The Department Of Local Administration has issued a formal invitation for competitive bids for Strengthening Of Perumal Koil Street, Vadamattam At Melakasakudy Village In Nedungadu Commune Panchayat. in Karaikal, Pondicherry, with an estimated contract value of Rs. 15,29,774. The bid opening date for this tender is 09-05-2025 and the last date for bid submission is 23-05-2025. Interested bidders for Department Of Local Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Department Of Local Administration Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 May 2025
Closing Date23 May 2025
Tender Amount₹ 15,29,774
Costs
EMD
₹ 30,600Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DLA_18472_1Bid Award Id
ViewTender No
Ned. CP /A3/16/ 2024 - 25/ 197Tender Authority
Department Of Local Administration ViewPurchaser Address
-Website
http://http://www.dla.go.th/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen VG 30
61
8690
530093.6599999999
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision)
1523
14
22449.02
... More
Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material and using bitumen VG 30
39
11007
429291.72
... More
Providing and laying unscreened gravel boulders to a specified consolidated for sub base course including stacking of the material to the departmental gauge on road side for pre measurement. The volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. The rate shall including labour charges for spreading and hand packing to required camber and gradient, rolling with power roller, hire and fuel charges for all tools and plants employed and the cost of the boulders etc., complete as directed by the Engineer-in-charge.
27
1088
29395.98
... More
Engaging of Front end loader 1 cum bucket capacity as directed by the Engineer – in - Charge
8
1384
11074.24