Airports Authority Of India Tender
... More
The AAI has issued a formal invitation for competitive bids for the Airports Authority Of India project, for Construction Of New Passenger Terminal Building For Domestic Operations At Jodhpur Airport Sh Sitc Of Baggage Handling System At in Jodhpur, Rajasthan, with an estimated contract value of Rs. 15,41,90,514. The bid opening date for this tender is 21-05-2025 and the last date for bid submission is 06-06-2025. Interested bidders for Airports Authority Of India tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 46,25,715Document Cost
₹ 5,900Tender Fee
₹ 5,900
Summary
Construction Of New Passenger Terminal Building For Domestic Operations At Jodhpur Airport Sh Sitc Of Baggage Handling System At
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_AAI_235814_1Tender No
AAI/CHQ/ENGG (E)/ JOD-BHS/2025-26Tender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
c) Transport Conveyor (Straight/declined/inclined/ induction/T-Junction conveyor, etc.) along with drive unit for each section to match with x-ray machine level with minimum width of 1000mm between side walls.
295
-
-
... More
d) Queuing / Metering Conveyor with minimum 1500 mm length and minimum nominal width of 1000mm between side walls along with drive units.
8
-
-
... More
e) 90° Power Curve with inner useful belt width of minimum 1000mm between side walls along with drive unit.
9
-
-
... More
f) Over Height Limiter made up of stainless steel with photo sensor to detect the over height of baggage including proper support arrangement and fault reset button.
2
-
-
... More
g) Draught Curtains in the openings wherever the conveyor pass through the walls, consisting of flexible overlapping slats of black belt strips as per site requirement.
5
-
-
... More
h) Motorized Security Shutter as per site requirement in the wall opening (wall between passenger and non-passenger area) including limit switches, wiring and integration with control panel etc. for arrival and departure.
5
-
-
... More
i) Gravity Roller Table constructed from heavy duty mild steel box section formed from 50 mm diameter heavy-duty rollers at an appropriate pitch to suit the intended duty made out of utility grade stainless steel including support etc.
6
-
-
... More
j) Heavy duty race track slat type inclined arrival baggage re-claim carousels of Aprox. 62 mtrs length with minimum useful width 1000mm between side walls, having black color slats made of antistatic, flame retardantmolded rubber/PVC/ABS material of minimum 5mm thickness, slope angle as given in technical specification and drawing, speed of 24-30 meters /min.
3
-
-
... More
k) PLC based control panel for Departure incorporating switch gears, protection devices, starters with all sensors and other components suitable for operation & safety of complete departure conveyor system including check-in conveyor and for interfacin etc. i/c supply of all associated materials like power, control cables etc along with UPS.
(Divided in minimum zones as mentioned in Technical Specifications)
1
-
-
... More
l) PLC based control panel for Arrival incorporating switch gears, protection devices, starters with all sensors and other components suitable for operation & safety of complete arrival conveyor system including check-in conveyor and for interfacingetc. i/c supply of all associated materials like power, control cables etc along with UPS.
(Divided in minimum zones as mentioned in Technical Specifications)
3
-
-
... More
INSTALLATION, TESTING & COMMISSIONING (ITC) OF BAGGAGE CONVEYOR SYSTEM
Installation, Testing and Commissioning (ITC) of following items for Departure & Arrival Conveyor System including minor civil works such as grouting of structures and making good the same including ITC of control panel along with necessary outgoing cables/wire, earthing for drive unit motor, limit switches, Emergency stop push buttons, indications, annunciation, IT network and control cables, power cabling etc. complete as required and as per Technical specifications.
-
-
-
... More
a) Check-in conveyor system in two sections comprising of Weighing+Labeling and Dispatch conveyor
20
-
-
... More
b) Take away/collector conveyor
45
-
-
... More
c) Transport Conveyor ((Straight/declined/inclined/induction/ T-Junction conveyor, etc.)
295
-
-
... More
d) Queuing / metering Conveyors
8
-
-
... More
e) 90° Power curves
9
-
-
... More
f) Over Height limiter
2
-
-
... More
g) Draught curtains
5
-
-
... More
h) Motorized Security Shutter
5
-
-
... More
i) Gravity Roller Table
6
-
-
... More
j) Heavy duty race track slat type inclined arrival baggage claim carousels of Aprox. 62 Mtrs length
3
-
-
... More
k) PLC based control panel for Departure
1
-
-
... More
l) PLC based control panel for Arrival
3
-
-
... More
Design, Supply, Installation, Testing, Commissioning and Integration of SCADA system with PLC for departure and arrival system consisting of SCADA server indicating GUI, alarm and message, start stop, LAN Profit Bus/ ProFi Net connectors, UPS etc. Job includes supply of all type of hardware and licensed SCADA software along with redundant reporting server with necessary installations, accessories to accrue, process, store and retrieve the baggage processing data confirming to certification of TSA/ECAC requirement including SITC of PC and colored printers suitable for printing on A4 paper etc. complete in all respect and as per Technical Specifications for successful commissioning of the system.
1
-
-
... More
SH:II Annual Operation & Comprehensive Maintenance Contract
-
-
-
... More
OPERATION: Annual Operation and routine maintenance of complete Departure and Arrival Conveyor systems (excluding CT-EDS)as mentioned under SH:I by providing requisite man-power, tools, consumables and technical support etc. during operations as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect.
-
-
-
... More
Year 1 (during DLP)
1
-
-
... More
Year 2 (during DLP)
1
-
-
... More
Year 3
1
-
-
... More
Year 4
1
-
-
... More
Year 5
1
-
-
... More
Year 6
1
-
-
... More
Year 7
1
-
-
... More
All Inclusive Comprehensive Maintenance Contract (AICMC): AICMC after DLP of two years of complete Departure and Arrival Conveyor system as mentioned under SH:I along with all its Electrical and Mechanical accessories by providing requisite man-power, all required spares, tools, consumables, preventive & corrective maintenance and technical support as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect.
-
-
-
... More
Year 3
1
-
-
... More
Year 4
1
-
-
... More
Year 5
1
-
-
... More
Year 6
1
-
-
... More
Year 7
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements