The Works Department has issued a formal invitation for competitive bids for Construction Of Approach Of Vup On Jajpur Bye Pass Road From 5/910k.m To 6/373k.m And 6/383k.m To 6/440k.m For The Year 2021-22. in Jajpur, Odisha, with an estimated contract value of Rs. 88,68,790. The bid opening date for this tender is 24-11-2021 and the last date for bid submission is 06-12-2021. Interested bidders for Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_EICCL_73051_1Bid Award Id
ViewTender No
Tender Call Notice No. S.E, PKL (RandB) 22/2021-22Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Clearing and grubbing road land including uprooting rank vegetation grass, bushes, shrubs, saplings and trees girth up to 300mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness including all cost, conveyance of materias, labour and T&P required for the work etc complete as per the direction of the Engineer-In-Charge.
14230.5
-
5.76
... More
Providing and laying Bituminous Macadam(BM) with 100-120 TPH hot mix plant producing an average ouput of 75 tonnes per hour using crushed aggregate of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alingnment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.
75.6
-
6924.75
... More
Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed meterial by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MORT&H specifications of road and bridge works (4th revision)
378
-
1685.91
... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60Kg/Sqm using mechanical means as per Clause 502 of MOSRT&H specifications for Road & Bridge works (4thh Revision) as per direction of the Engineer-In-Charge.
1512
-
26.3
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 Kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom including all cost, conveyance of materias, labour and T&P required for the work etc complete as per the direction of the Engineer-In-Charge.
1512
-
9.28
... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.508 complete in all respect.
37.8
-
9279.62