Bharat Sanchar Nigam Limited Tender

... More
The BSNL has issued a formal invitation for competitive bids for the Bharat Sanchar Nigam Limited project, for Ofc Construction/ofc Laying In Map Area Jaisalmer Oa in Jaisalmer, Rajasthan, with an estimated contract value of Rs. 30,64,165. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 14-06-2025. Interested bidders for Bharat Sanchar Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Telecommunication Services
Eprocure
Opening Date24 May 2025
Closing Soon14 Jun 2025
Tender Amount₹ 30,64,165 
Notes
Download

Costs

Summary

Ofc Construction/ofc Laying In Map Area Jaisalmer Oa

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In Rocky Soil

3500

500

-

... More
Laying of PLB pipe duct through HDD method as per Engineering instructions. (Department will supply HDPE/PLB pipe in Coils of various length,HDPE/PLB Sockets/Coupler, End caps.)

-

-

-

... More
Single PLB pipe.

500

180

-

... More
Two to three pipes in bunch

-

-

-

... More
Four to seven pipes in bunch

-

-

-

... More
Single pipe in Hard rocky strata

-

-

-

... More
Laying, Jointing and leveling of PLB/HDPE pipe of 40mm dia including transportation.

-

-

-

... More
Laying of Single HDPE / PLB Pipes/Coils, coupled with coupler.

7500

4

-

... More
Laying of Two HDPE / PLB Pipes/Coils, coupled with coupler.

-

-

-

... More
Laying of Three HDPE / PLB Pipes/Coils, coupled with coupler.

-

-

-

... More
Road/Rail crossing through horizontal boring method (manual / Mechanical) and inserting 65/40 dia GI Pipes and pushing ( HDPE / PLB Pipes/Coils inside.(i) Depth shall be 2M and above without GI protection.(ii) Depth is less than 2M with GI Protection as applicable. (Department will supply GI pipes in lengths of approx. 6M, HDPE/PLB pipes/Coils.)

-

-

-

... More
Laying, Jointing , Leveling, fitting and fixing G.I. Pipe with PLB/HDPE pipes/coils in trenches. ( Department will supply G.I. Troughs/GI pipes in lengths of appox. 6M, clamps, HDPE/PLB pipes/Coils)

-

-

-

... More
65mm/40mm dia G.I. Pipe

-

-

-

... More
G.I. Pipe of dia from 80mm to 150mm

-

-

-

... More
Laying, Jointing, leveling, fitting and fixing of GI pipe of dia 65 mm to 100mm with PLB/HDPE on bridges and culverts and fixing with clamps and nails. (Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M, HDPE/PLB Pipes/Coils). (Clamps, nails & accessories will be arranged & supplied by the Contractor)

100

115

-

... More
Laying, Jointing, leveling, fitting and fixing of GI pipe of dia more than 100mm to 150mm with PLB/HDPE on bridges and culverts and fixing with clamps and nails. (Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M, HDPE/PLB Pipes/Coils). (Clamps, nails & accessories will be arranged & supplied by the Contractor).

-

-

-

... More
Fixing of GI pipe in the normal trench with lesser depth/wheel guard/curb of road/bridges and culverts and fitting HDPE/PLB pipe 40mm dia and providing CC of 1:2:4. (Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M, HDPE/PLB Pipes/Coils). (CC material will be supplied by contractor).

-

-

-

... More
15Cm.* 15Cm CC over 65mm dia GI Pipe

-

-

-

... More
20Cm.* 20Cm CC over 65mm dia GI Pipe

-

-

-

... More
25Cm.* 25Cm CC over 65mm dia GI Pipe

-

-

-

... More
25Cm.* 25Cm CC over 40mm dia PLB Pipe

-

-

-

... More
Cubic Meter rate for CC (Applicable for CC work other than dimensions at S.No. 2.3 (iii) and 2.3 (v)).

70

4100

-

... More
Fixing of GI pipe in the normal trench with lesser depth/wheel guard/curb of road/bridges and culverts and fitting HDPE/PLB pipe 40mm dia and providing RCC enclosing GI pipe with CC of 1:2:4 with 4 no. of 6mm dia iron rods with rings at intervals of 0.5m of 6mm dia. (Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M, HDPE / PLB Pipes/Coils). (RCC material will be supplied by the contractor).

-

-

-

... More
15Cm.* 15Cm RCC over 65mm dia GI Pipe

-

-

-

... More
20Cm.* 20Cm RCC over 65mm dia GI Pipe

-

-

-

... More
25Cm.* 25Cm RCC over 65mm dia GI Pipe

-

-

-

... More
25Cm*25Cm RCC over 40mm dia PLB Pipe

-

-

-

... More
Fixing of GI pipe in the normal trench with lesser depth/wheel guard/curb of road/bridges and culverts and fitting HDPE/PLB pipe 40mm dia and providing RCC enclosing GI pipe with CC of 1:2:4 with Weld Mesh. (Department will supply G.I. Troughs/GI Pipes in lengths of approx. 6 M, Weld Mesh, HDPE / PLB Pipes/Coils). (CC material will be supplied by the contractor). The rates of CC as in s.no.2.3 (iii)/2.3(iv) (as the case may be) will be applicable for RCC with Weld Mesh.

-

-

-

... More
15Cm.* 15Cm CC over 65mm dia GI Pipe

-

-

-

... More
20Cm.* 20Cm CC over 65mm dia GI Pipe

-

-

-

... More
25Cm.* 25Cm CC over 65mm dia GI Pipe

-

-

-

... More
25Cm.* 25Cm CC over 40mm dia PLB Pipe

-

-

-

... More
Cubic Meter rate for CC (Applicable for CC work other than dimensions at S.No. (a), (b), ( c) & (d)).

-

-

-

... More
Laying full round RCC/DWC Pipes ( All sizes) in trenches with HDPE / PLB pipes / coils inside for item no. 1.0 (Department will supply full round RCC/DWC Pipes, HDPE/PLB pipes/coils).

-

-

-

... More
Full Round RCC pipe

100

16

-

... More
Full Round DWC pipe

100

9

-

... More
Laying Split RCC/DWC Pipes ( All sizes) in trenches with HDPE / PLBpipes / coils inside . for item No.1.0 (Department will supply Split RCC/DWC Pipes, HDPE/PLB Pipes/Coils).

-

-

-

... More
Split RCC pipe

-

-

-

... More
Split DWC pipe

-

-

-

... More
(i) Opening of Manholes, Blowing of O.F. Cable, Sealing of HDPE / PLB Pipes by Rubber Bushes in Manholes, providing HDPE/RCC/DWC Split Pipes in manhole and Back Filling of Manholes.

-

-

-

... More
In new Pipe

8000

8

-

... More
In Existing duct

-

-

-

... More
Ribbon Splicing

-

-

-

... More
Splicing of 288F OF cable

-

-

-

... More
Splicing of 96F OF cable

-

-

-

... More
Splicing of 48F OF cable

-

-

-

... More
Conventional Splicing

-

-

-

... More
Splicing of 24F OF cable at SJC/BJC/FTB/Splitter locations

6

4000

-

... More
Splicing of 12F OF cable

-

-

-

... More
Branch Jointing (Making Branch Joint of the incremental O.F. Cable with existing O.F. Cable)

2

4000

-

... More
Digging of pit for jointing chamber construction of brick chamber, filling of brick Chamber with clean sand, supply and placing of stone slabs on brick chamber, and back filling of jointing pit.( Including cost of material i.e. Bricks, Slabs, sand etc.)

2

4500

-

... More
Digging of pit for jointing chamber, Fixing of Pre-cast RCC chamber, filling of RCC chamber with clean sand, placing of Pre-cast RCC slabs on RCC chamber, and back filling of jointing pit including supply of Pre Cast RCC Chamber and Slabs as per tender specifications.

2

4500

-

... More
Construction of RCC Manhole : Providing,Construction & Fixing of RCC Manholes at site as per construction specification given in the tender document, work includes excavation of pits for the manhole.(All material will be arranged by the contractor)

-

-

-

... More
Fixing of Stone/RCC route Indicator supplied by department including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator, Painting & Sign writing on Route/Joint Indicators. Fixing Indicators with CC 0.45 M x 0.35 M. x 0.15 M. in ratio of 1:2:4 ( CC material will be supplied by the contractor) in 0.6 M.x 0.6 M. x 0.7 M. Pit.

40

160

-

... More
Supply of RCC or Stone route/joint Indicators as per Tender Construction Specification.

40

260

-

... More
Documentation (6 hard copies & 1 soft copies in CD) containing diagram and all details including Lat/Long of each Joint/Route indicator on good quality paper.

8

250

-

... More
Recovery against empty cable drum

4

300

-

... More
Laying of OF Cable in corridor/rises/exchange premises (leading in work)

100

10

-

... More
Laying & fixing of 65/40/25mm GI Pipes/Kietic pipe vertically along the wall by GIU clamps with PLB inside it & drawing PP rope inside the pipe.

-

-

-

... More
Fixing/clamping kietic pipe/DWC/GI Pipe horizontally along the wall (including the clamping fixing material)

-

-

-

... More
The Department will supply protection pipes & OF Cable. The contractor shall arrange all other materials required for the work.

-

-

-

... More
Road Restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface (total upto 75mm thick),including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997.

-

-

-

... More
Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road.

-

-

-

... More
Videography of the route on which cable is laid.

8

300

-

... More
Physical Mounting of FDMS on wall at OLT locations

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.