National Fertilizers Limited Tender
... More
The NFL has issued a formal invitation for competitive bids for the National Fertilizers Limited project, for Nfn/civil/658/2024/23 Dated 29/01/2025 Maintenance Of New Ash Pond At South Side Of Factory Boundary Wall Old Ash Ponds And Delay Pond At Nfl Nangal Unit During The Year 2025 26 And 2026 27 in Rupnagar, Punjab, with an estimated contract value of Rs. 41,62,987. The bid opening date for this tender is 29-01-2025 and the last date for bid submission is 27-02-2025. Interested bidders for National Fertilizers Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NFL_225184_1Bid Award Id
ViewTender No
NFN/CIVIL/658/2024/23 DATED 29/01/2025Tender Authority
National Fertilizers Limited ViewPurchaser Address
-Website
http://https://www.nationalfertilizers.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ii) Clearing of grass and wild growth from top surface of the embankments including dressings of the grass/ wild growth that has developed inside slopes but is covering the top surface of embankment work.
-
-
-
... More
i) Contractor shall note that they shall have to deploy at least two persons daily during the factory normal working hours (including off days and holidays) for a continuous period of one month per Operation. Persons deputed for this job shall exclusively work continuously for attending the jobs covered in the scope of this item.
-
-
-
... More
Note: Contractor will be required to stack sufficient quantity of good earth alongwith the embankment of new / old ash ponds at critical locations decided by the Engineer-in-charge before on set of monsoon/ winter rains by ensuring that all the earth excavated from borrow pits shall be transported to work site without any pilferage during its transport. For the purpose of payment against this item the quantity of earth work in excavation as measured from the borrow pits area shall only be considered provided the entire earth is utilized in undertaking the repair work in above manner as per directions of the Engineer-in-charge.
-
-
-
... More
Supplying empty cement bags filled with earth / Ash/ sand and placing in position at ash pond area, delay pond including all lifts and leads at sides of embankment ,in or under water (Available earth / Ash from near by location shall be used) etc. as and when required as per directions of the Engineer-in-charge. Note: Sand shall be supplied by agency for fiiling in bags and payment of sand shall be made under relevant item No. 9 of SOQ.
400
-
-
... More
Note: Contractor shall note that they shall have to deploy at least one person daily during factory normal working hours (including off days and holidays) for a continuous period of one month. Person deputed for this job shall not be diverted for attending any other items of the work and shall exclusively work continuously for attending the jobs covered in the scope of this items. A period of one-month maintenance in above manner will be considered toward as one operation against this item.
-
-
-
... More
Periodic cleaning of the katcha drain carryiny storm water from North Embankment to Middle of south Embankment of new pond (Approx. Length 1KM) to ensure free flow of storm water from North to south direction by the removal of silt/ rubbish/ plantation in the drain wherever required and cleaning wild growth/ plantation upto 1 Mtr. width on either side of the drain and disposal of the same upto 50M lead all as per direction of the Engineer-in-charge. Note: Contractor shall deploy labour at least two male worker in a day, which shall form the basis of payment for one operation, to carry out the above scope of work.
150
-
-
... More
a) From 5 KM to 8 KM lead.
50
-
-
... More
Supplying and stacking of locally available Fine/coarse / Sutlej sand.
40
-
-
... More
Executing specific maint. of green belt and paths of ash pond area by deploying sufficient number of labour, which includes clearing of grass/ wild growth, removal of all types of unwanted wild growth / vegetation from the bed at scattered locations of new ash pond, which are not included in any item of SOQ, all as per instructions of the Engineer-in-charge. All tools & tackles such as khurpa/ sickles etc. shall be arranged by the contractor. Note: Contractor shall deploy labour at least five male worker in a day, which shall form the basis of payment for one operation, to carry out the above scope of work.
200
-
-
... More
Regular maintenance of embankment of the new Ash Pond, for a continuous period of 30 days by deployment daily sufficient number of persons (including off days and holidays) so as to undertaken the following jobs covered in the scope of work:-
12
-
-
... More
Note:
-
-
-
... More
Regular diversion of ash slurry flow being disposed in the new / old ash ponds including delay pond during factory working hours as per site requirement so as to lead it to the required directions/ locations to ensure that ash slurry flow does not pose any danger to embankments of new ash pond and also for even deposition of ash all along the new ash pond areas, as per the directions of the Engineer-in-charge.
-
-
-
... More
A) New Ash Ponds / Old Ash Ponds/ Delay ponds
24
-
-
... More
Undertaking effective repairs to major cuts/ gorgus/ cracks etc. in embankments, top surface as well as side slopes during and immediately after monsoon/ winter rains/ any time using good earth including watering, compacting and leveling in required slope at site, all as per directions of the Engineer-in-charge after arranging good earth by necessary earth work in excavation at excavated site and transporting the same with use of Mechanical transport:
-
-
-
... More
ii) A period of one month diversion in above manner will be considered towards payment as one operation against this item.
-
-
-
... More
iii) Dressing of the undulation/ depression/ cuts/ gauges etc. in top surface and side slopes of the embankments including filling of cracks etc. utilizing the available earth of the embankments as per directions of the Engineer-in-charge so as to ensure free movement of vehicular traffic and better upkeep of embankment.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements