Works Department Tender
... More
The Works Department has issued a formal invitation for competitive bids for Improvement To Road From Himitira Sanjamura Rd Road To Sanjamura Up School From 0.0km To 1.100km In The District Of Angul Under State Plan. in Dhenkanal, Odisha, with an estimated contract value of Rs. 71,66,854. The bid opening date for this tender is 11-03-2019 and the last date for bid submission is 16-03-2019. Interested bidders for Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 71,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_EICCL_54550_1Tender No
EE (R and B) Angul-75 / 2018-19Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
90 cm equilateral triangle
4
-
-
... More
Providing P.C.C. M-15 grade in Head wall & parapet of C.D. works including centering & shuttering as per approved drawing and technical specifications as per section 1500, 1700 & 2200 of MoRT&H specifications for Road & Bridge works (4th Revision) including basic cost, conveyance, royalties of all materials, cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-charge
38.5
-
-
... More
Loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction construction & clause 305 of MoSRT&H specifications for Road & Bridge works (4th revision) including labour cess but excluding GST
1480.5
-
-
... More
Providing and applying tack coat with rapid setting bitumen emulsion using emulsion pressure distributor @0.20 kg/sqm on prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MoRT&H specification for Road & Bridge works (4th revision) including basic cost of all materials, labour T&P required for the work including labour cess but excluding GST complete as per direction of the Engineer-in-charge
3595.5
-
-
... More
Supplying and filling foundation and plinth with sand well watered and rammed with basic cost, conveyance, royalities and of all materials including labour cess but excluding GST complete (Measurement to be taken on compacted section only)
769.28
-
-
... More
80 cm x 60 cm rectangular
4
-
-
... More
Providing P.C.C M-15 grade using 40 mm down graded chips below bed level of C.D works including centering, shuttering, dewatering as per approved drawing and technical specifications as per Section 1500, 1700 & 2200 of MoRT&H Specifications for Road & Bridge works (4th Revision) including basic cost, conveyance, royalties of all materials, cost of all labour, T&P, required for the work etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-charge
8.18
-
-
... More
Dismanting of prestressed / reinforced cement concrete grade M-15, M-20 incluidng T&P. & scaffolding where ever necessary sorting the dismantled materials disposal of unserviceable materials and stacking the serviceable materials with all lifts & lead of 1000m. with all labour, T&P. machineries etc. including labour cess but excluding GST complete as per specification & direction of the Engineer-in-charge
13.57
-
-
... More
Providing moorum on road flanks and collecting, conveying, supplying and stacking good laterite moorum of approved quality from approved quarry with basic cost, conveyance, royalties, of all materials labour, T&P etc. including labour cess but excluding GST complete as per the direction of the Engineer-in-charge
527.34
-
-
... More
Providing erecting upto 0.90sqm size retro reflectorised direction and place identification sign board as per IRC-67 made of high intensity grade sheeting vide clause no.801.3 fixed over aluminium sheeting 2 mm thick with area not exceeding 0.90sqm supported on a mild steel two angle iron post of 45x45x6mm size firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45x45x60cm, 60cm below ground level as kper approved drawing as kper clause no.801.08 for Road & Bridge works of MoRT&H (4th Revision) specification & direction of the Engineer-in-charge including labour cess but excluding GST a) 1000 mm x 1200 mm size
2.4
-
-
... More
Providing laying & fixing in position 1000 mm dia N.P.-4 R.C.C. Hume pipe in culvert including jointing with C.C.(1:3) including basic cost, conveyance, of all materials, T&P with all leads and lifts etc. including labour cess but excluding GST complete as per direction of Engineer-in-charge
10
-
-
... More
Rough stone dry packing in approns and revetments using 15cm to 30cm size black hard granite boulders of approved quality from approved quarry including filling the interstics with small stones, spalls etc. with basic cost, conveyance with all leads and lifts and cost of all materials, labour, royalty, T&P etc. including labour cess but excluding GST required for the work complete as directed by the Engineer-in-charge
3.89
-
-
... More
Removal of all type of Hume Pipes and stacking within a lead of 1000 meters incluing eath work and dismentaling of masonary works including T&P required for the work including labour cess but excluding GST complete as per direction of the Engineer-in-charge
5
-
-
... More
Construction of embankment with approved material obtained from borrow pit with all lifts & lead, transporting to site by mechanical means within a lead of 5 km spreading, grading to required slope and compacting to meet the requirement of table 300-2 & clause 305 of MoRT&H specification for Road & Bridge works (4th Revision) including basic cost, conveyance, royalties of all materials, cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-charge including ordinary compaction by PRR
13161
-
-
... More
Metal spall backing in the rear of abutments and wing walls using 4.5cm size black hard granite metal from approved quarry free from weathered skin and approaved quality including basic cost, conveyance, royalties and of all materials, cost of all labour and T & P etc. including labour cess but excluding GST complete
21.6
-
-
... More
90 cm high octagon
1
-
-
... More
Porvoding and laying 25mm thick Semi Dense Bituminous Concrete with batch type hot mix plant using crushed aggregates of Grading II premixed with bituminous binder 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoRT&H specification for Road & Bridge works (4th Revision) including basic cost, conveyance, royalties of all materials, cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per specification &direction of Engineer-in-charge
89.89
-
-
... More
Providing and applying primer coat by using bitumen emulsion slow setting on prepared surface of granular base including cleaning of road surface and spraying primer @ of 0.60 kg/sqm including basic cost of all materials, labour T&P required for the work including labour cess but excluding GST complete as per direction of the Engineer-in-charge
3595.5
-
-
... More
60 cm circular (speed limit)
2
-
-
... More
Providing, laying, spreading & compacting stone aggregates to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause No.406 of MoRT&H specifications for Road & Bridge work (4th Revision) including basic cost, conveyance, royalties of all materials, cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-charge
539.33
-
-
... More
Suplying fitting, fixing of R.C.C. guard posts (1:2:4) of 1.00m long 15cm dia with rainforcement as per approved specification and design and fixing to same with C.C. (1:3:6) pedestral of size 0.60 x 0.60 x 0.30m including excavation of earth etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge
100
-
-
... More
Ordinary Kilometer stone
2
-
-
... More
P.C.C. M-15 grade in using 40mm and down graded size (40 mm size 60%, 20 mm size 30% & 10 mm size 10%) in cut of wall and foundation of retaining wall, head wall using crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts including frame works, shoring shuttering dewatering if required including basic cost, conveyance, royalty, of all materials, cost of all labour, T&P etc. including labour cess but excluding GST complete as l[er direction of Engineer-in-charge
371.25
-
-
... More
PART-A (CIVIL WORKS)
Cleaning & grubbing the road land including uprooting the rank vegetations, grasses, bushes, the shurb jungle & tree up to 1.00 m girth including basic cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as directed by theEngineer-in-charge
5640
-
-
... More
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return walll with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV:2011 towards drawing foce complete as per drawing and Technical including basic cost of all materials, labour T&P required for the work including labour cess but excluding GST complete as per direction of the Engineer-in-charge
60
-
-
... More
Supplying, fitting, fixing of RCC pre-cast K.M. stone of prop. M-15 for O.D.R. road as per IRC specification and design including basic cost of all materials, labour, royalty, transportation charges of KM stone, T&P and reinforcement required for the work including cutting the earth and filling 150mm thick sand and making the pedestal of C.C. (1:3:6) of size 900mmx900mm bottom and 750mmx750mm top including providing C.C. (1:2:4) to a thickness of 75mm top over the pedestal including plastering the surfaces with 12mm thick (1:4) etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge.
200 mt.
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements