.from store to site (These charges will be 1.5 times for both sides )
-
-
-
... More
b) 25 & 40 KVA
-
-
-
... More
Within 10 Kms.
120
-
-
... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.
60
-
-
... More
c) Above 40 KVA & upto 100 KVA
-
-
-
... More
Within 10 Kms.
30
-
-
... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.
15
-
-
... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.
-
-
-
... More
(B) IN RURAL AREA
-
-
-
... More
PCC Poles 9 Mtr. Long(200Kg.)
280
-
-
... More
Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of complete steel structure for line D.P.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.
-
-
-
... More
PCC Poles 9 Mtr. Long(200 Kg.)
160
-
-
... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire
-
-
-
... More
6"x5/8" with 7/10 SWG stay wire
900
-
-
... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,
-
-
-
... More
11 KV line
160
-
-
... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.
960
-
-
... More
Fixing of 11 KV pin insulator with pins.
840
-
-
... More
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.
-
-
-
... More
11kv Horn Gap fuse set.
150
-
-
... More
Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of steel structure set for sub-station as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,
-
-
-
... More
25 and 40 KVA
120
-
-
... More
Above 40 KVA & up to 100 KVA
30
-
-
... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.
-
-
-
... More
(B) IN RURAL AREA
-
-
-
... More
ACSR WEASEL
49.5
-
-
... More
Three nos. Earthing of each 11/0.4 KV distribution transformer /sub-station with M.S.Rod 20mm dia 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16" dia.at flattened top and tightening of M.S.flat 50x6mm/25x3mm/(having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.
150
-
-
... More
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing.
-
-
-
... More
Other steel items
0.2
-
-
... More
Making connection & fixing of LTCT Meter / Whole current Meter
150
-
-
... More
Making connection & fixing of 3 nos LTCT's
150
-
-
... More
Fixing of MCCB in M&P box including clamping and making cable connection. NOTE: The fixing of three phase MCCB (being supplied by Nigam) at centre of bottom of M&P box wil be done as per direction of concern ACOS.
150
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%