The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Estimate For Lining / Relining Of Watercourses Of O/l 3214-l Of Goindwal Mr, Vill Fatehabad District - Tarntarn Under Ubdc Canal System.(length 1027 Mtr) in Tarn Taran, Punjab, with an estimated contract value of Rs. 16,78,432. The bid opening date for this tender is 24-08-2026 and the last date for bid submission is 27-11-2026. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Water Resources Department - WRD Tender - Punjab Tender
Opening Date24 Aug 2026
Closing Date27 Nov 2026
Tender Amount₹ 16,78,432
Costs
EMD
₹ 33,570Document Cost
₹ 2,000Tender Fee
₹ 1,678
Description
Estimate For Lining / Relining Of Watercourses Of O/l 3214-l Of Goindwal Mr, Vill Fatehabad District - Tarntarn Under Ubdc Canal System.(length 1027 Mtr)
Contact
Tender Id
2026_WR_159857_189Tender No
NIT 04 of 2026Tender Authority
Water Resources Department ViewPurchaser Address
-Website
https://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork filling In 0.152m Layers in foundation including Ramming, Watering And Consolidation under bed. CSR Item 6.8 (b-i)
1
1
-
... More
Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II
1
1
-
... More
Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a)
1
1
-
... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
1
1
-
... More
Dressing of Bed and Preparation of Sub-grade for Lining. CSR Item 19.1
1
1
-
... More
Preparing watering and ramming surface for laying concrete (horizontal Surface for irrigation channels) CSR Item 10.35 (b-i)
1
1
-
... More
Dismantling Brick Work in Cement 8.5(b)
1
1
-
... More
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i)
1
1
-
... More
10 mm thick Cement Plaster 1:4 on Side Walls CSR Item 15.6
1
1
-
... More
10 mm thick Cement Plaster 1:4 on bed & top of side walls CSR Item 15.38
1
1
-
... More
RCC work hand mixed 1:2:4 for slab including steel reinforcement.
1
1
-
... More
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or bettering). CSR item 9.1
1
1
-
... More
Supplying of RCC Shutter with Extra Frame.
1
1
-
... More
Fixing of Frame
1
1
-
... More
Supplying & Laying Dry Brick Bats.
1
1
-
... More
Cement concrete M-20 (Design Mix) using computerised concrete batch mixing plant.
1
1
-
... More
Cement Concrete 1:3:6 with stone Ballast or Shingle work mixing by Mechanical means using Concrete Mixer Volumetric Type. CSR Item 10.12 (a-ii)
1
1
-
... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes.
1
1
-
... More
LDPE film of 150 micron over sleepers for construction& expansion joints including supply and carriage &loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
1
1
-
... More
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint &Contraction Joint. Complete in all respect. CSR item 13.54
1
1
-
... More
Filling expansion joints with special impervious hot pour 12.5mm wide. CSR item 19.16
1
1
-
... More
Filling Contraction/Construction Joint with special impervious hot pour 12.5mm wide. CSR item 19.16
1
1
-
... More
Supply of fuel for running Slip forming machine for construction of rectangular concrete watercourse
1
1
-
... More
Hiring Charges of crane (35 tonnes capacity) for lifting of Slip forming Machine.
1
1
-
... More
Any Other Item (Antisole Admixture for curing compound)
1
1
-
... More
Any Other Item. CSR+ZP
1
1
-
... More
Any Other Item.
1
1
-