Department Of Atomic Energy Tender
... More
The DAE has issued a formal invitation for competitive bids for the Department Of Atomic Energy project, for Material Handling, Cleaning Of Components Maintenance Of Equipments And Preparation And Removal Of Scaffolding During Mta-25 At Hwpk Site. in Chittorgarh, Rajasthan, with an estimated contract value of Rs. 66,37,743. The bid opening date for this tender is 28-02-2025 and the last date for bid submission is 15-03-2025. Interested bidders for Department Of Atomic Energy tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Department Of Atomic Energy - DAE Tender
Eprocure
Opening Date28 Feb 2025
Closing Date15 Mar 2025
Tender Amount₹ 66,37,743
Costs
EMD
₹ 1,32,755Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Material Handling, Cleaning Of Components Maintenance Of Equipments And Preparation And Removal Of Scaffolding During Mta-25 At Hwpk Site.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HWB_851203_1Bid Award Id
ViewTender No
HWPK/MECH/MTA-25/439Tender Authority
Department Of Atomic Energy ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
MII POLICY AND ELIGIBILITY CERTIFICATE
BOQ Items
... More
Removal and installation of internals of Cation's (3nos)Anion's (2nos) ,MB's (3nos) and ACF(3 nos)etc for re-rubber lining jobs.
11
-
-
... More
Shifting of pipe spools with in work area , temporary slinging of pipe spools for making of flange joints.
150
-
-
... More
Assisting in carrying out of following below mentioned activities
-
-
-
... More
Shifting of spares,valves and required material from central stores to work site and shifting of gaskets,bolts,molykote,grease etc from mechanical sectional store to work site.
150
-
-
... More
Providing scaffolding up to an elevation 9.144 m(30 ft) from ground with supply of material .The size of scaffold shall be minimum 3 SqM
5500
-
-
... More
Collection of Aluminium scaffolding from sectional store ,shifting to work site,assembling and installation of aluminium access tower of 7 module (1410 mm x 1180 mm x 16280 mm)& dis-assembly and return to sectional store in terms of module as per requirement.Contractor shall deploy two numbers skilled riggers per day for preparation of scaffolds.Aluminium scaffolding modules will be provided by department free of charge on returnable basis.
2500
-
-
... More
Shifting of components to R&M Shop for machining,drilling,lapping and similar repair works etc.
150
-
-
... More
Removal,dis-mantling ,cleaning ,overhauling and re-installation of utility pupms
9
-
-
... More
Handling ,hanging and carrying out lowering of lifting tools & tackles like chain pulley blocks,ropes,pull lift etc.
200
-
-
... More
Maintenance of boosters:-removal,cleaning ,alignment and re-installation of components of boosters.
5
-
-
... More
Providing temporary scaffolding including supply of material and man power by using 1-1/2" thick 6" wide wooden planks(seasoned & non-warping type)properly secured with the horizontal members (scaffolding pipe 40NB preferably)by using binding wire & maintaining plank overhang projection not more than 50 mm beyond its horizontal supports.Any scaffolding such prepared must conform to IS-3696-1966 and shall be subjected to check by HWP (K) safety group, before declaring it as fit for use. Such scaffolding shall be removed by the contractor after completion of maintenance work by the contractor and measured contractor or his supervisor shall co-ordinate to the shifting of material,preparation and removal of scaffolding .He shall assign them for taking up of jobs on day to day including mainaining register of jobs and manpower attendance during the contract period.
-
-
-
... More
Providing scaffolding at an elevation above 9.144 m ( 30 ft) from ground with supply of material .The size of scaffold shall be minimum 3 SqM
750
-
-
... More
Shifting of welding generators ,gas cylinders,lying of cables,grinders and other accessories.
120
-
-